X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0344181814000"

m
m
 
Line 177: Line 177:
 
| style="text-align: right;" | 1145.00
 
| style="text-align: right;" | 1145.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2000-06-14
 +
| Perforation
 +
| style="text-align: right;" | 383.00
 +
| style="text-align: right;" | 385.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2000-06-19
 +
| Acid Treatment
 +
| style="text-align: right;" | 383.00
 +
| style="text-align: right;" | 385.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-06-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 362.00
 +
| style="text-align: right;" | 370.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-06-20
 +
| Perforation
 +
| style="text-align: right;" | 256.00
 +
| style="text-align: right;" | 257.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2000-06-20
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 256.00
 +
| style="text-align: right;" | 257.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-01-14
 
| 1984-01-14
Line 224: Line 254:
 
| style="text-align: right;" | 365.00
 
| style="text-align: right;" | 365.00
 
| style="text-align: right;" | 411.00
 
| style="text-align: right;" | 411.00
| style="text-align: right;" | 0
 
|-
 
| 2000-06-14
 
| Perforation
 
| style="text-align: right;" | 383.00
 
| style="text-align: right;" | 385.00
 
| style="text-align: right;" | 14
 
|-
 
| 2000-06-19
 
| Acid Treatment
 
| style="text-align: right;" | 383.00
 
| style="text-align: right;" | 385.00
 
| style="text-align: right;" | 0
 
|-
 
| 2000-06-20
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 362.00
 
| style="text-align: right;" | 370.00
 
| style="text-align: right;" | 0
 
|-
 
| 2000-06-20
 
| Perforation
 
| style="text-align: right;" | 256.00
 
| style="text-align: right;" | 257.00
 
| style="text-align: right;" | 13
 
|-
 
| 2000-06-20
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 256.00
 
| style="text-align: right;" | 257.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 330: Line 330:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 08:47, 31 January 2021

Well Details

Well ID: 0344181814000
Loading map...
Location: 00/14-18-034-18W4/0
Location Alias: 00/14-18-34-18 W4M
Location Alias 2: 00/14-18-034-18 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 18
Section: 18
County/Municipality: County of Stettler No. 6
Well Name: RANGER ET AL CHAIN LAKE 14-18-34-18
Operator Name: Postell Energy Co. Ltd.
License Number: 0104274
License Date: 1983-11-23
License Status: RecCertified
Spud Date: 1983-12-02
Final Drill Date: 1983-12-08
Well Total Depth: 1185.00 m
Surface Hole Latitude: 51.924549
Surface Hole Longitude: -112.546171

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-11-23 Obtained License
1983-12-08 Finished Drilling
1983-12-10 Production Casing Operation Performed
1983-12-10 Well Mode changed to Drilled and Cased
1984-01-12 Perforation Treatment Performed - Jet Perforation
1984-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-17 Perforation Treatment Performed - Fractured
1984-01-24 Perforation Treatment Performed - Jet Perforation
2000-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-05 Perforation Treatment Performed - Jet Perforation
2000-06-05 Plug Back Performed
2000-06-05 Well Log Performed
2000-06-06 Perforation Treatment Performed - Jet Perforation
2000-06-06 Perforation Treatment Performed - Remedial Casing
2000-06-14 Perforation Treatment Performed - Jet Perforation
2000-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-20 Perforation Treatment Performed - Jet Perforation
2000-06-20 Perforation Treatment Performed - Remedial Casing
2000-06-20 Plug Back Performed
2000-06-20 Well Fluid changed to Crude Oil
2000-06-20 Well Mode changed to Potential
2000-06-21 Well Abandoned
2000-06-21 Well Fluid changed to Crude Oil
2000-06-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-01-12 Perforation 1141.00 1145.00 13
2000-06-14 Perforation 383.00 385.00 14
2000-06-19 Acid Treatment 383.00 385.00 0
2000-06-20 Packing Device Capped w/Cement 362.00 370.00 0
2000-06-20 Perforation 256.00 257.00 13
2000-06-20 Remedial Casing Cementing 256.00 257.00 0
1984-01-14 Acid Treatment 1141.00 1145.00 0
1984-01-17 Fracture 1141.00 1145.00 0
1984-01-24 Perforation 1132.00 1135.00 13
2000-06-05 Packing Device Capped w/Cement 1112.00 1120.00 0
2000-06-05 Perforation 605.00 606.00 13
2000-06-06 Perforation 410.00 411.00 13
2000-06-06 Perforation 365.00 366.00 13
2000-06-06 Remedial Casing Cementing 365.00 411.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 240 0.0 0.0 0.0

For data sources see[5]

References