X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20272"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20272
 
| Well ID: 37-111-20272
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.93376, -79.001322 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.93376, -79.001322 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Somerset County, Pennsylvania|Somerset]]
 
| County: [[Somerset County, Pennsylvania|Somerset]]
Line 9: Line 9:
 
| Municipality: [[Brothersvalley Township, Somerset County, Pennsylvania|Brothersvalley Township]]
 
| Municipality: [[Brothersvalley Township, Somerset County, Pennsylvania|Brothersvalley Township]]
 
|-
 
|-
| Operator Name: [[SAMSON RES CO|SAMSON RES CO]]
+
| Operator Name: [[SAMSON RES CO]]
 
|-
 
|-
| Well Pad ID: [[148877]]
+
| Well Pad ID: [[148877|148877]]
 
|-
 
|-
 
| Farm/Lease Name: MENHORN 2H
 
| Farm/Lease Name: MENHORN 2H
Line 25: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 1
 
| Violations: 1
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 1782058
+
| 2010-3
| 2009-04-02
+
| style="text-align:right;" | 76520.0
| No Violations Noted
+
| style="text-align:right;" | 187.0
| Horizontal well not drilled. Currently, drilling the vertical well, E&S plan on-site, E&S ok.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1812029
+
| 2009-0
| 2009-07-10
+
| style="text-align:right;" | 5767.0
| No Violations Noted
+
| style="text-align:right;" | 365.0
| E&S plan and site plan posted at front of access road. Met John Blebians at field trailer.  Reviewed progress of drilling horizontal well.  Running at 50 ft/hr.  Patterson Rig 163. Current depth at 5,372 ft below grade at 11 % degree drilling vector.  11 3/4" pipe installed to 508 ft. with 150 sacks lead cement and followed by 150 sacks tail and 20 barrels circulated.  8 5/8" to 3490 ft with 710 sacks lead followed by 140 sacks tail with 90 barrels circulated.  Inspected pit.  No freeboard issues and pit is aligned with plastic.  Small trench installed around drilling equipment to collect and releases.  Slight droplets of oil located near storage bends.  Collected in trench which was draining to pit.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1812917
+
| 2010-2
| 2009-07-15
+
| style="text-align:right;" | 52211.0
| Violation(s) Noted
+
| style="text-align:right;" | 177.0
| A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning.  The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road.  This is a Horizontal Marcellus well.
+
| style="text-align:right;" | 0.0
| 567065
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1812917
+
| 2010-2
| 2009-07-15
+
| style="text-align:right;" | 52211.0
| Violation(s) Noted
+
| style="text-align:right;" | 177.0
| A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning.  The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road.  This is a Horizontal Marcellus well.
+
| style="text-align:right;" | 0.0
| 567065
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1821097
+
| 2011-1
| 2009-08-13
+
| style="text-align:right;" | 41764.0
| No Violations Noted
+
| style="text-align:right;" | 177.0
| A CEI inspection was performed to evaluate the area in which a spill had occurred on 7/7/09. The incident was reported to the DEP. The spill was contained and cleaned up immediately using pads. There were no signs of residuals on the site at the time of the inspection. No signs of erosion and sedimentation at the well site. Pit maintaining freeboard. A large freshwater pit was being constructed at the time of the inspection.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 1822540
+
| 2011-2
| 2009-08-14
+
| style="text-align:right;" | 36110.0
| No Violations Noted
+
| style="text-align:right;" | 182.0
| E&S plan and site plan posted at front of access road.  Met John Blebians at field trailer.  Reviewed progress of drilling horizontal well.    Patterson Rig 163 completed drilling to depth of 12,148 ft TD (8,336 ft lateral).  Inspected pit.  No freeboard issues and pit is aligned with plastic.  Small trench installed around drilling equipment to collect and any releases.  Samson in the process of completing frac pit located on the eastern portion of the site.
 
