| Well ID: 34-121-24453 | | Well ID: 34-121-24453 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.81956105, -81.39533951 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Noble County, Ohio|Noble]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CNX GAS COMPANY LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-09-14 | | Spud Date: 2013-09-14 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.81956105 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.39533951 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 417863.0 | ||
+ | | style="text-align:right;" | 52.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 27101.0 | ||
+ | | style="text-align:right;" | 52.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 222846.0 | ||
+ | | style="text-align:right;" | 49.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 6731.0 | ||
+ | | style="text-align:right;" | 49.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 336706.0 | ||
+ | | style="text-align:right;" | 74.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 14461.0 | ||
+ | | style="text-align:right;" | 74.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 85: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1295117420 | ||
+ | | 2014-02-26 | ||
+ | | | ||
+ | | My inspection finds the drilling rig, Savanna 640e, ran 1991' of 13.375 casing. Calfrac cemented the casing in place with 1637 sks of class A cement. 38 bbl of cement returned to surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -132917832 | | -132917832 | ||
| 2014-03-10 | | 2014-03-10 | ||
− | | | + | | |
− | | I am onsite to witness a portion of the cementing operations. Savannah rig 640 ran 7409' of 9.625 | + | | I am onsite to witness a portion of the cementing operations. Savannah rig 640 ran 7409' of 9.625 casing. Calfrac circulated 663 sks of Dynapro Lite and 308 sks of Class A cement into place. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1380307631 | ||
+ | | 2013-09-27 | ||
+ | | | ||
+ | | My inspection today finds the Falcon 14 rig has drilled 350' of 26 hole, and ran 335' of 20 casing. Calfrac is onsite to cement the casing in place. I witnessed 20 bbl of cement returns to surface. The cement head is leaking so the company will perform a CIT test at a later date. The rig will move to the 30EHSU. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -1666872657 | | -1666872657 | ||
| 2014-03-03 | | 2014-03-03 | ||
− | | | + | | |
| I called Ryan Coffman, the rig manager for CNX. He stated that the rig crew is preparing to begin drilling . | | I called Ryan Coffman, the rig manager for CNX. He stated that the rig crew is preparing to begin drilling . | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 2094094887 | ||
+ | | 2013-10-22 | ||
+ | | | ||
+ | | Savanna rig 640 ran 1993' of 13.375 casing. Calfrac cemented the casing in place with class A cement. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -288484058 | ||
+ | | 2015-02-20 | ||
+ | | | ||
+ | | My inspection today finds the site of the condensate release has been cleaned. No traces of the release are visible. Six 400 barrel oil tanks are set in a liquid tight containment and an additional seven 210 barrel brine water tanks are set in a separate containment. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -499490772 | | -499490772 | ||
| 2013-09-25 | | 2013-09-25 | ||
− | | | + | | |
| My inspection today finds Falcon Drilling rig 14 is drilling at a depth of 45'. All signage and safety equipment is in place. The edges of location are being seeded. | | My inspection today finds Falcon Drilling rig 14 is drilling at a depth of 45'. All signage and safety equipment is in place. The edges of location are being seeded. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 636604358 | ||
+ | | 2014-04-23 | ||
+ | | | ||
+ | | My inspection today finds the well was drilled to a depth of 14,629'. The drilling rig ran 14,457' of 5.5 twenty pound P-110 casing. Calfrac cemented the casing in place with class H cement. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -829435454 | | -829435454 | ||
| 2013-09-16 | | 2013-09-16 | ||
− | | | + | | |
| I am onsite to inspect the conductors that were set over the weekend and get GPS data. | | I am onsite to inspect the conductors that were set over the weekend and get GPS data. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 980960323 | | 980960323 | ||
| 2014-05-07 | | 2014-05-07 | ||
− | | | + | | |
| My inspection today finds the preliminary restoration requirements have been met. | | My inspection today finds the preliminary restoration requirements have been met. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 994756211 | ||
+ | | 2015-02-19 | ||
+ | | | ||
+ | | At 8:54 PM I received a telephone call from Greg Evans. Mr. Evans works for Consol Energy and wanted to report a small 10-15 gallon condensate release off of containment. The release was a result of a Sunpro water truck transferring fluids on the pad. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-121-24453 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81956105,"lon":-81.39533951,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-09-14 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.81956105 | |
Longitude: -81.39533951 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 417863.0 | 52.0 | 27101.0 | 52.0 | ||
2014-4 | 222846.0 | 49.0 | 6731.0 | 49.0 | ||
2015-1 | 336706.0 | 74.0 | 14461.0 | 74.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1295117420 | 2014-02-26 | My inspection finds the drilling rig, Savanna 640e, ran 1991' of 13.375 casing. Calfrac cemented the casing in place with 1637 sks of class A cement. 38 bbl of cement returned to surface. | ||||
-132917832 | 2014-03-10 | I am onsite to witness a portion of the cementing operations. Savannah rig 640 ran 7409' of 9.625 casing. Calfrac circulated 663 sks of Dynapro Lite and 308 sks of Class A cement into place. | ||||
1380307631 | 2013-09-27 | My inspection today finds the Falcon 14 rig has drilled 350' of 26 hole, and ran 335' of 20 casing. Calfrac is onsite to cement the casing in place. I witnessed 20 bbl of cement returns to surface. The cement head is leaking so the company will perform a CIT test at a later date. The rig will move to the 30EHSU. | ||||
-1666872657 | 2014-03-03 | I called Ryan Coffman, the rig manager for CNX. He stated that the rig crew is preparing to begin drilling . | ||||
2094094887 | 2013-10-22 | Savanna rig 640 ran 1993' of 13.375 casing. Calfrac cemented the casing in place with class A cement. | ||||
-288484058 | 2015-02-20 | My inspection today finds the site of the condensate release has been cleaned. No traces of the release are visible. Six 400 barrel oil tanks are set in a liquid tight containment and an additional seven 210 barrel brine water tanks are set in a separate containment. | ||||
-499490772 | 2013-09-25 | My inspection today finds Falcon Drilling rig 14 is drilling at a depth of 45'. All signage and safety equipment is in place. The edges of location are being seeded. | ||||
636604358 | 2014-04-23 | My inspection today finds the well was drilled to a depth of 14,629'. The drilling rig ran 14,457' of 5.5 twenty pound P-110 casing. Calfrac cemented the casing in place with class H cement. | ||||
-829435454 | 2013-09-16 | I am onsite to inspect the conductors that were set over the weekend and get GPS data. | ||||
980960323 | 2014-05-07 | My inspection today finds the preliminary restoration requirements have been met. | ||||
994756211 | 2015-02-19 | At 8:54 PM I received a telephone call from Greg Evans. Mr. Evans works for Consol Energy and wanted to report a small 10-15 gallon condensate release off of containment. The release was a result of a Sunpro water truck transferring fluids on the pad. |
For data sources see[2]