X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-37035"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-37035
 
| Well ID: 37-063-37035
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.436983, -79.145588 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.436983, -79.145588 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Indiana County, Pennsylvania|Indiana]]
 +
|-
 +
| Municipality: [[West Wheatfield Township, Indiana County, Pennsylvania|West Wheatfield Township]]
 
|-
 
|-
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: MARSH WEBSTER UNIT 1
 
|-
 
|-
 
| First Permit Date: 2011-01-27
 
| First Permit Date: 2011-01-27
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ORND
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.436983
 
| Latitude: 40.436983
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 2252.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 334.0
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 6004.0
 +
| style="text-align:right;" | 244.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 6004.0
+
| style="text-align:right;" | 2252.0
| style="text-align:right;" | 244.0
+
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 1903.0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 327.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 81: Line 106:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 140.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
 
| CREEKSIDE
 
| PA
 
|-
 
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 40.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-0
 
| 2011-0
Line 110: Line 113:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 121: Line 124:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 132: Line 135:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 143: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 154: Line 157:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 +
| JOSEPHINE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 65.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 166: Line 186:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1950635
 
| 1950635
Line 172: Line 194:
 
| At the time of this inspection, well site currently under construction. Well staked not yet drilled.  
 
| At the time of this inspection, well site currently under construction. Well staked not yet drilled.  
 
Site Id sign and Es plan present.  
 
Site Id sign and Es plan present.  
Bmp¿s installed according to plan. Access road still under construction, but recommend additional rock is added to ensure stability.  
+
Bmp﾿s installed according to plan. Access road still under construction, but recommend additional rock is added to ensure stability.  
 
No accelerated erosion or sedimentation issues noted.
 
No accelerated erosion or sedimentation issues noted.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 180: Line 204:
 
| 2011-02-17
 
| 2011-02-17
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, site Id sign and ES plan on site. Site actively being constructed. Well staked not yet drilled. Two unlined below grade pits located on site. Access road adequately rocked. Temporary bmp¿s installed according to plan. Operator should continue to maintain all bmp¿s until final permanent site restoration is achieved.  No accelerated erosion or sedimentation issues observed.
+
| At the time of inspection, site Id sign and ES plan on site. Site actively being constructed. Well staked not yet drilled. Two unlined below grade pits located on site. Access road adequately rocked. Temporary bmp﾿s installed according to plan. Operator should continue to maintain all bmp﾿s until final permanent site restoration is achieved.  No accelerated erosion or sedimentation issues observed.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 188: Line 214:
 
| No Violations Noted
 
| No Violations Noted
 
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Falcon was waiting on Mechanic problem with Accouter.  Anticipated depth to 4900 ft.
 
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Falcon was waiting on Mechanic problem with Accouter.  Anticipated depth to 4900 ft.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 194: Line 222:
 
| 2011-02-24
 
| 2011-02-24
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, Id sign and ES plan present. Access road stable and adequately rocked. Rig onsite, but drilling has not yet commenced. Two pits located onsite adequately lined and surrounded by security fence. Freeboard levels ok, as pits have not yet been used. Operator plans to dispose of cuttings onsite, further information will be obtained from Kriebel to determine whether land farming or encapsulation is being utilized.  Noted that both pits contained snow. Temporary bmp¿s installed according to plan and functioning properly. No accelerated erosion or sedimentation or IW issues noted. Recommend that operator continue to closely monitor and maintain township and all temporary bmp¿s until final, permanent restoration activities have been completed.
+
| At the time of inspection, Id sign and ES plan present. Access road stable and adequately rocked. Rig onsite, but drilling has not yet commenced. Two pits located onsite adequately lined and surrounded by security fence. Freeboard levels ok, as pits have not yet been used. Operator plans to dispose of cuttings onsite, further information will be obtained from Kriebel to determine whether land farming or encapsulation is being utilized.  Noted that both pits contained snow. Temporary bmp﾿s installed according to plan and functioning properly. No accelerated erosion or sedimentation or IW issues noted. Recommend that operator continue to closely monitor and maintain township and all temporary bmp﾿s until final, permanent restoration activities have been completed.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 201: Line 231:
 
| 2011-03-01
 
| 2011-03-01
 
| No Violations Noted
 
| No Violations Noted
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Conductor pipe (13 3/8¿) set at 42 ft (sand). 1st Stringer (9 5/8¿)set at 462 ft with 190 sks class a with 6 bbl return.  Plug down at 4:50 hrs on 3/1/11.  Crew waiting the 8 hrs.
+
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Conductor pipe (13 3/8﾿) set at 42 ft (sand). 1st Stringer (9 5/8﾿)set at 462 ft with 190 sks class a with 6 bbl return.  Plug down at 4:50 hrs on 3/1/11.  Crew waiting the 8 hrs.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 208: Line 240:
 
