X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0855091803000"

m
m
 
Line 255: Line 255:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 23:51, 19 January 2021

Well Details

Well ID: 0855091803000
Loading map...
Location: 00/03-18-085-09W5/0
Location Alias: 00/03-18-85-09 W5M
Location Alias 2: 00/03-18-085-09 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 09
Section: 18
County/Municipality: Swampy Lake 236
Well Name: PETROMK ET AL LOON 3-18-85-9
Operator Name: Petromark Minerals Ltd.
License Number: 0073628
License Date: 1978-12-22
License Status: RecCertified
Spud Date: 1979-01-06
Final Drill Date: 1979-01-18
Well Total Depth: 1510.00 m
Surface Hole Latitude: 56.365441
Surface Hole Longitude: -115.416082

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-22 Obtained License
1979-01-16 Drill Stem Test Performed
1979-01-18 Finished Drilling
1979-01-20 Drill Stem Test Performed
1979-01-22 Production Casing Operation Performed
1979-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-09 Perforation Treatment Performed - Jet Perforation
1979-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-18 Well Mode changed to Drilled and Cased
1979-11-19 Well Began Production
1979-11-19 Well Fluid changed to Crude Oil
1979-11-19 Well Mode changed to Pumping
1980-09-01 Well Fluid changed to Crude Oil
1980-09-01 Well Mode changed to Suspended
1984-12-13 Well Log Performed
1984-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-14 Plug Back Performed
1984-12-14 Well Abandoned
1984-12-14 Well Fluid changed to Crude Oil
1984-12-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-09 Perforation 1389.50 1394.00 7
1979-03-09 Acid Treatment 1389.50 1394.00 0
1979-03-12 Acid Treatment 1389.50 1394.00 0
1984-12-14 Packing Device Capped w/Cement 1367.00 1375.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1308 0.0 0.0 0.0

For data sources see[5]

References