X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30447"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30447
 
| Well ID: 37-005-30447
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.625344, -79.362335 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.625344, -79.362335 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Armstrong County, Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[South Bend Township, Armstrong County, Pennsylvania|South Bend Township]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: G TOY 1
 
|-
 
|-
 
| First Permit Date: 2009-12-15
 
| First Permit Date: 2009-12-15
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.625344
 
| Latitude: 40.625344
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2009-0
| style="text-align:right;" | 2254.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 43: Line 53:
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2010-0
| style="text-align:right;" | 3504.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 366.0
+
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2012-0
 +
| style="text-align:right;" | 3504.0
 +
| style="text-align:right;" | 366.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 2254.0
 +
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2014-0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 1473.0
| style="text-align:right;" | 0.0
+
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 79: Line 98:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 90: Line 115:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 50.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
 
| DRILLING FLUID WASTE
 
| DRILLING FLUID WASTE
| style="text-align:right;" | 1310.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 119: Line 133:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 130: Line 144:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 25.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
| CREEKSIDE TREATMENT FACILITY
 +
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 142: Line 173:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1847093
 
| 1847093
Line 147: Line 180:
 
| No Violations Noted
 
| No Violations Noted
 
| Site inspection and E&S plan review found issues with the utilization of encaspulation and below grade drill pits and the depth to the seasonal high groundwater table.  A revised E&S plan was submitted addressing those issues through land farming and elevated drill pits, and additional contingency options should during site construction it be discovered that landfarming and or pits will not be able to be utilized, steel tanks will be utilized and the cuttings will be hauled to a landfill.  The remainder of the E&S plan, as compiled, should effectively minimize accelerated erosion & sedimentation, provided the plan is implemented and maintained properly.
 
| Site inspection and E&S plan review found issues with the utilization of encaspulation and below grade drill pits and the depth to the seasonal high groundwater table.  A revised E&S plan was submitted addressing those issues through land farming and elevated drill pits, and additional contingency options should during site construction it be discovered that landfarming and or pits will not be able to be utilized, steel tanks will be utilized and the cuttings will be hauled to a landfill.  The remainder of the E&S plan, as compiled, should effectively minimize accelerated erosion & sedimentation, provided the plan is implemented and maintained properly.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 154: Line 189:
 
| No Violations Noted
 
| No Violations Noted
 
| Site had been constructed as outlined in the E&S plan.  Silt fencing and haybales required replacement.  Spoke with operator representative Robert Carnahan onsite and silt sox will be installed on 09/27/10.  No accelerated erosion & sedimentation was observed in relation to the well-site or access road.  Below grade pit onsite and it had more than the required two feet of lined freeboard.  Operator should endeavor to reclaim the site and close the pit upon completion of drilling and any stimulation activities and implement BMP's as necessary to insure erosion & sedimentation is minimized through the fall and winter months.
 
| Site had been constructed as outlined in the E&S plan.  Silt fencing and haybales required replacement.  Spoke with operator representative Robert Carnahan onsite and silt sox will be installed on 09/27/10.  No accelerated erosion & sedimentation was observed in relation to the well-site or access road.  Below grade pit onsite and it had more than the required two feet of lined freeboard.  Operator should endeavor to reclaim the site and close the pit upon completion of drilling and any stimulation activities and implement BMP's as necessary to insure erosion & sedimentation is minimized through the fall and winter months.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 161: Line 198:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling appeared to have been completed at the time of the inspection.  Silt fencing has been replaced with silt sox for erosion control.  No accelerated erosion & sedimentation was observed in relation to the access road or well-site.  Below grade drill pit located onsite and it had more than the required two feet of lined freeboard.
 
| Drilling appeared to have been completed at the time of the inspection.  Silt fencing has been replaced with silt sox for erosion control.  No accelerated erosion & sedimentation was observed in relation to the access road or well-site.  Below grade drill pit located onsite and it had more than the required two feet of lined freeboard.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 168: Line 207:
 
| No Violations Noted
 
| No Violations Noted
 
| drilling - 798ft/E&S ok/ID&pit ok
 
| drilling - 798ft/E&S ok/ID&pit ok
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 175: Line 216:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling complete/. Well equipped for production.Site graded and mulched. No open pits.
 
| Drilling complete/. Well equipped for production.Site graded and mulched. No open pits.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 182: Line 225:
 
| No Violations Noted
 
| No Violations Noted
 
| ell appeared to be equipped for production at the time of the inspection.  Brine tank located onsite and it appeared to be in sound condition.  Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
| ell appeared to be equipped for production at the time of the inspection.  Brine tank located onsite and it appeared to be in sound condition.  Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 03:23, 26 June 2015

Well Details

Well ID: 37-005-30447
Loading map...
County: Armstrong
Municipality: South Bend Township
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: G TOY 1
First Permit Date: 2009-12-15
Last Permit Date: 2009-12-15
Spud Date: 2010-09-21
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.625344
Longitude: -79.362335

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 4332.0 334.0 0.0 0.0 0.0 0.0
2012-0 3504.0 366.0 0.0 0.0 0.0 0.0
2013-0 2254.0 365.0 0.0 0.0 0.0 0.0
2014-0 1473.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-0 PRODUCED FLUID 15.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2012-0 PRODUCED FLUID 50.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2014-0 PRODUCED FLUID 25.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1847093 2009-11-16 No Violations Noted Site inspection and E&S plan review found issues with the utilization of encaspulation and below grade drill pits and the depth to the seasonal high groundwater table. A revised E&S plan was submitted addressing those issues through land farming and elevated drill pits, and additional contingency options should during site construction it be discovered that landfarming and or pits will not be able to be utilized, steel tanks will be utilized and the cuttings will be hauled to a landfill. The remainder of the E&S plan, as compiled, should effectively minimize accelerated erosion & sedimentation, provided the plan is implemented and maintained properly.
1918551 2010-09-24 No Violations Noted Site had been constructed as outlined in the E&S plan. Silt fencing and haybales required replacement. Spoke with operator representative Robert Carnahan onsite and silt sox will be installed on 09/27/10. No accelerated erosion & sedimentation was observed in relation to the well-site or access road. Below grade pit onsite and it had more than the required two feet of lined freeboard. Operator should endeavor to reclaim the site and close the pit upon completion of drilling and any stimulation activities and implement BMP's as necessary to insure erosion & sedimentation is minimized through the fall and winter months.
1918553 2010-10-07 No Violations Noted Drilling appeared to have been completed at the time of the inspection. Silt fencing has been replaced with silt sox for erosion control. No accelerated erosion & sedimentation was observed in relation to the access road or well-site. Below grade drill pit located onsite and it had more than the required two feet of lined freeboard.
1920400 2010-09-24 No Violations Noted drilling - 798ft/E&S ok/ID&pit ok
1961082 2011-03-25 No Violations Noted Drilling complete/. Well equipped for production.Site graded and mulched. No open pits.
2125186 2012-12-21 No Violations Noted ell appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[3]

References