If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-139-20760 | | Well ID: 34-139-20760 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.56261017, -82.46109663 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Richland County, Ohio|Richland]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[GEOPETRO LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2011-08-21 | | Spud Date: 2011-08-21 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.56261017 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.46109663 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 1455.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 2130.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 482.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 85: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1041114904 | | -1041114904 | ||
| 2011-08-25 | | 2011-08-25 | ||
− | | | + | | |
| Inspect drill rig. Drilling. Current depth 2655 feet. | | Inspect drill rig. Drilling. Current depth 2655 feet. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1175711591 | ||
+ | | 2011-08-22 | ||
+ | | | ||
+ | | Set and cement surface casing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -1259839064 | | -1259839064 | ||
| 2011-08-15 | | 2011-08-15 | ||
− | | | + | | |
| Inspect location. Pits are being excavated. Rig will be on site within days. | | Inspect location. Pits are being excavated. Rig will be on site within days. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1347463013 | ||
+ | | 2011-08-29 | ||
+ | | | ||
+ | | Inspect drill rig. Completed depth 4411 feet. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -2108060464 | | -2108060464 | ||
| 2012-11-01 | | 2012-11-01 | ||
− | | | + | | |
| Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction. | | Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -2144624687 | | -2144624687 | ||
| 2014-06-11 | | 2014-06-11 | ||
− | | | + | | |
| ID posted, location maintained. The well is in production. The well has a pump jack on it. 2 tanks and a separator in the tank battery. | | ID posted, location maintained. The well is in production. The well has a pump jack on it. 2 tanks and a separator in the tank battery. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -243193507 | | -243193507 | ||
| 2012-04-12 | | 2012-04-12 | ||
− | | | + | | |
| inspect well. site restoration is complete. Well is shut in. no production equipment. | | inspect well. site restoration is complete. Well is shut in. no production equipment. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 274454208 | ||
+ | | 2011-08-30 | ||
+ | | | ||
+ | | Contacted by operator. Installation of 4.5 inch casing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -474113030 | | -474113030 | ||
| 2012-08-21 | | 2012-08-21 | ||
− | | | + | | |
| Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site. | | Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -482251416 | | -482251416 | ||
| 2012-08-28 | | 2012-08-28 | ||
− | | | + | | |
| Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints. Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F. | | Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints. Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 771373265 | | 771373265 | ||
| 2011-08-22 | | 2011-08-22 | ||
− | | | + | | |
| Inspect drill site. Current depth of 585 feet. | | Inspect drill site. Current depth of 585 feet. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-139-20760 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.56261017,"lon":-82.46109663,"icon":""}]} |
County: Richland | |
Municipality: | |
Operator Name: GEOPETRO LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-08-21 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.56261017 | |
Longitude: -82.46109663 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 1455.0 | 0.0 | ||||
2013-0 | 2130.0 | 0.0 | ||||
2014-0 | 482.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1041114904 | 2011-08-25 | Inspect drill rig. Drilling. Current depth 2655 feet. | ||||
1175711591 | 2011-08-22 | Set and cement surface casing. | ||||
-1259839064 | 2011-08-15 | Inspect location. Pits are being excavated. Rig will be on site within days. | ||||
1347463013 | 2011-08-29 | Inspect drill rig. Completed depth 4411 feet. | ||||
-2108060464 | 2012-11-01 | Inspect well. well is capable of production. Pump jack set on well. One 100 bbl and one 80 bbl tank set in new dike construction. | ||||
-2144624687 | 2014-06-11 | ID posted, location maintained. The well is in production. The well has a pump jack on it. 2 tanks and a separator in the tank battery. | ||||
-243193507 | 2012-04-12 | inspect well. site restoration is complete. Well is shut in. no production equipment. | ||||
274454208 | 2011-08-30 | Contacted by operator. Installation of 4.5 inch casing. | ||||
-474113030 | 2012-08-21 | Inspect well and location. BiJoe development plugged back well. Bill Mitten set bottom plug. Rip casing at 3824 ft. pull 2 joints, 87.6 ft. set rip plug. Doug Core was on site. | ||||
-482251416 | 2012-08-28 | Inspect well and location. Geopetro hired Bill Mitten to run 4.5 inch long string and cement in place on well that was plugged back. Install 79 joints of Range 2 and 3 4.5 inch used pipe tested with drift of 4.5. Total of 2465 feet, install centralizers at 1st, 5th, and 8th joints. Cement with 100 sacks of Class A cement by Cementco. Tested water on site PH 8.0 and Temperature of 70 F. | ||||
771373265 | 2011-08-22 | Inspect drill site. Current depth of 585 feet. |
For data sources see[2]