|
 
|-
 
|-
 
| 1837086
 
| 2009-10-08
 
| No Violations Noted
 
| At the time of inspection, the well was drilled and prepared for hydro fracturing. The well was properly signed with E&S plan onsite. The access road was in good condition. No accelerated E&S issues were noted in relation to well site or access road. Pits sustained 2 ft of freeboard. It is recommended that pit freeboard continued to be monitored closely as areas of the pit were approaching  the 2ft limitation.
 
|
 
|-
 
|-
 
| 1889551
 
| 2010-06-02
 
| No Violations Noted
 
| At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009. Final restoration activities were underway during inspection. Pits were removed and backfilled, mulch and seed were being added at time of inspection. Well pad was rocked. I was informed by contractor, that farmer plans to utilize fields to perimeter around well pad, which will be seeded and mulched approximately 25-50ft from edge of rock pad.  No accelerated E&S issues were noted in relation to well site or access road. Noted that two tanks were onsite and appeared sound. Dept requested that a container of methanol be removed from direct sunlight near pump station. A follow up inspection will be conducted to ensure final restoration activities have been completed and successful growth is achieved as well as removal of methanol barrel. Note: Operator noted that weather was a factor in timing of restoration activities.
 
|
 
|-
 
|-
 
| 1927162
 
| 2010-11-10
 
| No Violations Noted
 
| At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009.
 
Site adequately and permanently restored with both rock and vegetation.
 
All pits removed.
 
All temporary bmps removed.
 
No accelerated erosion or sedimentation issues noted in relation to site or access road.
 
Brine tanks sound. 
 
 
 
|
 
|-
 
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
| 2012-2
 
| style="text-align:right;" | 25805.0
 
| style="text-align:right;" | 184.0
 
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 139: Line 107:
 
|-
 
|-
 
|-
 
|-
| 2011-2
+
| 2012-2
| style="text-align:right;" | 36110.0
+
| style="text-align:right;" | 25805.0
| style="text-align:right;" | 182.0
+
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 27217.0
 +
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 148: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2011-1
+
| 2013-2
| style="text-align:right;" | 41764.0
+
| style="text-align:right;" | 68268.0
| style="text-align:right;" | 177.0
+
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 157: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2010-2
+
| 2014-1
| style="text-align:right;" | 52211.0
+
| style="text-align:right;" | 22368.0
| style="text-align:right;" | 177.0
+
| style="text-align:right;" | 181.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 166: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2010-3
+
| 2014-2
| style="text-align:right;" | 76520.0
+
| style="text-align:right;" | 23060.0
| style="text-align:right;" | 187.0
+
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 175: Line 152:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2015-01
| style="text-align:right;" | 5767.0
+
| style="text-align:right;" | 2856.0
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 184: Line 161:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 195: Line 178:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1733.3
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
|-
 
|-
 
| 2009-0
 
| BRINE
 
| style="text-align:right;" | 50127.0
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
|
 
| FRANKLIN BRINE -- FRANKLIN PLT
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2010-3
 
| 2010-3
 
| DRILLING FLUID WASTE
 
| DRILLING FLUID WASTE
| style="text-align:right;" | 6054.76
+
| style="text-align:right;" | 6.0
 
| Bbl
 
| Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 230: Line 191:
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| FRACING FLUID WASTE
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 24219.8
+
| style="text-align:right;" | 138.1
 
| Bbl
 
| Bbl
| PUBLIC SEWAGE TREATMENT PLANT
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0026034
+
| PA0101508
| DORNICK POINT WWTP
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
| JOHNSTOWN
+
| FRANKLIN
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| PRODUCED FLUID
+
| FRACING FLUID WASTE
| style="text-align:right;" | 3450.07
+
| style="text-align:right;" | 24.0
 
| Bbl
 
| Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT
Line 252: Line 213:
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| DRILLING FLUID WASTE
+
| FRACING FLUID WASTE
| style="text-align:right;" | 138.1
+
| style="text-align:right;" | 19.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
Line 263: Line 224:
 
|-
 
|-
 
| 2010-3
 
| 2010-3
| FRACING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 19714.3
+
| style="text-align:right;" | 3.0
 
