X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-035-22060"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-035-22060
 
| Well ID: 34-035-22060
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.4332185388, -81.4018241812 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.43321854, -81.40182418 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Cuyahoga County, Ohio|Cuyahoga]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2008-09-27
 
| Spud Date: 2008-09-27
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.4332185388
+
| Latitude: 41.43321854
 
|-
 
|-
| Longitude: -81.4018241812
+
| Longitude: -81.40182418
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 18486.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 283.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 19243.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 87.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 14375.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 170.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 12386.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 80.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 8301.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 85.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 103:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1001420862
 
| -1001420862
 
| 2008-09-27
 
| 2008-09-27
|
+
|  
| arrived on site for 11 3/4" conductor cement job.
+
| arrived on site for 11 3/4 conductor cement job.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -152273984
 
| 2008-10-01
 
|
 
| Drilling approx 3600' No violation found , fences up (pit,silt), no off site run off.
 
|
 
|
 
|
 
|-
 
|-
 
| -1670174437
 
| 2008-09-28
 
|
 
| 85/8" casing was cemented on Sunday night
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1225718900
 
| 1225718900
 
| 2008-09-24
 
| 2008-09-24
|
+
|  
|   Doug Gonzalus Called to say location is made and He also made calls made to city.
+
| Doug Gonzalus Called to say location is made and He also made calls made to city.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1231168733
 
| 1231168733
 
| 2008-11-03
 
| 2008-11-03
|
+
|  
 
| area levaled tanks on site not set
 
| area levaled tanks on site not set
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1373300319
 
| 1373300319
 
| 2013-07-08
 
| 2013-07-08
|
+
|  
 
| The producing unit consists of a an above-ground storage tank (AST) battery with 1 140-barrel steel production tank, and 1 50-barrel poly brine tank, a mechanical separator, and metering run. Identification is present. There is an earthen secondary containment which is in good condition. The load-outs are bull-plugged and locked.  Safety equipment is present. The wellhead is located 50 feet southwest of the battery. The wellhead consists of a mechanical plunger lift system and associated valve-tree. The annulus is plumbed into the production line. The wellhead and battery are in separate board-on-board enclosures which are locked. The lease road is paved with mixed, coarse limestone aggregate.  I did not observe any problems or violations. Preliminary restoration passes.
 
| The producing unit consists of a an above-ground storage tank (AST) battery with 1 140-barrel steel production tank, and 1 50-barrel poly brine tank, a mechanical separator, and metering run. Identification is present. There is an earthen secondary containment which is in good condition. The load-outs are bull-plugged and locked.  Safety equipment is present. The wellhead is located 50 feet southwest of the battery. The wellhead consists of a mechanical plunger lift system and associated valve-tree. The annulus is plumbed into the production line. The wellhead and battery are in separate board-on-board enclosures which are locked. The lease road is paved with mixed, coarse limestone aggregate.  I did not observe any problems or violations. Preliminary restoration passes.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1425048385
 +
| 2015-02-27
 +
|
 +
| I inspected this well as part of routine inspection activity. The wellhead and battery are located in a small clearing in a mostly wooded area. The wellhead plunger lift and battery are in separate board-on-board enclosures which are locked. Fittings and connections are secure and free from signs of leakage or problems. The load-outs are secure, plugged, and locked. Process safety gear is present. Signage is in place and current. At the time of this inspection there are 15 to 20 inches of snow cover in the area which obscures some surficial elements from observation.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -152273984
 +
| 2008-10-01
 +
|
 +
| Drilling approx 3600' No violation found , fences up (pit,silt), no off site run off.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1670174437
 +
| 2008-09-28
 +
|
 +
| 85/8 casing was cemented on Sunday night
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2100873198
 
| 2100873198
 
| 2008-10-09
 
| 2008-10-09
|
+
|  
 
| Doug Gonzoilus. called to infome me pits are to be soildified.
 
| Doug Gonzoilus. called to infome me pits are to be soildified.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 247480513
 
| 247480513
 
| 2008-10-02
 
| 2008-10-02
|
+
|  
| company (Doug Gonzilus) called to say the rig has TD and 4.5" casing to be run and cemented tonight
+
| company (Doug Gonzilus) called to say the rig has TD and 4.5 casing to be run and cemented tonight
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 661821541
 
| 661821541
 
| 2008-09-26
 
| 2008-09-26
|
+
|  
 
| Rig move to location on Saturday morning.
 
| Rig move to location on Saturday morning.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 15:22, 14 July 2015

Well Details

Well ID: 34-035-22060
Loading map...
County: Cuyahoga
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-09-27
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.43321854
Longitude: -81.40182418

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 18486.0 283.0
2010-0 19243.0 87.0
2011-0 14375.0 170.0
2012-0 12386.0 80.0
2014-0 8301.0 365.0 85.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1001420862 2008-09-27 arrived on site for 11 3/4 conductor cement job.
1225718900 2008-09-24 Doug Gonzalus Called to say location is made and He also made calls made to city.
1231168733 2008-11-03 area levaled tanks on site not set
1373300319 2013-07-08 The producing unit consists of a an above-ground storage tank (AST) battery with 1 140-barrel steel production tank, and 1 50-barrel poly brine tank, a mechanical separator, and metering run. Identification is present. There is an earthen secondary containment which is in good condition. The load-outs are bull-plugged and locked. Safety equipment is present. The wellhead is located 50 feet southwest of the battery. The wellhead consists of a mechanical plunger lift system and associated valve-tree. The annulus is plumbed into the production line. The wellhead and battery are in separate board-on-board enclosures which are locked. The lease road is paved with mixed, coarse limestone aggregate. I did not observe any problems or violations. Preliminary restoration passes.
1425048385 2015-02-27 I inspected this well as part of routine inspection activity. The wellhead and battery are located in a small clearing in a mostly wooded area. The wellhead plunger lift and battery are in separate board-on-board enclosures which are locked. Fittings and connections are secure and free from signs of leakage or problems. The load-outs are secure, plugged, and locked. Process safety gear is present. Signage is in place and current. At the time of this inspection there are 15 to 20 inches of snow cover in the area which obscures some surficial elements from observation.
-152273984 2008-10-01 Drilling approx 3600' No violation found , fences up (pit,silt), no off site run off.
-1670174437 2008-09-28 85/8 casing was cemented on Sunday night
2100873198 2008-10-09 Doug Gonzoilus. called to infome me pits are to be soildified.
247480513 2008-10-02 company (Doug Gonzilus) called to say the rig has TD and 4.5 casing to be run and cemented tonight
661821541 2008-09-26 Rig move to location on Saturday morning.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.