If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23121 | | Well ID: 34-153-23121 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01743314, -81.55895577 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Summit County, Ohio|Summit]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CARGILL INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2010-12-03 | | Spud Date: 2010-12-03 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.01743314 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.55895577 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1061687642 | | -1061687642 | ||
| 2010-12-14 | | 2010-12-14 | ||
− | | | + | | |
| Union Drilling is back to drilling. They anticipate reaching TD within the next four days. No violations at this time. | | Union Drilling is back to drilling. They anticipate reaching TD within the next four days. No violations at this time. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 1231360436 |
− | | | + | | 2014-12-05 |
− | | | + | | |
− | | | + | | An inspection of the well found no violations at the time. |
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1292263806 | | 1292263806 | ||
| 2010-12-05 | | 2010-12-05 | ||
− | | | + | | |
− | | Union Drilling Rig 24 spudded the well with a 20 | + | | Union Drilling Rig 24 spudded the well with a 20 bit and drilled to 130' with freshwater mud. While running the 16 conductor casing, the casing set down at 90'. Repeated attempts failed and the company decided to lay the casing down and run the bit back in to clean the hole. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1292332276 | | 1292332276 | ||
| 2010-12-08 | | 2010-12-08 | ||
− | | | + | | |
| Union is drilling the surface hole with fresh water mud. No violations at this time. | | Union is drilling the surface hole with fresh water mud. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1293078968 | | 1293078968 | ||
| 2010-12-13 | | 2010-12-13 | ||
− | | | + | | |
| Union Drilling Rig 24 is down for repairs to the mud pump. Should be back to drilling later tonight. No violations at this time. | | Union Drilling Rig 24 is down for repairs to the mud pump. Should be back to drilling later tonight. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1293906824 | ||
+ | | 2010-12-27 | ||
+ | | | ||
+ | | Union Drilling Rig 24 is going back in the hole to drill the horizontal component of the well to connect to Akron 76. No violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1355393241 | ||
+ | | 2010-12-06 | ||
+ | | | ||
+ | | Union ran the 20 bit back in the well in order to remove the obstruction at 90'. The rig then ran the 16 casing back in the well and hit the obstruction again. This time, Union will ream the hole with a 26 bit. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1424943909 | | 1424943909 | ||
| 2011-03-02 | | 2011-03-02 | ||
− | | | + | | |
| Cargill is installing the pipelines to operate the last two well drilled. Restoration work has not yet started. | | Cargill is installing the pipelines to operate the last two well drilled. Restoration work has not yet started. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1625508624 | | 1625508624 | ||
| 2011-01-20 | | 2011-01-20 | ||
− | | | + | | |
− | | On site to witness the cement bond log. The logging company was Superior Well Services. Logs were run on both this well and on City of Akron #76, permit number 3120. Both logs indicated good bond between the formation and the 7 | + | | On site to witness the cement bond log. The logging company was Superior Well Services. Logs were run on both this well and on City of Akron #76, permit number 3120. Both logs indicated good bond between the formation and the 7 production casing through the top of the Big Lime with variable quality across the shale section. The logs on both wells were run at atmospheric pressure. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1776840995 | | 1776840995 | ||
| 2013-06-24 | | 2013-06-24 | ||
− | | | + | | |
| The well was properly identified. My inspection was accompanied by Andrew Adgate. | | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 415182573 | | 415182573 | ||
| 2011-10-24 | | 2011-10-24 | ||
− | | | + | | |
| Preliminary Restoration is approved. | | Preliminary Restoration is approved. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -974912759 | ||
+ | | 2010-12-20 | ||
+ | | | ||
+ | | Completed the mechanical integrity test on the 7 casing that was cemented in place on 12/18. The initial test pressure was 590 psi. After five minutes the pressure was 585 psi. After ten minutes the pressure was 585 psi and after 15 minutes the pressure was 582 psi for a total loss of eight psi over 15 mintes. The allowable loss was 30 psi meaning the MIT passed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-153-23121 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01743314,"lon":-81.55895577,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-12-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.01743314 | |
Longitude: -81.55895577 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1061687642 | 2010-12-14 | Union Drilling is back to drilling. They anticipate reaching TD within the next four days. No violations at this time. | ||||
1231360436 | 2014-12-05 | An inspection of the well found no violations at the time. | ||||
1292263806 | 2010-12-05 | Union Drilling Rig 24 spudded the well with a 20 bit and drilled to 130' with freshwater mud. While running the 16 conductor casing, the casing set down at 90'. Repeated attempts failed and the company decided to lay the casing down and run the bit back in to clean the hole. | ||||
1292332276 | 2010-12-08 | Union is drilling the surface hole with fresh water mud. No violations at this time. | ||||
1293078968 | 2010-12-13 | Union Drilling Rig 24 is down for repairs to the mud pump. Should be back to drilling later tonight. No violations at this time. | ||||
-1293906824 | 2010-12-27 | Union Drilling Rig 24 is going back in the hole to drill the horizontal component of the well to connect to Akron 76. No violations at this time. | ||||
-1355393241 | 2010-12-06 | Union ran the 20 bit back in the well in order to remove the obstruction at 90'. The rig then ran the 16 casing back in the well and hit the obstruction again. This time, Union will ream the hole with a 26 bit. | ||||
1424943909 | 2011-03-02 | Cargill is installing the pipelines to operate the last two well drilled. Restoration work has not yet started. | ||||
1625508624 | 2011-01-20 | On site to witness the cement bond log. The logging company was Superior Well Services. Logs were run on both this well and on City of Akron #76, permit number 3120. Both logs indicated good bond between the formation and the 7 production casing through the top of the Big Lime with variable quality across the shale section. The logs on both wells were run at atmospheric pressure. | ||||
1776840995 | 2013-06-24 | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||||
415182573 | 2011-10-24 | Preliminary Restoration is approved. | ||||
-974912759 | 2010-12-20 | Completed the mechanical integrity test on the 7 casing that was cemented in place on 12/18. The initial test pressure was 590 psi. After five minutes the pressure was 585 psi. After ten minutes the pressure was 585 psi and after 15 minutes the pressure was 582 psi for a total loss of eight psi over 15 mintes. The allowable loss was 30 psi meaning the MIT passed. |
For data sources see[1]