X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30442"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30442
 
| Well ID: 37-005-30442
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.943486, -79.472385 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.943486, -79.472385 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Armstrong County, Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[Madison Township, Armstrong County, Pennsylvania|Madison Township]]
 
|-
 
|-
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 
| Operator Name: [[KRIEBEL MINERALS INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: HOPPER 005
 
|-
 
|-
 
| First Permit Date: 2009-08-21
 
| First Permit Date: 2009-08-21
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.943486
 
| Latitude: 40.943486
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 4125.0
+
| style="text-align:right;" | 7060.0
 +
| style="text-align:right;" | 306.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 7009.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 7009.0
+
| style="text-align:right;" | 4125.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 7060.0
+
| style="text-align:right;" | 3680.0
| style="text-align:right;" | 306.0
+
| style="text-align:right;" | 334.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 89:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 81: Line 106:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 25.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| PRODUCED FLUID
+
| DRILLING FLUID WASTE
| style="text-align:right;" | 75.0
+
| style="text-align:right;" | 410.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095443
+
| PA0091472
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
| CREEKSIDE
+
| SALTSBURG
 
| PA
 
| PA
 
|-
 
|-
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| DRILLING FLUID WASTE
+
| FRACING FLUID WASTE
| style="text-align:right;" | 410.0
+
| style="text-align:right;" | 550.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 116: Line 130:
 
|-
 
|-
 
| 2010-0
 
| 2010-0
| FRACING FLUID WASTE
+
| PRODUCED FLUID
| style="text-align:right;" | 550.0
+
| style="text-align:right;" | 75.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0095443
| TUNNELTON LIQUIDS COMPANY
+
| CREEKSIDE TREATMENT FACILITY
| SALTSBURG
+
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
Line 132: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
Line 143: Line 157:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
| PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY
+
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 +
| JOSEPHINE
 +
| PA
 +
|-
 +
|-
 +
| 2014-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 18.0
 +
| Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| JOSEPHINE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 155: Line 186:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1867295
 
| 1867295
Line 160: Line 193:
 
| No Violations Noted
 
| No Violations Noted
 
| drilling @ 1470ft/E&S ok/ID&pit ok
 
| drilling @ 1470ft/E&S ok/ID&pit ok
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 167: Line 202:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling was completed at the time of the inspection.  Below grade pit located onsite and the pit had more than the required two feet of lined freeboard.  Observed no accelerated erosion & sedimentation with respect to the access road.  Observed evidence that runoff had transported a limited amount of sediment off-site during the most recent rain and snow melt.  The operator had restablished the filter fabric fence after observing the compormised filter fabric fence.  The operator should closely monitor the site for sediment transport during future precipitation events and/or snow melt due to the proximity of the site to an unamed tributary to the Allecheny River.  Spoke with operator representative Mark Hopkins concerning the site and possible erosion issues.
 
| Drilling was completed at the time of the inspection.  Below grade pit located onsite and the pit had more than the required two feet of lined freeboard.  Observed no accelerated erosion & sedimentation with respect to the access road.  Observed evidence that runoff had transported a limited amount of sediment off-site during the most recent rain and snow melt.  The operator had restablished the filter fabric fence after observing the compormised filter fabric fence.  The operator should closely monitor the site for sediment transport during future precipitation events and/or snow melt due to the proximity of the site to an unamed tributary to the Allecheny River.  Spoke with operator representative Mark Hopkins concerning the site and possible erosion issues.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 174: Line 211:
 
| No Violations Noted
 
| No Violations Noted
 
| Well appeared to be equipped for & in production at the time of the inspection.  Brine tank located onsite and appeared to be in sound condition.  Site had been regraded, seeded & mulched and the vegetation had begun to grow.  Vegetation did not as of yet meet the 70% uniform coverage criteria.  No accelerated erosion & sedimentation was observed in relation to the site or access road.  The operator should continue to monitor the site to insure the erosion control BMP's continue to function properly until the vegetative cover achieves the 70% uniform coverage criteria.
 
| Well appeared to be equipped for & in production at the time of the inspection.  Brine tank located onsite and appeared to be in sound condition.  Site had been regraded, seeded & mulched and the vegetation had begun to grow.  Vegetation did not as of yet meet the 70% uniform coverage criteria.  No accelerated erosion & sedimentation was observed in relation to the site or access road.  The operator should continue to monitor the site to insure the erosion control BMP's continue to function properly until the vegetative cover achieves the 70% uniform coverage criteria.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 18:15, 26 June 2015

Well Details

Well ID: 37-005-30442
Loading map...
County: Armstrong
Municipality: Madison Township
Operator Name: KRIEBEL MINERALS INC
Well Pad ID:
Farm/Lease Name: HOPPER 005
First Permit Date: 2009-08-21
Last Permit Date: 2009-08-21
Spud Date: 2010-02-16
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.943486
Longitude: -79.472385

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 7060.0 306.0 0.0 0.0 0.0 0.0
2011-0 7009.0 334.0 0.0 0.0 0.0 0.0
2012-0 5232.0 335.0 0.0 0.0 0.0 0.0
2013-0 4125.0 334.0 0.0 0.0 0.0 0.0
2014-0 3680.0 334.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 410.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 550.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 PRODUCED FLUID 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2011-0 PRODUCED FLUID 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA
2012-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2014-0 PRODUCED FLUID 18.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1867295 2009-02-18 No Violations Noted drilling @ 1470ft/E&S ok/ID&pit ok
1865395 2010-02-24 No Violations Noted Drilling was completed at the time of the inspection. Below grade pit located onsite and the pit had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation with respect to the access road. Observed evidence that runoff had transported a limited amount of sediment off-site during the most recent rain and snow melt. The operator had restablished the filter fabric fence after observing the compormised filter fabric fence. The operator should closely monitor the site for sediment transport during future precipitation events and/or snow melt due to the proximity of the site to an unamed tributary to the Allecheny River. Spoke with operator representative Mark Hopkins concerning the site and possible erosion issues.
1884418 2010-05-14 No Violations Noted Well appeared to be equipped for & in production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. Site had been regraded, seeded & mulched and the vegetation had begun to grow. Vegetation did not as of yet meet the 70% uniform coverage criteria. No accelerated erosion & sedimentation was observed in relation to the site or access road. The operator should continue to monitor the site to insure the erosion control BMP's continue to function properly until the vegetative cover achieves the 70% uniform coverage criteria.

For data sources see[3]

References