X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21164"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21164
 
| Well ID: 34-067-21164
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.1785579051, -81.0733872897 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.17855791, -81.07338729 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-10-22
 
| Spud Date: 2013-10-22
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.1785579051
+
| Latitude: 40.17855791
 
|-
 
|-
| Longitude: -81.0733872897
+
| Longitude: -81.07338729
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 566229.0
 +
| style="text-align:right;" | 84.0
 +
|
 +
|
 +
| style="text-align:right;" | 6561.0
 +
| style="text-align:right;" | 84.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 491541.0
 +
| style="text-align:right;" | 81.0
 +
|
 +
|
 +
| style="text-align:right;" | 2275.0
 +
| style="text-align:right;" | 81.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -2052754634
 
| 2014-01-29
 
|
 
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 had made one trip in reaming hole and well has been logged. Making up directional tools to trip back in to do further reaming and will follow up with 5.5 inch production casing and cementing. Site inspection revealed no violations.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1382575687
 
| 1382575687
 
| 2013-10-23
 
| 2013-10-23
|
+
|  
 
+
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 had replaced their top drive and spudded the well on 10/22/13 @ 12:30pm and drilled a 24
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382852528
 
| 1382852528
 
| 2013-10-27
 
| 2013-10-27
|
+
|  
 
+
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 drilled a 17.5
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1390320138
 
| 1390320138
 
| 2014-01-21
 
| 2014-01-21
|
+
|  
 
| On the day of my inspection I was requested on site due to a tote of drilling soap being spilled outside containment with loss of 2.5bbls. Initial clean-up was with a super sucker upon arrival on site and inspection I requested that further clean-up be done. Talking with Company Man James Pritchard it was agreed to utilize a backhoe on site to remove approximately 6 inches of stone and backfill with clean stone. Nomac Drilling Rig 310 had drilled an 8.5 inch lateral hole to the total depth of 16322 feet. They are currently tripping back in the hole to ream out the lateral with logging to follow. Upon completion of logging they will trip back for further reaming, run 5.5 inch production casing with fiber optics cable and cementing to follow.
 
| On the day of my inspection I was requested on site due to a tote of drilling soap being spilled outside containment with loss of 2.5bbls. Initial clean-up was with a super sucker upon arrival on site and inspection I requested that further clean-up be done. Talking with Company Man James Pritchard it was agreed to utilize a backhoe on site to remove approximately 6 inches of stone and backfill with clean stone. Nomac Drilling Rig 310 had drilled an 8.5 inch lateral hole to the total depth of 16322 feet. They are currently tripping back in the hole to ream out the lateral with logging to follow. Upon completion of logging they will trip back for further reaming, run 5.5 inch production casing with fiber optics cable and cementing to follow.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2052754634
 +
| 2014-01-29
 +
|
 +
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 had made one trip in reaming hole and well has been logged. Making up directional tools to trip back in to do further reaming and will follow up with 5.5 inch production casing and cementing. Site inspection revealed no violations.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2057604607
 
| 2057604607
 
| 2013-10-22
 
| 2013-10-22
|
+
|  
 
+
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 had replaced their top drive and was picking up tools to spud well with a 24
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 70959147
 
| 70959147
 
| 2013-11-01
 
| 2013-11-01
|
+
|  
 
+
| On the day of my inspection I witnessed that Nomac Drilling Rig #310 had drilled a 12.25
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:26, 14 July 2015

Well Details

Well ID: 34-067-21164
Loading map...
County: Harrison
Municipality:
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-10-22
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.17855791
Longitude: -81.07338729

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 566229.0 84.0 6561.0 84.0
2015-1 491541.0 81.0 2275.0 81.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1382575687 2013-10-23 On the day of my inspection I witnessed that Nomac Drilling Rig #310 had replaced their top drive and spudded the well on 10/22/13 @ 12:30pm and drilled a 24
1382852528 2013-10-27 On the day of my inspection I witnessed that Nomac Drilling Rig #310 drilled a 17.5
1390320138 2014-01-21 On the day of my inspection I was requested on site due to a tote of drilling soap being spilled outside containment with loss of 2.5bbls. Initial clean-up was with a super sucker upon arrival on site and inspection I requested that further clean-up be done. Talking with Company Man James Pritchard it was agreed to utilize a backhoe on site to remove approximately 6 inches of stone and backfill with clean stone. Nomac Drilling Rig 310 had drilled an 8.5 inch lateral hole to the total depth of 16322 feet. They are currently tripping back in the hole to ream out the lateral with logging to follow. Upon completion of logging they will trip back for further reaming, run 5.5 inch production casing with fiber optics cable and cementing to follow.
-2052754634 2014-01-29 On the day of my inspection I witnessed that Nomac Drilling Rig #310 had made one trip in reaming hole and well has been logged. Making up directional tools to trip back in to do further reaming and will follow up with 5.5 inch production casing and cementing. Site inspection revealed no violations.
2057604607 2013-10-22 On the day of my inspection I witnessed that Nomac Drilling Rig #310 had replaced their top drive and was picking up tools to spud well with a 24
70959147 2013-11-01 On the day of my inspection I witnessed that Nomac Drilling Rig #310 had drilled a 12.25

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.