X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28796"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28796
 
| Well ID: 37-129-28796
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.4747, -79.569144 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.4747, -79.569144 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Westmoreland County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[CNX GAS CO LLC|CNX GAS CO LLC]]
+
| Operator Name: [[CNX GAS CO LLC]]
 
|-
 
|-
| Well Pad ID: [[148819]]
+
| Well Pad ID: [[148819|148819]]
 +
|-
 +
| Farm/Lease Name: MAMONT SOUTH 1D
 
|-
 
|-
 
| First Permit Date: 2012-07-05
 
| First Permit Date: 2012-07-05
 
|-
 
|-
| Last Permit Date: 2012-07-05
+
| Last Permit Date: 2013-07-24
 
|-
 
|-
| Spud Date: None
+
| Spud Date: 2013-06-10
 
|-
 
|-
 
| Unconventional: Yes
 
| Unconventional: Yes
Line 23: Line 25:
 
| Horizontal: Yes
 
| Horizontal: Yes
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.4747
 
| Latitude: 40.4747
Line 30: Line 34:
 
|-
 
|-
 
|}
 
|}
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | GAS QUANTITY
 +
!scope="col" | GAS PRODUCTION DAYS
 +
!scope="col" | CONDENSATE QUANTITY
 +
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2013-2
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 264557.17
 +
| style="text-align:right;" | 46.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 521028.13
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 54088.71
 +
| style="text-align:right;" | 28.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-01
 +
| style="text-align:right;" | 63600.2
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 58149.96
 +
| style="text-align:right;" | 31.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | PERIOD
 +
!scope="col" | TYPE
 +
!scope="col" | QUANTITY
 +
!scope="col" | UNITS
 +
!scope="col" | DISPOSAL METHOD
 +
!scope="col" | WASTE FACILITY PERMIT ID
 +
!scope="col" | WASTE FACILITY NAME
 +
!scope="col" | FACILITY CITY
 +
!scope="col" | FACILITY STATE
 +
|-
 +
| 2013-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 1.0
 +
| Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| PAD004835146
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY
 +
| YUKON
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| DRILLING FLUID WASTE
 +
| style="text-align:right;" | 192.29
 +
| Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| PAD004835146
 +
| MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY
 +
| YUKON
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 45.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 0.27
 +
| Bbl
 +
| LANDFILL
 +
| 100434
 +
| EVERGREEN LANDFILL
 +
| BLAIRSVILLE
 +
| PA
 +
|-
 +
|-
 +
| 2014-1
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 38.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 5.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 31.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 37: Line 215:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 2132722
 
| 2132722
Line 42: Line 222:
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the Operator was in the process of cutting and removing trees and underbrush.  The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 
| At the time of inspection the Operator was in the process of cutting and removing trees and underbrush.  The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 49: Line 231:
 
| No Violations Noted
 
| No Violations Noted
 
| no violations noted
 
| no violations noted
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2152937
 +
| 2013-04-02
 +
| No Violations Noted
 +
| At the time of inspection the Operator was in the process of constructing the site.  At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2163808
 +
| 2013-05-06
 +
| No Violations Noted
 +
| At the time of inspection the Operator was in the process of constructing the site.  At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed.  No observation of accelerated E&S issue in relation to proposed well pad area or the access road.  The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2174955
 +
| 2013-06-13
 +
| In Compliance with Policy
 +
| Inspection the result of the Operator reporting a breached BMP during a precipitation event.  The Operator is in compliance with the Departments notification policy for a BMP breach.  During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013.  The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed.  The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area.  The precipitation event appears to exceed the Departments criteria for construction standards.  The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2175885
 +
| 2013-06-13
 +
| No Violations Noted
 +
| Conductor being cemented in at time of inspection.  Inspection conducted w/OGI J. Branan.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2177613
 +
| 2013-05-24
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment.  The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site.  The Department has also notes that the additions have been added to the E&S plan.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2182017
 +
| 2013-07-05
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment.  No observation of accelerated erosion or sedimentation in relation to the access road or well site.  The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2182378
 +
| 2013-07-09
 +
| No Violations Noted
 +
| Waiting on rig to commence tophole drilling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2185974
 +
| 2013-07-24
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2189898
 +
| 2013-08-01
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2189900
 +
| 2013-08-06
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2195025
 +
| 2013-08-07
 +
| No Violations Noted
 +
| Waiting on rig to commence tophole drilling.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2209076
 +
| 2013-10-02
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled to KOP.  The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2216394
 +
| 2013-10-25
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was on site and placed on containment. The Operator indicated that drilling had not started.  The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan.  However, the Department suggested to the Operator during the inspection that routine maintenance be performed to the silt sock on either side of the road, located directly behind the onsite camps and company trailers.  The Department observed some small areas where water was either traveling along the silt sock or under the silt sock.  No observation of accelerated erosion in those areas, however  preventative maintenance was suggested. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2217802
 +
| 2013-10-23
 +
| No Violations Noted
 +
| Finishing rigging up Nabors rig M62 to commence lateral drilling on 10-24-13.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2222908
 +
| 2013-11-14
 +
| No Violations Noted
 +
| Waiting on frac.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2226520
 +
| 2013-11-26
 +
| No Violations Noted
 +
| Waiting on frac.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2243101
 +
| 2014-02-06
 +
| No Violations Noted
 +
| At the time of inspection the Operator was actively preparing the site for stimulation.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2249728
 +
| 2014-02-18
 +
| No Violations Noted
 +
| At the time of inspection the Operator was actively stimulating the wells located onsite.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2249731
 +
| 2014-03-03
 +
| No Violations Noted
 +
| See inspection # 2249702 for events and description from the 3/3/2014 inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2253173
 +
| 2014-03-13
 +
| No Violations Noted
 +
| See inspection # 2253170 for events and description from the 3/13/2014 inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2360465
 +
| 2015-04-13
 +
| No Violations Noted
 +
| Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2361183
 +
| 2015-04-08
 +
| No Violations Noted
 +
| Well operating and properly identified. Well equipped with production unit (separation
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Oil and Gas Historical Inspection Report
!scope="col" | PERIOD
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
!scope="col" | GAS QUANTITY
+
| date = 2015-05-26
!scope="col" | GAS PRODUCTION DAYS
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
!scope="col" | CONDENSATE QUANTITY
+
| accessdate = 2015-05-27 }}</ref>
!scope="col" | CONDENSATE PRODUCTION DAYS
+
== References ==
!scope="col" | OIL QUANTITY
+
{{reflist}}
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
==References==
 
