X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494273601000"

m
m
Line 318: Line 318:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Revision as of 06:26, 19 January 2021

Well Details

Well ID: 0494273601000
Loading map...
Location: 00/01-36-049-27W4/0
Location Alias: 00/01-36-49-27 W4M
Location Alias 2: 00/01-36-049-27 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 27
Section: 36
County/Municipality: Calmar
Well Name: TEXACO CALMAR NO. 6 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0002037
License Date: 1950-09-16
License Status: RecExempt
Spud Date: 1950-09-19
Final Drill Date: 1950-10-20
Well Total Depth: 1667.30 m
Surface Hole Latitude: 53.266816
Surface Hole Longitude: -113.809227

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-09-16 Obtained License
1950-10-04 Drill Stem Test Performed
1950-10-14 Drill Stem Test Performed
1950-10-15 Drill Stem Test Performed
1950-10-16 Drill Stem Test Performed
1950-10-17 Drill Stem Test Performed
1950-10-18 Drill Stem Test Performed
1950-10-20 Drill Stem Test Performed
1950-10-20 Finished Drilling
1950-10-20 Well Mode changed to Drilled and Cased
1950-10-21 Production Casing Operation Performed
1950-10-24 Perforation Treatment Performed - Jet Perforation
1950-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-10-26 Well Began Production
1950-10-26 Well Fluid changed to Crude Oil
1950-10-26 Well Mode changed to Flowing
1950-11-09 Well Fluid changed to Crude Oil
1950-11-09 Well Mode changed to Pumping
1952-07-31 Perforation Treatment Performed - Bullet Perforation
1958-05-08 Perforation Treatment Performed - Acid Wash - No Pressure
1960-05-05 Perforation Treatment Performed - Cement Plug
1960-05-24 Well Abandoned
1960-05-24 Well Fluid changed to Crude Oil
1960-05-24 Well Mode changed to Abandoned
2013-07-13 Plug Back Performed
2015-07-31 Production Casing Operation Performed
2015-08-06 Well Log Performed
2015-08-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-24 Perforation 1586.80 1593.50 13
1950-10-26 Acid Treatment 1586.80 1593.50 0
1952-07-31 Bullet Perforation 1586.80 1593.50 13
1952-07-31 Bullet Perforation 1595.30 1597.20 26
1952-07-31 Bullet Perforation 1599.00 1600.80 26
1952-07-31 Bullet Perforation 1602.90 1604.80 26
1958-05-08 Acid Wash 1586.80 1604.80 0
1960-05-05 Cement Plug 1546.90 1610.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-15 No Incident Encountered 0.00 0.00
2015-08-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References