X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-34715"

m
m
Line 199: Line 199:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 01:55, 29 June 2014

Well Details

Well ID: 37-063-34715
Loading map...
Operator Name: INTERSTATE GAS MKT INC
First Permit Date: 2006-04-07
Last Permit Date: 2007-04-13
Spud Date: 2007-06-22
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.81293
Longitude: -78.907228

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 330.43 360.0 0.0 0.0 0.0 0.0
2011-0 738.82 352.0 0.0 0.0 0.0 0.0
2010-0 1315.81 300.0 0.0 0.0 0.0 0.0
2009-0 1602.89 365.0 0.0 0.0 0.0 0.0
2008-0 1502.53 330.0 0.0 0.0 0.0 0.0
2007-0 551.0 60.0 0.0 0.0 0.0 0.0
2006-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 130.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2008-0 BRINE 80.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2009-0 BRINE 355.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2009-0 BRINE 355.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-0 PRODUCED FLUID 330.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2012-0 PRODUCED FLUID 130.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1906181 2010-08-12 No Violations Noted Well tag in place. Well is equipped for production.

Tank appeared sound. Access road was stable, with no signs of accelerated erosion. Site was stabilized with adequate vegetation. No signs of accelerated erosion on site. No E&S issues found. No violations found.

References