X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0324183101002"

m
m
 
Line 149: Line 149:
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
| Packing Device Capped w/Cement
+
| Perforation
| style="text-align: right;" | 410.00
+
| style="text-align: right;" | 213.50
| style="text-align: right;" | 418.00
+
| style="text-align: right;" | 214.30
| style="text-align: right;" | 0
+
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 369.50
+
| style="text-align: right;" | 207.50
| style="text-align: right;" | 370.10
+
| style="text-align: right;" | 208.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 367.40
+
| style="text-align: right;" | 201.40
| style="text-align: right;" | 368.70
+
| style="text-align: right;" | 202.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 319.50
+
| style="text-align: right;" | 199.20
| style="text-align: right;" | 320.00
+
| style="text-align: right;" | 199.90
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 312.50
+
| style="text-align: right;" | 197.80
| style="text-align: right;" | 313.30
+
| style="text-align: right;" | 198.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 260.20
+
| style="text-align: right;" | 184.80
| style="text-align: right;" | 260.50
+
| style="text-align: right;" | 185.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 218.30
+
| style="text-align: right;" | 172.20
| style="text-align: right;" | 219.20
+
| style="text-align: right;" | 172.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 216.20
+
| style="text-align: right;" | 164.20
| style="text-align: right;" | 217.10
+
| style="text-align: right;" | 164.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 213.50
+
| style="text-align: right;" | 149.00
| style="text-align: right;" | 214.30
+
| style="text-align: right;" | 149.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 2005-10-18
 +
| Fracture
 +
| style="text-align: right;" | 149.00
 +
| style="text-align: right;" | 370.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
| Perforation
+
| Packing Device Capped w/Cement
| style="text-align: right;" | 207.50
+
| style="text-align: right;" | 410.00
| style="text-align: right;" | 208.00
+
| style="text-align: right;" | 418.00
| style="text-align: right;" | 17
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 201.40
+
| style="text-align: right;" | 369.50
| style="text-align: right;" | 202.30
+
| style="text-align: right;" | 370.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 199.20
+
| style="text-align: right;" | 367.40
| style="text-align: right;" | 199.90
+
| style="text-align: right;" | 368.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 197.80
+
| style="text-align: right;" | 319.50
| style="text-align: right;" | 198.10
+
| style="text-align: right;" | 320.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 184.80
+
| style="text-align: right;" | 312.50
| style="text-align: right;" | 185.50
+
| style="text-align: right;" | 313.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 172.20
+
| style="text-align: right;" | 260.20
| style="text-align: right;" | 172.50
+
| style="text-align: right;" | 260.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 164.20
+
| style="text-align: right;" | 218.30
| style="text-align: right;" | 164.70
+
| style="text-align: right;" | 219.20
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2005-10-06
 
| 2005-10-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 149.00
+
| style="text-align: right;" | 216.20
| style="text-align: right;" | 149.30
+
| style="text-align: right;" | 217.10
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
|-
 
| 2005-10-18
 
| Fracture
 
| style="text-align: right;" | 149.00
 
| style="text-align: right;" | 370.10
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 408: Line 408:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:49, 30 January 2021

Well Details

Well ID: 0324183101002
Loading map...
Location: 00/01-31-032-18W4/2
Location Alias: 00/01-31-32-18 W4M
Location Alias 2: 00/01-31-032-18 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 18
Section: 31
County/Municipality: Starland County
Well Name: 981384 DELIA 1-31-32-18
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0335513
License Date: 2005-07-28
License Status: Issued
Spud Date: 2005-08-14
Final Drill Date: 2005-08-16
Well Total Depth: 650.00 m
Surface Hole Latitude: 51.782946
Surface Hole Longitude: -112.537797

For data sources see[1][2]

Well History

Date Event
2005-07-28 Obtained License
2005-08-14 Surface Casing Operation Performed
2005-08-15 Production Casing Operation Performed
2005-08-16 Finished Drilling
2005-08-16 Rig Released
2005-08-16 Well Mode changed to Drilled and Cased
2005-09-03 Well Log Performed
2005-09-21 Perforation Treatment Performed - Jet Perforation
2005-09-21 Well Log Performed
2005-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-06 Perforation Treatment Performed - Jet Perforation
2005-10-06 Plug Back Performed
2005-10-18 Perforation Treatment Performed - Fractured
2006-03-14 Well Began Production
2006-03-14 Well Fluid changed to Coalbed Methane-Coals Only
2006-03-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-21 Perforation 420.00 421.50 17
2005-10-06 Perforation 213.50 214.30 17
2005-10-06 Perforation 207.50 208.00 17
2005-10-06 Perforation 201.40 202.30 17
2005-10-06 Perforation 199.20 199.90 17
2005-10-06 Perforation 197.80 198.10 17
2005-10-06 Perforation 184.80 185.50 17
2005-10-06 Perforation 172.20 172.50 17
2005-10-06 Perforation 164.20 164.70 17
2005-10-06 Perforation 149.00 149.30 17
2005-10-18 Fracture 149.00 370.10 0
2005-10-06 Packing Device Capped w/Cement 410.00 418.00 0
2005-10-06 Perforation 369.50 370.10 17
2005-10-06 Perforation 367.40 368.70 17
2005-10-06 Perforation 319.50 320.00 17
2005-10-06 Perforation 312.50 313.30 17
2005-10-06 Perforation 260.20 260.50 17
2005-10-06 Perforation 218.30 219.20 17
2005-10-06 Perforation 216.20 217.10 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6934 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8514 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References