X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24325"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-133-24325
 
| Well ID: 34-133-24325
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.3396419083, -81.3807428675 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.33964191, -81.38074287 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Portage County, Ohio|Portage]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TRANSCONTINENTAL O & G]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2006-12-30
 
| Spud Date: 2006-12-30
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.3396419083
+
| Latitude: 41.33964191
 
|-
 
|-
| Longitude: -81.3807428675
+
| Longitude: -81.38074287
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2007-0
 +
| style="text-align:right;" | 9857.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 257.0
 +
|
 +
|-
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 17767.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 447.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 17016.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 198.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 11336.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 188.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 7158.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 42.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 5087.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 149.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 3674.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 61.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3019.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 149.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 130:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1016878884
 
| -1016878884
 
| 2007-08-23
 
| 2007-08-23
|
+
|  
 
| Preliminary restoration is approved.
 
| Preliminary restoration is approved.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1169483961
 +
| 2007-01-18
 +
|
 +
| The drilling pits are scheduled to be solidified by the end of January. There is sufficient freeboard to contain rain or snow.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1180098666
 +
| 2007-05-17
 +
|
 +
| The tank battery has been set, the fence is up and the site has been rough graded. The well should be ready to turn on in the near future. Preliminary restoration is due by the end of September. No violations at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -1499690858
 
| -1499690858
 
| 2007-01-23
 
| 2007-01-23
|
+
|  
 
| The drilling pits are fenced but are still open and must be solidified by February 5. The liners are still in good condition with sufficient free board. No violations at this time.
 
| The drilling pits are fenced but are still open and must be solidified by February 5. The liners are still in good condition with sufficient free board. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1693838276
 
| -1693838276
 
| 2007-02-07
 
| 2007-02-07
|
+
|  
 
| Cal Marks was on site to start solidifying and closing the drilling pits. The deadline for closure was February 8. No violations at this time.
 
| Cal Marks was on site to start solidifying and closing the drilling pits. The deadline for closure was February 8. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -641287269
 
| -641287269
 
| 2007-01-09
 
| 2007-01-09
|
+
|  
 
| Capstar Drilling has moved off the location. The pits are fenced, lined and in good condition with sufficient freeboard. According to Cal Marks with Transcontinental, the pits will be solidified by January 18 which will meet the permit requirement.
 
| Capstar Drilling has moved off the location. The pits are fenced, lined and in good condition with sufficient freeboard. According to Cal Marks with Transcontinental, the pits will be solidified by January 18 which will meet the permit requirement.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1169483961
 
| 2007-01-18
 
|
 
| The drilling pits are scheduled to be solidified by the end of January. There is sufficient freeboard to contain rain or snow.
 
|
 
|
 
|
 
|-
 
|-
 
| 1180098666
 
| 2007-05-17
 
|
 
| The tank battery has been set, the fence is up and the site has been rough graded. The well should be ready to turn on in the near future. Preliminary restoration is due by the end of September. No violations at this time.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:33, 15 July 2015

Well Details

Well ID: 34-133-24325
Loading map...
County: Portage
Municipality:
Operator Name: TRANSCONTINENTAL O & G
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-12-30
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.33964191
Longitude: -81.38074287

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2007-0 9857.0 257.0
2008-0 17767.0 447.0
2009-0 17016.0 198.0
2010-0 11336.0 188.0
2011-0 7158.0 42.0
2012-0 5087.0 149.0
2013-0 3674.0 61.0
2014-0 3019.0 365.0 149.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1016878884 2007-08-23 Preliminary restoration is approved.
1169483961 2007-01-18 The drilling pits are scheduled to be solidified by the end of January. There is sufficient freeboard to contain rain or snow.
1180098666 2007-05-17 The tank battery has been set, the fence is up and the site has been rough graded. The well should be ready to turn on in the near future. Preliminary restoration is due by the end of September. No violations at this time.
-1499690858 2007-01-23 The drilling pits are fenced but are still open and must be solidified by February 5. The liners are still in good condition with sufficient free board. No violations at this time.
-1693838276 2007-02-07 Cal Marks was on site to start solidifying and closing the drilling pits. The deadline for closure was February 8. No violations at this time.
-641287269 2007-01-09 Capstar Drilling has moved off the location. The pits are fenced, lined and in good condition with sufficient freeboard. According to Cal Marks with Transcontinental, the pits will be solidified by January 18 which will meet the permit requirement.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.