X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-075-25595"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-075-25595
 
| Well ID: 34-075-25595
 +
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.66705619, -82.18026655 | width=100% | height=100% }}
 
|-
 
|-
| County:
+
| County: [[Holmes County, Ohio|Holmes]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[NETHERS GARY L]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2014-08-07
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
| Violations:
+
| Violations: 0
 
|-
 
|-
| Latitude:
+
| Latitude: 40.66705619
 
|-
 
|-
| Longitude:
+
| Longitude: -82.18026655
 
|-
 
|-
 
|}
 
|}
Line 42: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 48.0
 +
|
 +
|
 +
| style="text-align:right;" | 191.0
 +
| style="text-align:right;" | 48.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 67:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| -1279481172
 +
| 2014-09-30
 +
|
 +
| Drilling ahead at 650' in the Brown Shale above the Berea.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1409173247
 +
| 2014-08-26
 +
|
 +
| The operator requested an inspection to witness surface casing cement.  The county inspector was busy on another rig and requested assistance.  The well circulated and cement returned to surface.  Todd Miller is writing the casing report.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1409309508
 +
| 2014-08-28
 +
|
 +
| The surface cement dropped 25' and is still inside the drive pipe.  They will top it off with sack cement.  The rig is idle until next week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1412593933
 +
| 2014-10-03
 +
|
 +
| Drilling ahead at 670' in the top of the Berea sand.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1417779185
 +
| 2014-12-02
 +
|
 +
| The rig is still over the hole.  The well has been  completed and is selling gas and bding pumped with the rig.  The pit is still open though with plenty of freeboard.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1484075397
 
| -1484075397
 
| 2014-08-13
 
| 2014-08-13
|
+
|  
 
| Drilling ahead at 200'.  Only making 2' per run as the shale is slabbing up on the bit and trying to stick .
 
| Drilling ahead at 200'.  Only making 2' per run as the shale is slabbing up on the bit and trying to stick .
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1653942883
 +
| 2014-08-18
 +
|
 +
| Drilling ahead at 310'.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1938108005
 +
| 2014-09-17
 +
|
 +
| Drilling ahead at 400' in the gray shale.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -2005095774
 
| -2005095774
 
| 2014-08-08
 
| 2014-08-08
|
+
|  
| Drove 38' of 10-3/4" drive pipe.  Driving pipe.
+
| Drove 38' of 10-3/4 drive pipe.  Driving pipe.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -818115894
+
| 3715369
| 2014-08-26
+
| 2014-09-29
|
+
|  
| Cemenco cemented the 350' of 7" 24# casing with 110 sacks of Class A cement.  See the casing ticket for the details.
+
| Drilling ahead at 620'
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1409173247
+
| -817920007
| 2014-08-26
+
| 2014-10-09
|
+
|  
| The operator requested an inspection to witness surface casing cement. The county inspector was busy on another rig and requested assistance.  The well circulated and cement returned to surface.  Todd Miller is writing the casing report.
+
| Drilling ahead at 775' in the 2nd Berea sand.   They should reach total depth this date.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1409309508
+
| -818115894
| 2014-08-28
+
| 2014-08-26
|
+
|  
| The surface cement dropped 25' and is still inside the drive pipe.  They will top it off with sack cement. The rig is idle until next week.
+
| Cemenco cemented the 350' of 7 24# casing with 110 sacks of Class A cement.   See the casing ticket for the details.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1653942883
+
| 882463120
| 2014-08-18
+
| 2014-09-23
|
+
|  
| Drilling ahead at 310'.
+
| Drilling ahead at 570' in the brown shale above the Berea.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 902082
 
| 902082
 
| 2014-08-12
 
| 2014-08-12
|
+
|  
 
| Seated drive pipe at 45'. Hit fresh water at 100'.  Drilling ahead at 150'.
 
| Seated drive pipe at 45'. Hit fresh water at 100'.  Drilling ahead at 150'.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -945290730
 +
| 2014-10-08
 +
|
 +
| Drilling ahead in the Black Grit at 710'.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 11:53, 14 July 2015

Well Details

Well ID: 34-075-25595
Loading map...
County: Holmes
Municipality:
Operator Name: NETHERS GARY L
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-08-07
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.66705619
Longitude: -82.18026655

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-0 0.0 48.0 191.0 48.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1279481172 2014-09-30 Drilling ahead at 650' in the Brown Shale above the Berea.
1409173247 2014-08-26 The operator requested an inspection to witness surface casing cement. The county inspector was busy on another rig and requested assistance. The well circulated and cement returned to surface. Todd Miller is writing the casing report.
1409309508 2014-08-28 The surface cement dropped 25' and is still inside the drive pipe. They will top it off with sack cement. The rig is idle until next week.
1412593933 2014-10-03 Drilling ahead at 670' in the top of the Berea sand.
1417779185 2014-12-02 The rig is still over the hole. The well has been completed and is selling gas and bding pumped with the rig. The pit is still open though with plenty of freeboard.
-1484075397 2014-08-13 Drilling ahead at 200'. Only making 2' per run as the shale is slabbing up on the bit and trying to stick .
1653942883 2014-08-18 Drilling ahead at 310'.
-1938108005 2014-09-17 Drilling ahead at 400' in the gray shale.
-2005095774 2014-08-08 Drove 38' of 10-3/4 drive pipe. Driving pipe.
3715369 2014-09-29 Drilling ahead at 620'
-817920007 2014-10-09 Drilling ahead at 775' in the 2nd Berea sand. They should reach total depth this date.
-818115894 2014-08-26 Cemenco cemented the 350' of 7 24# casing with 110 sacks of Class A cement. See the casing ticket for the details.
882463120 2014-09-23 Drilling ahead at 570' in the brown shale above the Berea.
902082 2014-08-12 Seated drive pipe at 45'. Hit fresh water at 100'. Drilling ahead at 150'.
-945290730 2014-10-08 Drilling ahead in the Black Grit at 710'.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.