{{Reflist}}
 
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 19:49, 26 June 2015

Well Details

Well ID: 37-129-28796
Loading map...
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148819
Farm/Lease Name: MAMONT SOUTH 1D
First Permit Date: 2012-07-05
Last Permit Date: 2013-07-24
Spud Date: 2013-06-10
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.4747
Longitude: -79.569144

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 264557.17 46.0 0.0 0.0 0.0 0.0
2014-2 521028.13 184.0 0.0 0.0 0.0 0.0
2015-02 54088.71 28.0 0.0 0.0 0.0 0.0
2015-01 63600.2 31.0 0.0 0.0 0.0 0.0
2015-03 58149.96 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 DRILL CUTTINGS 1.0 Tons RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 DRILLING FLUID WASTE 192.29 Bbl RESIDUAL WASTE TRANSFER FACILITY PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2013-2 FRACING FLUID WASTE 45.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FRACING FLUID WASTE 0.27 Bbl LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2014-1 FRACING FLUID WASTE 38.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 31.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2132722 2013-01-22 No Violations Noted At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2139209 2013-02-13 No Violations Noted no violations noted
2152937 2013-04-02 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2163808 2013-05-06 No Violations Noted At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2174955 2013-06-13 In Compliance with Policy Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2175885 2013-06-13 No Violations Noted Conductor being cemented in at time of inspection. Inspection conducted w/OGI J. Branan.
2177613 2013-05-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182017 2013-07-05 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2182378 2013-07-09 No Violations Noted Waiting on rig to commence tophole drilling.
2185974 2013-07-24 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2189898 2013-08-01 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2189900 2013-08-06 No Violations Noted At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2195025 2013-08-07 No Violations Noted Waiting on rig to commence tophole drilling.
2209076 2013-10-02 No Violations Noted At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216394 2013-10-25 No Violations Noted At the time of inspection the drill rig was on site and placed on containment. The Operator indicated that drilling had not started. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. However, the Department suggested to the Operator during the inspection that routine maintenance be performed to the silt sock on either side of the road, located directly behind the onsite camps and company trailers. The Department observed some small areas where water was either traveling along the silt sock or under the silt sock. No observation of accelerated erosion in those areas, however preventative maintenance was suggested. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2217802 2013-10-23 No Violations Noted Finishing rigging up Nabors rig M62 to commence lateral drilling on 10-24-13.
2222908 2013-11-14 No Violations Noted Waiting on frac.
2226520 2013-11-26 No Violations Noted Waiting on frac.
2243101 2014-02-06 No Violations Noted At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249728 2014-02-18 No Violations Noted At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2249731 2014-03-03 No Violations Noted See inspection # 2249702 for events and description from the 3/3/2014 inspection.
2253173 2014-03-13 No Violations Noted See inspection # 2253170 for events and description from the 3/13/2014 inspection.
2360465 2015-04-13 No Violations Noted Inspection in response to a Well Site Restoration Report file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities
2361183 2015-04-08 No Violations Noted Well operating and properly identified. Well equipped with production unit (separation

For data sources see[3]

References