| Bbl
 
| Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| PUBLIC SEWAGE TREATMENT PLANT
| PA0101508
+
| PA0026034
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| DORNICK POINT WWTP
| FRANKLIN
+
| JOHNSTOWN
 
| PA
 
| PA
 
|-
 
|-
Line 275: Line 236:
 
| 2010-3
 
| 2010-3
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 4495.24
+
| style="text-align:right;" | 4.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| FRANKLIN
 
| PA
 
| PA
Line 290: Line 251:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 301: Line 262:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 +
| PA
 +
|-
 +
|-
 +
| 2009-0
 +
| BRINE
 +
| style="text-align:right;" | 50.0
 +
| Bbl
 +
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 +
| PA0101508
 +
| PA BRINE
 +
|
 
| PA
 
| PA
 
|-
 
|-
Line 308: Line 280:
 
| 2010-2
 
| 2010-2
 
| PRODUCED FLUID
 
| PRODUCED FLUID
| style="text-align:right;" | 1619.62
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 323: Line 295:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 334: Line 306:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 356: Line 328:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 367: Line 339:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
Line 378: Line 350:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
+
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| MOUNT PLEASANT
 
| PA
 
| PA
Line 389: Line 361:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
| RESERVED ENVIRONMENTAL SERVICES
+
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 2012-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 2013-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 531.95
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 1.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 532.92
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 603.14
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 +
| MOUNT PLEASANT
 +
| PA
 +
|-
 +
|-
 +
| 15-Jan
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 315.7
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0254185
 +
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| MOUNT PLEASANT
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 1782058
 +
| 2009-04-02
 +
| No Violations Noted
 +
| Horizontal well not drilled.  Currently, drilling the vertical well, E&S plan on-site, E&S ok.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1812029
 +
| 2009-07-10
 +
| No Violations Noted
 +
| E&S plan and site plan posted at front of access road.  Met John Blebians at field trailer.  Reviewed progress of drilling horizontal well.  Running at 50 ft/hr.  Patterson Rig 163. Current depth at 5,372 ft below grade at 11 % degree drilling vector.  11 3/4" pipe installed to 508 ft. with 150 sacks lead cement and followed by 150 sacks tail and 20 barrels circulated.  8 5/8" to 3490 ft with 710 sacks lead followed by 140 sacks tail with 90 barrels circulated.  Inspected pit.  No freeboard issues and pit is aligned with plastic.  Small trench installed around drilling equipment to collect and releases.  Slight droplets of oil located near storage bends.  Collected in trench which was draining to pit.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1812917
 +
| 2009-07-15
 +
| Violation(s) Noted
 +
| A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning.  The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road.  This is a Horizontal Marcellus well.
 +
| 567065
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 +
|-
 +
|-
 +
| 1812917
 +
| 2009-07-15
 +
| Violation(s) Noted
 +
| A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning.  The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road.  This is a Horizontal Marcellus well.
 +
| 567065
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 +
|-
 +
|-
 +
| 1821097
 +
| 2009-08-13
 +
| No Violations Noted
 +
| A CEI inspection was performed to evaluate the area in which a spill had occurred on 7/7/09. The incident was reported to the DEP. The spill was contained and cleaned up immediately using pads. There were no signs of residuals on the site at the time of the inspection. No signs of erosion and sedimentation at the well site. Pit maintaining freeboard. A large freshwater pit was being constructed at the time of the inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1822540
 +
| 2009-08-14
 +
| No Violations Noted
 +
| E&S plan and site plan posted at front of access road.  Met John Blebians at field trailer.  Reviewed progress of drilling horizontal well.    Patterson Rig 163 completed drilling to depth of 12,148 ft TD (8,336 ft lateral).  Inspected pit.  No freeboard issues and pit is aligned with plastic.  Small trench installed around drilling equipment to collect and any releases.  Samson in the process of completing frac pit located on the eastern portion of the site.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1837086
 +
| 2009-10-08
 +
| No Violations Noted
 +
| At the time of inspection, the well was drilled and prepared for hydro fracturing. The well was properly signed with E&S plan onsite. The access road was in good condition. No accelerated E&S issues were noted in relation to well site or access road. Pits sustained 2 ft of freeboard. It is recommended that pit freeboard continued to be monitored closely as areas of the pit were approaching  the 2ft limitation.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1889551
 +
| 2010-06-02
 +
| No Violations Noted
 +
| At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009. Final restoration activities were underway during inspection. Pits were removed and backfilled, mulch and seed were being added at time of inspection. Well pad was rocked. I was informed by contractor, that farmer plans to utilize fields to perimeter around well pad, which will be seeded and mulched approximately 25-50ft from edge of rock pad.  No accelerated E&S issues were noted in relation to well site or access road. Noted that two tanks were onsite and appeared sound. Dept requested that a container of methanol be removed from direct sunlight near pump station. A follow up inspection will be conducted to ensure final restoration activities have been completed and successful growth is achieved as well as removal of methanol barrel. Note: Operator noted that weather was a factor in timing of restoration activities.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1927162
 +
| 2010-11-10
 +
| No Violations Noted
 +
| At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009.
 +
Site adequately and permanently restored with both rock and vegetation.
 +
All pits removed.
 +
All temporary bmps removed.
 +
No accelerated erosion or sedimentation issues noted in relation to site or access road.
 +
Brine tanks sound. 
  