| 2011-03-03
 
| 2011-03-03
 
| No Violations Noted
 
| No Violations Noted
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Conductor pipe (13 3/8¿) set at 42 ft (sand). 1st Stringer (9 5/8¿) set at 462 ft with 190 sks class a with 6 bbl return.  Plug down at 4:50 hrs on 3/1/11.  After, the 8 hrs, Falcon attempted to drill out plug but cement was not set up.  Hence, Flacon added additional 50 sks of Class A using Superior.  Waited the 8 hrs and drilled to 2021 ft to set 7¿ pipe.  Cementing the 7¿ pipe at noon.
+
| Well sign present.  E&S controls were implemented.  At the time of inspection, no E&S or IW issues.  Pit covered with 30 mil plastic and security fence.  No freeboard issue.  Falcon was contracted.  Conductor pipe (13 3/8﾿) set at 42 ft (sand). 1st Stringer (9 5/8﾿) set at 462 ft with 190 sks class a with 6 bbl return.  Plug down at 4:50 hrs on 3/1/11.  After, the 8 hrs, Falcon attempted to drill out plug but cement was not set up.  Hence, Flacon added additional 50 sks of Class A using Superior.  Waited the 8 hrs and drilled to 2021 ft to set 7﾿ pipe.  Cementing the 7﾿ pipe at noon.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 216: Line 250:
 
| No Violations Noted
 
| No Violations Noted
 
| Tag present Drilled in prodcution. No ES. Appears restored, ground partially snow covered.
 
| Tag present Drilled in prodcution. No ES. Appears restored, ground partially snow covered.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 00:39, 26 June 2015

Well Details

Well ID: 37-063-37035
Loading map...
County: Indiana
Municipality: West Wheatfield Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: MARSH WEBSTER UNIT 1
First Permit Date: 2011-01-27
Last Permit Date: 2011-01-27
Spud Date: 2011-02-25
Unconventional: No
Horizontal: No
Well Status: ORND
Violations: 0
Latitude: 40.436983
Longitude: -79.145588

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 6004.0 244.0 0.0 0.0 0.0 0.0
2012-0 3458.0 333.0 0.0 0.0 0.0 0.0
2013-0 2252.0 334.0 0.0 0.0 0.0 0.0
2014-0 1903.0 327.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 DRILLING FLUID WASTE 540.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 FRACING FLUID WASTE 780.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 FRACING FLUID WASTE 840.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 140.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2012-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2014-0 PRODUCED FLUID 65.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1950635 2011-02-04 No Violations Noted At the time of this inspection, well site currently under construction. Well staked not yet drilled.

Site Id sign and Es plan present. Bmp﾿s installed according to plan. Access road still under construction, but recommend additional rock is added to ensure stability. No accelerated erosion or sedimentation issues noted.

1950760 2011-02-17 No Violations Noted At the time of inspection, site Id sign and ES plan on site. Site actively being constructed. Well staked not yet drilled. Two unlined below grade pits located on site. Access road adequately rocked. Temporary bmp﾿s installed according to plan. Operator should continue to maintain all bmp﾿s until final permanent site restoration is achieved. No accelerated erosion or sedimentation issues observed.
1952705 2011-02-24 No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit covered with 30 mil plastic and security fence. No freeboard issue. Falcon was contracted. Falcon was waiting on Mechanic problem with Accouter. Anticipated depth to 4900 ft.
1953375 2011-02-24 No Violations Noted At the time of inspection, Id sign and ES plan present. Access road stable and adequately rocked. Rig onsite, but drilling has not yet commenced. Two pits located onsite adequately lined and surrounded by security fence. Freeboard levels ok, as pits have not yet been used. Operator plans to dispose of cuttings onsite, further information will be obtained from Kriebel to determine whether land farming or encapsulation is being utilized. Noted that both pits contained snow. Temporary bmp﾿s installed according to plan and functioning properly. No accelerated erosion or sedimentation or IW issues noted. Recommend that operator continue to closely monitor and maintain township and all temporary bmp﾿s until final, permanent restoration activities have been completed.
1953543 2011-03-01 No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit covered with 30 mil plastic and security fence. No freeboard issue. Falcon was contracted. Conductor pipe (13 3/8﾿) set at 42 ft (sand). 1st Stringer (9 5/8﾿)set at 462 ft with 190 sks class a with 6 bbl return. Plug down at 4:50 hrs on 3/1/11. Crew waiting the 8 hrs.
1954868 2011-03-03 No Violations Noted Well sign present. E&S controls were implemented. At the time of inspection, no E&S or IW issues. Pit covered with 30 mil plastic and security fence. No freeboard issue. Falcon was contracted. Conductor pipe (13 3/8﾿) set at 42 ft (sand). 1st Stringer (9 5/8﾿) set at 462 ft with 190 sks class a with 6 bbl return. Plug down at 4:50 hrs on 3/1/11. After, the 8 hrs, Falcon attempted to drill out plug but cement was not set up. Hence, Flacon added additional 50 sks of Class A using Superior. Waited the 8 hrs and drilled to 2021 ft to set 7﾿ pipe. Cementing the 7﾿ pipe at noon.
2038285 2012-01-30 No Violations Noted Tag present Drilled in prodcution. No ES. Appears restored, ground partially snow covered.

For data sources see[3]

References