If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-121-24418 | | Well ID: 34-121-24418 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.83777514, -81.39305596 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Noble County, Ohio|Noble]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CNX GAS COMPANY LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-05-18 | | Spud Date: 2013-05-18 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.83777514 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.39305596 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 9451.0 | ||
+ | | style="text-align:right;" | 4.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 1375.0 | ||
+ | | style="text-align:right;" | 4.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 97612.0 | ||
+ | | style="text-align:right;" | 30.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 6240.0 | ||
+ | | style="text-align:right;" | 30.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 196932.0 | ||
+ | | style="text-align:right;" | 60.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 7569.0 | ||
+ | | style="text-align:right;" | 60.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 85: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1102375915 | | 1102375915 | ||
| 2013-07-01 | | 2013-07-01 | ||
− | | | + | | |
− | | My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5 | + | | My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5 section of the well. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1239415253 | | 1239415253 | ||
| 2013-07-08 | | 2013-07-08 | ||
− | | | + | | |
− | | The drilling rig is currently hooking up equipment to pressure test the 13.375 | + | | The drilling rig is currently hooking up equipment to pressure test the 13.375 casing string. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1272997038 | ||
+ | | 2013-07-22 | ||
+ | | | ||
+ | | My inspection today finds the rig crew is running 7150' of 9.625 casing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1370167318 | | 1370167318 | ||
| 2013-06-01 | | 2013-06-01 | ||
− | | | + | | |
− | | My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20 | + | | My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20 casing. Calfrac cemented the casing in place with class A cement. 20 bbl of cement returns to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1374776608 | | 1374776608 | ||
| 2013-07-17 | | 2013-07-17 | ||
− | | | + | | |
| My inspection today finds the drilling rig has shut down due to the top drive being broken. Current depth is 5088'. | | My inspection today finds the drilling rig has shut down due to the top drive being broken. Current depth is 5088'. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1375297606 | | 1375297606 | ||
| 2013-07-25 | | 2013-07-25 | ||
− | | | + | | |
| I received a call from CNX stating that they had a diesel spill on location. Upon my arrival the spill was 95% cleaned. The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment. All material off of containment that was impacted was hauled off to a disposal facility. | | I received a call from CNX stating that they had a diesel spill on location. Upon my arrival the spill was 95% cleaned. The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment. All material off of containment that was impacted was hauled off to a disposal facility. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1417801255 | | 1417801255 | ||
| 2013-07-23 | | 2013-07-23 | ||
− | | | + | | |
− | | I am onsite to witness the second stage cementing of the 9.625 | + | | I am onsite to witness the second stage cementing of the 9.625 casing The stage tool is set at 4262'. Calfrac circulated 882 sks of 13.8# cement into place. I witnessed 30 bbl of cement returns to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1596835850 | ||
+ | | 2014-11-06 | ||
+ | | | ||
+ | | My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1665470305 | ||
+ | | 2013-07-12 | ||
+ | | | ||
+ | | My inspection today finds the operator is drilling the 12.25 section of the well at a depth of 2433' | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 277319173 | | 277319173 | ||
| 2013-06-08 | | 2013-06-08 | ||
− | | | + | | |
| Redstone drilling ran casing to a depth of 313'. Calfrac circulated 629 sks of class a cement. There were no cement returns to surface. Weatherford will bond log the well to find cement top. | | Redstone drilling ran casing to a depth of 313'. Calfrac circulated 629 sks of class a cement. There were no cement returns to surface. Weatherford will bond log the well to find cement top. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -417719886 | ||
+ | | 2013-05-30 | ||
+ | | | ||
+ | | My inspection today finds Enviro-spud has drilled to a depth of 249'. The rig is currently broke down. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -912656021 | ||
+ | | 2013-07-23 | ||
+ | | | ||
+ | | I am onsite to witness the cementing of the first stage of the 9.625 casing. Calfrac circulated 978 sks of 15.5# cement into place. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -997704215 | ||
+ | | 2014-11-06 | ||
+ | | | ||
+ | | My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-121-24418 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83777514,"lon":-81.39305596,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: CNX GAS COMPANY LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-05-18 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.83777514 | |
Longitude: -81.39305596 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 9451.0 | 4.0 | 1375.0 | 4.0 | ||
2014-4 | 97612.0 | 30.0 | 6240.0 | 30.0 | ||
2015-1 | 196932.0 | 60.0 | 7569.0 | 60.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1102375915 | 2013-07-01 | My inspection today finds the drilling rig (Savanna 640) is making up their bottom hole assembly and preparing to drill the 17.5 section of the well. | ||||
1239415253 | 2013-07-08 | The drilling rig is currently hooking up equipment to pressure test the 13.375 casing string. | ||||
-1272997038 | 2013-07-22 | My inspection today finds the rig crew is running 7150' of 9.625 casing. | ||||
1370167318 | 2013-06-01 | My inspection today finds the drilling contractor Eviro-spud is ran 309' of 20 casing. Calfrac cemented the casing in place with class A cement. 20 bbl of cement returns to surface. | ||||
1374776608 | 2013-07-17 | My inspection today finds the drilling rig has shut down due to the top drive being broken. Current depth is 5088'. | ||||
1375297606 | 2013-07-25 | I received a call from CNX stating that they had a diesel spill on location. Upon my arrival the spill was 95% cleaned. The estimated total of the spill was 56 gallons with 50 gallons being held on the primary containment. All material off of containment that was impacted was hauled off to a disposal facility. | ||||
1417801255 | 2013-07-23 | I am onsite to witness the second stage cementing of the 9.625 casing The stage tool is set at 4262'. Calfrac circulated 882 sks of 13.8# cement into place. I witnessed 30 bbl of cement returns to surface. | ||||
-1596835850 | 2014-11-06 | My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site. | ||||
-1665470305 | 2013-07-12 | My inspection today finds the operator is drilling the 12.25 section of the well at a depth of 2433' | ||||
277319173 | 2013-06-08 | Redstone drilling ran casing to a depth of 313'. Calfrac circulated 629 sks of class a cement. There were no cement returns to surface. Weatherford will bond log the well to find cement top. | ||||
-417719886 | 2013-05-30 | My inspection today finds Enviro-spud has drilled to a depth of 249'. The rig is currently broke down. | ||||
-912656021 | 2013-07-23 | I am onsite to witness the cementing of the first stage of the 9.625 casing. Calfrac circulated 978 sks of 15.5# cement into place. | ||||
-997704215 | 2014-11-06 | My inspection today finds the site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set in a metal dike with a plastic liner. Four 500 barrel temporary tanks are set on site in a plastic liner. A liquids pump system is set up at the back of the production site along with a large compressor. Vegetation has been established around the site. |
For data sources see[2]