X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23071"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23071
 
| Well ID: 34-153-23071
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.276147837, -81.668099314 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.27612565, -81.66822243 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GONZOIL INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-07-27
 
| Spud Date: 2009-07-27
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Plugged and Abandoned
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.276147837
+
| Latitude: 41.27612565
 
|-
 
|-
| Longitude: -81.668099314
+
| Longitude: -81.66822243
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 4580.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 102.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 9421.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 32.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 4885.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 65.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1022198460
 
| -1022198460
 
| 2009-07-27
 
| 2009-07-27
|
+
|  
 
| Wildcat Drilling is moving in and will spud the well tonight. The shale pit has been dug and lined. The blow pit will be dug later today.
 
| Wildcat Drilling is moving in and will spud the well tonight. The shale pit has been dug and lined. The blow pit will be dug later today.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1043170641
 +
| 2009-08-06
 +
|
 +
| Daily Excavating and ChemTech were on site to solidify the drilling pits.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1185645786
 +
| 2009-09-03
 +
|
 +
| The well has been fraced and the tank battery has been assembled. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1252745616
 
| -1252745616
 
| 2009-07-15
 
| 2009-07-15
|
+
|  
 
| The drilling location has been built and waiting for the drilling rig. The ID and permit are posted.
 
| The drilling location has been built and waiting for the drilling rig. The ID and permit are posted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1520334237
 
| -1520334237
 
| 2009-07-31
 
| 2009-07-31
|
+
|  
| Wildcat reached TD and ran 4-1/2" casing. The rig will be moving on 8/5. The pits are lined, fenced and in good condition.
+
| Wildcat reached TD and ran 4-1/2 casing. The rig will be moving on 8/5. The pits are lined, fenced and in good condition.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1583329224
 
| -1583329224
 
| 2010-04-20
 
| 2010-04-20
|
+
|  
 
| Preliminary restoration is approved.
 
| Preliminary restoration is approved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1717076842
 
| -1717076842
 
| 2010-01-13
 
| 2010-01-13
|
+
|  
 
| Status check inspection found no violations at this time. Preliminary restoration should be approved this spring.
 
| Status check inspection found no violations at this time. Preliminary restoration should be approved this spring.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -40322359
 
| -40322359
 
| 2009-08-04
 
| 2009-08-04
|
+
|  
 
| Wildcat is rigging down and will finish moving on 8/5. The pits are fenced, lined and in good condition.
 
| Wildcat is rigging down and will finish moving on 8/5. The pits are fenced, lined and in good condition.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 549708033
 +
| 2009-07-29
 +
|
 +
| Status check inspection found the pits in good condition. Wildcat is drilling ahead and should TD the well on 7/31.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -562263550
 
| -562263550
 
| 2009-11-10
 
| 2009-11-10
|
+
|  
 
| The tank battery is set and fenced off and the well is fenced. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the grass has established.
 
| The tank battery is set and fenced off and the well is fenced. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the grass has established.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1043170641
 
| 2009-08-06
 
|
 
| Daily Excavating and ChemTech were on site to solidify the drilling pits.
 
|
 
|
 
|
 
|-
 
|-
 
| 1185645786
 
| 2009-09-03
 
|
 
| The well has been fraced and the tank battery has been assembled. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 549708033
 
| 2009-07-29
 
|
 
| Status check inspection found the pits in good condition. Wildcat is drilling ahead and should TD the well on 7/31.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 577060260
 
| 577060260
 
| 2009-08-12
 
| 2009-08-12
|
+
|  
 
| Status check inspection found the drilling pits are being solidified and covered over.
 
| Status check inspection found the drilling pits are being solidified and covered over.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 03:05, 15 July 2015

Well Details

Well ID: 34-153-23071
Loading map...
County: Summit
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-07-27
Unconventional: No
Configuration: Vertical
Well Status: Plugged and Abandoned
Violations: 0
Latitude: 41.27612565
Longitude: -81.66822243

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 4580.0 102.0
2011-0 9421.0 32.0
2012-0 4885.0 65.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1022198460 2009-07-27 Wildcat Drilling is moving in and will spud the well tonight. The shale pit has been dug and lined. The blow pit will be dug later today.
1043170641 2009-08-06 Daily Excavating and ChemTech were on site to solidify the drilling pits.
1185645786 2009-09-03 The well has been fraced and the tank battery has been assembled. No violations at this time.
-1252745616 2009-07-15 The drilling location has been built and waiting for the drilling rig. The ID and permit are posted.
-1520334237 2009-07-31 Wildcat reached TD and ran 4-1/2 casing. The rig will be moving on 8/5. The pits are lined, fenced and in good condition.
-1583329224 2010-04-20 Preliminary restoration is approved.
-1717076842 2010-01-13 Status check inspection found no violations at this time. Preliminary restoration should be approved this spring.
-40322359 2009-08-04 Wildcat is rigging down and will finish moving on 8/5. The pits are fenced, lined and in good condition.
549708033 2009-07-29 Status check inspection found the pits in good condition. Wildcat is drilling ahead and should TD the well on 7/31.
-562263550 2009-11-10 The tank battery is set and fenced off and the well is fenced. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the grass has established.
577060260 2009-08-12 Status check inspection found the drilling pits are being solidified and covered over.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.