 +
|
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Inspection Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 10:45, 26 June 2015

Well Details

Well ID: 37-111-20272
Loading map...
County: Somerset
Municipality: Brothersvalley Township
Operator Name: SAMSON RES CO
Well Pad ID: 148877
Farm/Lease Name: MENHORN 2H
First Permit Date: 2009-03-04
Last Permit Date: 2009-03-04
Spud Date: 2009-06-03
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 1
Latitude: 39.93376
Longitude: -79.001322

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 76520.0 187.0 0.0 0.0 0.0 0.0
2009-0 5767.0 365.0 0.0 0.0 0.0 0.0
2010-2 52211.0 177.0 0.0 0.0 0.0 0.0
2010-2 52211.0 177.0 0.0 0.0 0.0 0.0
2011-1 41764.0 177.0 0.0 0.0 0.0 0.0
2011-2 36110.0 182.0 0.0 0.0 0.0 0.0
2012-1 39326.0 181.0 0.0 0.0 0.0 0.0
2012-2 25805.0 184.0 0.0 0.0 0.0 0.0
2013-1 27217.0 181.0 0.0 0.0 0.0 0.0
2013-2 68268.0 181.0 0.0 0.0 0.0 0.0
2014-1 22368.0 181.0 0.0 0.0 0.0 0.0
2014-2 23060.0 184.0 0.0 0.0 0.0 0.0
2015-01 2856.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 DRILLING FLUID WASTE 6.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 DORNICK POINT WWTP JOHNSTOWN PA
2010-3 DRILLING FLUID WASTE 138.1 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 FRACING FLUID WASTE 24.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 DORNICK POINT WWTP JOHNSTOWN PA
2010-3 FRACING FLUID WASTE 19.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 PRODUCED FLUID 3.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034 DORNICK POINT WWTP JOHNSTOWN PA
2010-3 PRODUCED FLUID 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-3 PRODUCED FLUID 898.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-3 PRODUCED FLUID 544.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2009-0 BRINE 50.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0101508 PA BRINE PA
2010-2 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 PRODUCED FLUID 100.78 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 PRODUCED FLUID 789.62 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 PRODUCED FLUID 112.57 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR RESERVED ENVIRONMENTAL SERVICES, LLC PITTSBURGH PA
2011-1 PRODUCED FLUID 18.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-2 PRODUCED FLUID 532.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-2 PRODUCED FLUID 425.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2012-1 PRODUCED FLUID 811.44 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2012-2 PRODUCED FLUID 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2013-1 PRODUCED FLUID 531.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2013-2 PRODUCED FLUID 1.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2014-1 PRODUCED FLUID 532.92 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2014-2 PRODUCED FLUID 603.14 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
15-Jan PRODUCED FLUID 315.7 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1782058 2009-04-02 No Violations Noted Horizontal well not drilled. Currently, drilling the vertical well, E&S plan on-site, E&S ok.
1812029 2009-07-10 No Violations Noted E&S plan and site plan posted at front of access road. Met John Blebians at field trailer. Reviewed progress of drilling horizontal well. Running at 50 ft/hr. Patterson Rig 163. Current depth at 5,372 ft below grade at 11 % degree drilling vector. 11 3/4" pipe installed to 508 ft. with 150 sacks lead cement and followed by 150 sacks tail and 20 barrels circulated. 8 5/8" to 3490 ft with 710 sacks lead followed by 140 sacks tail with 90 barrels circulated. Inspected pit. No freeboard issues and pit is aligned with plastic. Small trench installed around drilling equipment to collect and releases. Slight droplets of oil located near storage bends. Collected in trench which was draining to pit.
