If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 213: | Line 213: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0615052610004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.2984,"lon":-114.638098,"icon":""}]} |
Location: 00/10-26-061-05W5/4 | |
Location Alias: 00/10-26-61-05 W5M | |
Location Alias 2: 00/10-26-061-05 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 05 | |
Section: 26 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: 981405 ET AL HZ NEERLND 10-26-61-5 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0413823 | |
License Date: 2009-11-10 | |
License Status: Amended | |
Spud Date: 2009-11-25 | |
Final Drill Date: 2010-01-07 | |
Well Total Depth: 1880.00 m | |
Surface Hole Latitude: 54.298400 | |
Surface Hole Longitude: -114.638098 |
Date | Event |
---|---|
2009-11-10 | Obtained License |
2009-11-26 | Surface Casing Operation Performed |
2009-11-27 | Direction Drilling Operation Performed - Horizontal |
2009-12-04 | Intermediate Casing Operation Performed |
2010-01-04 | Direction Drilling Operation Performed - Horizontal |
2010-01-07 | Direction Drilling Operation Performed - Horizontal |
2010-01-07 | Finished Drilling |
2010-01-07 | Perforation Treatment Performed - Open-Hole Completion |
2010-01-07 | Well Log Performed |
2010-01-07 | Well Structure changed to Drain |
2010-01-21 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-27 | 249.00 | Horizontal |
2010-01-04 | 1173.80 | Horizontal |
2010-01-07 | 1470.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-07 | Open Hole/Barefoot Completion | 1470.00 | 1880.00 | 0 |
For data sources see[5]