If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 201: | Line 201: | ||
| style="text-align: right;" | 1543.50 | | style="text-align: right;" | 1543.50 | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1994-09-12 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1256.00 | ||
+ | | style="text-align: right;" | 1264.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1994-09-14 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 873.00 | ||
+ | | style="text-align: right;" | 878.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 1994-09-16 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 873.00 | ||
+ | | style="text-align: right;" | 878.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2004-09-20 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 551.50 | ||
+ | | style="text-align: right;" | 555.50 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2004-10-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 627.00 | ||
+ | | style="text-align: right;" | 632.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2004-10-13 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 627.00 | ||
+ | | style="text-align: right;" | 632.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1989-03-07 | | 1989-03-07 | ||
Line 249: | Line 285: | ||
| style="text-align: right;" | 1270.00 | | style="text-align: right;" | 1270.00 | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 510: | Line 510: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0214231206003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.766568,"lon":-113.063848,"icon":""}]} |
Location: 00/06-12-021-23W4/3 | |
Location Alias: 00/06-12-21-23 W4M | |
Location Alias 2: 00/06-12-021-23 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Siksika 146 | |
Well Name: HOUSTON SHOLDICE 6-12-21-23 | |
Operator Name: Houston Oil & Gas Ltd. | |
License Number: 0138672 | |
License Date: 1989-02-08 | |
License Status: Issued | |
Spud Date: 1989-02-13 | |
Final Drill Date: 1989-02-19 | |
Well Total Depth: 1582.00 m | |
Surface Hole Latitude: 50.766568 | |
Surface Hole Longitude: -113.063848 |
Date | Event |
---|---|
1989-02-08 | Obtained License |
1989-02-14 | Surface Casing Operation Performed |
1989-02-19 | Finished Drilling |
1989-02-19 | Well Log Performed |
1989-02-19 | Well Mode changed to Drilled and Cased |
1989-02-20 | Drill Stem Test Performed |
1989-02-21 | Production Casing Operation Performed |
1989-02-22 | Rig Released |
1989-03-03 | Well Log Performed |
1989-03-05 | Perforation Treatment Performed - Jet Perforation |
1989-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-11 | Well Log Performed |
1989-06-12 | Perforation Treatment Performed - Jet Perforation |
1989-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-06-13 | Perforation Treatment Performed - Cement Squeeze |
1990-07-05 | Well Log Performed |
1990-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-07-06 | Plug Back Performed |
1990-07-07 | Perforation Treatment Performed - Jet Perforation |
1992-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-10-10 | Perforation Treatment Performed - Jet Perforation |
1992-10-10 | Plug Back Performed |
1992-10-10 | Well Log Performed |
1994-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-09-12 | Well Log Performed |
1994-09-14 | Perforation Treatment Performed - Jet Perforation |
1994-09-14 | Well Log Performed |
1994-09-16 | Perforation Treatment Performed - Fractured |
1994-09-24 | Well Began Production |
1994-09-24 | Well Fluid changed to Gas |
1994-09-24 | Well Mode changed to Flowing |
2004-09-20 | Perforation Treatment Performed - Jet Perforation |
2004-10-05 | Perforation Treatment Performed - Jet Perforation |
2004-10-13 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-03-05 | Perforation | 1542.00 | 1543.50 | 13 |
1994-09-12 | Packing Device Capped w/Cement | 1256.00 | 1264.00 | 0 |
1994-09-14 | Perforation | 873.00 | 878.00 | 17 |
1994-09-16 | Fracture | 873.00 | 878.00 | 0 |
2004-09-20 | Perforation | 551.50 | 555.50 | 17 |
2004-10-05 | Perforation | 627.00 | 632.00 | 17 |
2004-10-13 | Fracture | 627.00 | 632.00 | 0 |
1989-03-07 | Acid Treatment | 1542.00 | 1543.50 | 0 |
1989-06-12 | Perforation | 1559.00 | 1559.50 | 8 |
1989-06-13 | Acid Treatment | 1559.00 | 1559.50 | 0 |
1989-06-13 | Cement Squeeze | 1559.00 | 1559.50 | 0 |
1990-07-06 | Packing Device Capped w/Cement | 1527.00 | 1535.00 | 0 |
1990-07-07 | Perforation | 1318.50 | 1320.00 | 14 |
1992-10-10 | Packing Device Capped w/Cement | 1308.00 | 1316.00 | 0 |
1992-10-10 | Perforation | 1268.50 | 1270.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2230 | 0.0 | 0.0 | 0.0 |
1995 | 7846 | 0.0 | 0.0 | 0.0 |
1996 | 8358 | 0.0 | 0.0 | 0.0 |
1997 | 8025 | 0.0 | 0.0 | 0.0 |
1998 | 7276 | 0.0 | 0.0 | 0.0 |
1999 | 7067 | 0.0 | 0.0 | 0.0 |
2000 | 8428 | 0.0 | 0.0 | 0.0 |
2001 | 7973 | 0.0 | 0.0 | 0.0 |
2002 | 8499 | 0.0 | 0.0 | 0.0 |
2003 | 8490 | 0.0 | 0.0 | 0.0 |
2004 | 8185 | 0.0 | 0.0 | 0.0 |
2005 | 8671 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8702 | 0.0 | 0.0 | 0.0 |
2011 | 8580 | 0.0 | 0.0 | 0.0 |
2012 | 8710 | 0.0 | 0.0 | 0.0 |
2013 | 8722 | 0.0 | 0.0 | 0.0 |
2014 | 8735 | 0.0 | 0.0 | 0.0 |
2015 | 8726 | 0.0 | 0.0 | 0.0 |
2016 | 8780 | 0.0 | 0.0 | 0.0 |
2017 | 8750 | 0.0 | 0.0 | 0.0 |
2018 | 8734 | 0.0 | 0.0 | 0.0 |
2019 | 316 | 0.0 | 0.0 | 0.0 |
For data sources see[5]