1812917 2009-07-15 Violation(s) Noted A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning. The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road. This is a Horizontal Marcellus well. 567065 401CSL - Discharge of pollultional material to waters of Commonwealth.
1812917 2009-07-15 Violation(s) Noted A 20-30 gallon diesel spill was reported by Patterson UTI. A routine investigation was performed. The cleanup process was discussed with the safety officer, Sid Manning. The spill was contained and cleaned up using soap and pads. In addition a trench was utilized to contain the fluids within an area. There were no signs of residuals at the site. Well site has active drilling on location at the time of inspection. There were no signs of erosion and sedimentation on the well pad and access road. This is a Horizontal Marcellus well. 567065 401CSL - Discharge of pollultional material to waters of Commonwealth.
1821097 2009-08-13 No Violations Noted A CEI inspection was performed to evaluate the area in which a spill had occurred on 7/7/09. The incident was reported to the DEP. The spill was contained and cleaned up immediately using pads. There were no signs of residuals on the site at the time of the inspection. No signs of erosion and sedimentation at the well site. Pit maintaining freeboard. A large freshwater pit was being constructed at the time of the inspection.
1822540 2009-08-14 No Violations Noted E&S plan and site plan posted at front of access road. Met John Blebians at field trailer. Reviewed progress of drilling horizontal well. Patterson Rig 163 completed drilling to depth of 12,148 ft TD (8,336 ft lateral). Inspected pit. No freeboard issues and pit is aligned with plastic. Small trench installed around drilling equipment to collect and any releases. Samson in the process of completing frac pit located on the eastern portion of the site.
1837086 2009-10-08 No Violations Noted At the time of inspection, the well was drilled and prepared for hydro fracturing. The well was properly signed with E&S plan onsite. The access road was in good condition. No accelerated E&S issues were noted in relation to well site or access road. Pits sustained 2 ft of freeboard. It is recommended that pit freeboard continued to be monitored closely as areas of the pit were approaching the 2ft limitation.
1889551 2010-06-02 No Violations Noted At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009. Final restoration activities were underway during inspection. Pits were removed and backfilled, mulch and seed were being added at time of inspection. Well pad was rocked. I was informed by contractor, that farmer plans to utilize fields to perimeter around well pad, which will be seeded and mulched approximately 25-50ft from edge of rock pad. No accelerated E&S issues were noted in relation to well site or access road. Noted that two tanks were onsite and appeared sound. Dept requested that a container of methanol be removed from direct sunlight near pump station. A follow up inspection will be conducted to ensure final restoration activities have been completed and successful growth is achieved as well as removal of methanol barrel. Note: Operator noted that weather was a factor in timing of restoration activities.
1927162 2010-11-10 No Violations Noted At the time of inspection, well was drilled and in production. Site was properly signed with E&S plan onsite. Drilling was completed on August 20, 2009.

Site adequately and permanently restored with both rock and vegetation. All pits removed. All temporary bmps removed. No accelerated erosion or sedimentation issues noted in relation to site or access road. Brine tanks sound.

For data sources see[3]

References