X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-121-24502"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-121-24502
 
| Well ID: 34-121-24502
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9079020792, -81.3247572499 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.90790208, -81.32475725 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Noble County, Ohio|Noble]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-06-30
 
| Spud Date: 2014-06-30
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.9079020792
+
| Latitude: 39.90790208
 
|-
 
|-
| Longitude: -81.3247572499
+
| Longitude: -81.32475725
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -286662420
 
| 2014-07-16
 
|
 
| I am onsite to witness the surface casing cementing operations.  Falcon rig 27 drilled 389' of 24" hole.  The rig ran 378' of 18.625" J-55 casing with five centralizers.  Allied cemented the casing in place with class A cement.  I witnessed 55 barrels of cement returns to surface.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1571634226
 
| 1571634226
 
| 2014-07-01
 
| 2014-07-01
|
+
|  
 
| On the date of inspection I accompanied ODNR Inspector Eric Conrad to witness the cementing of a conductor casing string. Refer to Eric Conrad's report for further details.
 
| On the date of inspection I accompanied ODNR Inspector Eric Conrad to witness the cementing of a conductor casing string. Refer to Eric Conrad's report for further details.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -286662420
 +
| 2014-07-16
 +
|
 +
| I am onsite to witness the surface casing cementing operations.  Falcon rig 27 drilled 389' of 24 hole.  The rig ran 378' of 18.625 J-55 casing with five centralizers.  Allied cemented the casing in place with class A cement.  I witnessed 55 barrels of cement returns to surface.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 821728374
 
| 821728374
 
| 2014-07-01
 
| 2014-07-01
|
+
|  
| I am onsite to witness the conductor string cementing.  Express Energy Services ran 100' of 26" casing inside of 32" hole.  The casing was cemented in place with 330 sacks of class A cement.  I witnessed 18 barrels of cement return to surface.
+
| I am onsite to witness the conductor string cementing.  Express Energy Services ran 100' of 26 casing inside of 32 hole.  The casing was cemented in place with 330 sacks of class A cement.  I witnessed 18 barrels of cement return to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:21, 14 July 2015

Well Details

Well ID: 34-121-24502
Loading map...
County: Noble
Municipality:
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-06-30
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 39.90790208
Longitude: -81.32475725

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1571634226 2014-07-01 On the date of inspection I accompanied ODNR Inspector Eric Conrad to witness the cementing of a conductor casing string. Refer to Eric Conrad's report for further details.
-286662420 2014-07-16 I am onsite to witness the surface casing cementing operations. Falcon rig 27 drilled 389' of 24 hole. The rig ran 378' of 18.625 J-55 casing with five centralizers. Allied cemented the casing in place with class A cement. I witnessed 55 barrels of cement returns to surface.
821728374 2014-07-01 I am onsite to witness the conductor string cementing. Express Energy Services ran 100' of 26 casing inside of 32 hole. The casing was cemented in place with 330 sacks of class A cement. I witnessed 18 barrels of cement return to surface.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.