X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0405053316000"

m
m
 
Line 252: Line 252:
 
| style="text-align: right;" | 1875.40
 
| style="text-align: right;" | 1875.40
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1967-08-05
 
| Acid Treatment
 
| style="text-align: right;" | 1873.90
 
| style="text-align: right;" | 1875.40
 
| style="text-align: right;" | 0
 
|-
 
| 1972-10-06
 
| Acid Treatment
 
| style="text-align: right;" | 1873.90
 
| style="text-align: right;" | 1875.40
 
| style="text-align: right;" | 0
 
|-
 
| 2005-10-26
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1856.00
 
| style="text-align: right;" | 1864.00
 
| style="text-align: right;" | 0
 
|-
 
| 2005-10-26
 
| Perforation
 
| style="text-align: right;" | 1235.00
 
| style="text-align: right;" | 1235.50
 
| style="text-align: right;" | 13
 
|-
 
| 2005-10-27
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 1235.00
 
| style="text-align: right;" | 1235.50
 
| style="text-align: right;" | 0
 
|-
 
| 2005-10-27
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1141.00
 
| style="text-align: right;" | 1325.00
 
| style="text-align: right;" | 0
 
|-
 
| 2005-10-29
 
| Perforation
 
| style="text-align: right;" | 750.00
 
| style="text-align: right;" | 750.50
 
| style="text-align: right;" | 13
 
|-
 
| 2005-10-31
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 750.00
 
| style="text-align: right;" | 750.50
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 2005-10-31
 
| 2005-10-31
Line 359: Line 311:
 
| style="text-align: right;" | 442.00
 
| style="text-align: right;" | 442.00
 
| style="text-align: right;" | 450.00
 
| style="text-align: right;" | 450.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1967-08-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 1873.90
 +
| style="text-align: right;" | 1875.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 377: Line 335:
 
| style="text-align: right;" | 293.00
 
| style="text-align: right;" | 293.00
 
| style="text-align: right;" | 317.00
 
| style="text-align: right;" | 317.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1972-10-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 1873.90
 +
| style="text-align: right;" | 1875.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-10-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1856.00
 +
| style="text-align: right;" | 1864.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-10-26
 +
| Perforation
 +
| style="text-align: right;" | 1235.00
 +
| style="text-align: right;" | 1235.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-10-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1235.00
 +
| style="text-align: right;" | 1235.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-10-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1141.00
 +
| style="text-align: right;" | 1325.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-10-29
 +
| Perforation
 +
| style="text-align: right;" | 750.00
 +
| style="text-align: right;" | 750.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-10-31
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 750.00
 +
| style="text-align: right;" | 750.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 525: Line 525:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 05:38, 19 January 2021

Well Details

Well ID: 0405053316000
Loading map...
Location: 00/16-33-040-05W5/0
Location Alias: 00/16-33-40-05 W5M
Location Alias 2: 00/16-33-040-05 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 05
Section: 33
County/Municipality: Clearwater County
Well Name: PSEC WILLGR 16-33-40-5
Operator Name: Prairie Storm Energy Corp.
License Number: 0032399
License Date: 1967-07-04
License Status: Abandoned
Spud Date: 1967-07-05
Final Drill Date: 1967-07-13
Well Total Depth: 1895.90 m
Surface Hole Latitude: 52.492212
Surface Hole Longitude: -114.652472

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-04 Obtained License
1967-07-13 Finished Drilling
1967-07-13 Well Mode changed to Drilled and Cased
1967-07-15 Production Casing Operation Performed
1967-08-01 Perforation Treatment Performed - Jet Perforation
1967-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-07 Well Began Production
1967-08-07 Well Fluid changed to Crude Oil
1967-08-07 Well Mode changed to Flowing
1972-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-04 Well Fluid changed to Crude Oil
1973-07-04 Well Mode changed to Pumping
1979-10-11 Well Fluid changed to Crude Oil
1979-10-11 Well Mode changed to Suspended
2005-10-22 Well Log Performed
2005-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-26 Perforation Treatment Performed - Jet Perforation
2005-10-26 Plug Back Performed
2005-10-26 Well Fluid changed to Crude Oil
2005-10-26 Well Log Performed
2005-10-26 Well Mode changed to Abandoned Zone
2005-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-27 Perforation Treatment Performed - Remedial Casing
2005-10-29 Perforation Treatment Performed - Jet Perforation
2005-10-29 Well Log Performed
2005-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-31 Perforation Treatment Performed - Remedial Casing
2005-11-01 Well Log Performed
2005-11-03 Perforation Treatment Performed - Jet Perforation
2005-11-03 Well Log Performed
2005-11-04 Perforation Treatment Performed - Remedial Casing
2005-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-05 Perforation Treatment Performed - Jet Perforation
2005-11-05 Well Log Performed
2005-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-06 Perforation Treatment Performed - Remedial Casing
2005-11-07 Well Log Performed
2005-11-08 Perforation Treatment Performed - Jet Perforation
2005-11-08 Well Log Performed
2005-11-09 Perforation Treatment Performed - Remedial Casing
2005-11-10 Well Log Performed
2005-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-11 Perforation Treatment Performed - Jet Perforation
2005-11-11 Well Log Performed
2005-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-12 Perforation Treatment Performed - Remedial Casing
2005-11-13 Well Log Performed
2005-11-21 Well Abandoned
2005-11-21 Well Fluid changed to Crude Oil
2005-11-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-01 Perforation 1873.90 1875.40 13
2005-10-31 Packing Device Capped w/Cement 700.00 745.00 0
2005-11-03 Perforation 672.00 672.50 13
2005-11-04 Remedial Casing Cementing 672.00 672.50 0
2005-11-05 Perforation 555.00 555.50 13
2005-11-05 Packing Device Capped w/Cement 652.00 668.00 0
2005-11-06 Remedial Casing Cementing 555.00 555.50 0
2005-11-06 Packing Device Capped w/Cement 550.50 552.00 0
2005-11-08 Perforation 460.00 460.50 13
2005-11-09 Remedial Casing Cementing 460.00 460.50 0
2005-11-11 Packing Device Capped w/Cement 442.00 450.00 0
1967-08-05 Acid Treatment 1873.90 1875.40 0
2005-11-11 Perforation 320.00 320.50 13
2005-11-12 Remedial Casing Cementing 320.00 320.50 0
2005-11-12 Packing Device Capped w/Cement 293.00 317.00 0
1972-10-06 Acid Treatment 1873.90 1875.40 0
2005-10-26 Packing Device Capped w/Cement 1856.00 1864.00 0
2005-10-26 Perforation 1235.00 1235.50 13
2005-10-27 Remedial Casing Cementing 1235.00 1235.50 0
2005-10-27 Packing Device Capped w/Cement 1141.00 1325.00 0
2005-10-29 Perforation 750.00 750.50 13
2005-10-31 Remedial Casing Cementing 750.00 750.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 304 0.0 0.0 0.0
1968 5158 0.0 0.0 0.0
1969 6070 0.0 0.0 0.0
1970 8180 0.0 0.0 0.0
1971 8501 0.0 0.0 0.0
1972 8011 0.0 0.0 0.0
1973 7131 0.0 0.0 0.0
1974 8592 0.0 0.0 0.0
1975 6570 0.0 0.0 0.0
1976 7931 0.0 0.0 0.0
1977 7178 0.0 0.0 0.0
1978 7112 0.0 0.0 0.0
1979 3488 0.0 0.0 0.0

For data sources see[5]

References