X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24324"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24324
 
| Well ID: 34-111-24324
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.6764513352, -81.2005392351 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.67645134, -81.20053924 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[HG ENERGY LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-05-17
 
| Spud Date: 2013-05-17
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.6764513352
+
| Latitude: 39.67645134
 
|-
 
|-
| Longitude: -81.2005392351
+
| Longitude: -81.20053924
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1328117564
 +
| 2013-09-16
 +
|
 +
| Inspection and status check of the plugging and abandoning of a lost down hole drill assembly, The total depth that the assembly was lost was 8109' with the top at 7805, a abandonment plug was set from 7766' to 7220' the company shall retain their proposed well bore depth to set the 9.625'' casing string by deviating the well bore around the lost drill tools. Baker Hugs cement services used 745 sacks of class H cement in the plug back and abandon process.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1337315667
 
| -1337315667
 
| 2013-09-11
 
| 2013-09-11
|
+
|  
 
| Inspection and status check on the drilling progress found the company making a clean out run with a 17.5'' tri cone drill bit after attempts to run the 13.375'' casing was unsuccessful. The plug back over the lost hammer bit left a cement stringer in the hole. I was also on the location 4 hours the previous evening for the callout to cement the 13.375'' when it was discovered the casing would not go.
 
| Inspection and status check on the drilling progress found the company making a clean out run with a 17.5'' tri cone drill bit after attempts to run the 13.375'' casing was unsuccessful. The plug back over the lost hammer bit left a cement stringer in the hole. I was also on the location 4 hours the previous evening for the callout to cement the 13.375'' when it was discovered the casing would not go.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -2138029954
 
| 2013-09-30
 
|
 
| Status check inspection on the drilling progress of the Horizontal well bore section found the current bit depth to be 8,972' using a 8.5'' Baker auto directional tool with 13.1# 82 viscosity oil based mud and a current azimuth of 169.89 degrees and inclination of 33.30 degrees.
 
|
 
|
 
|
 
|-
 
|-
 
| -290332452
 
| 2013-09-11
 
|
 
| Status check inspection on the drilling process found the current drilling depth to be 7442' using a 12.250'' drill bit. The next casing point shall be 8350'.
 
|
 
|
 
|
 
|-
 
|-
 
| 1328117564
 
| 2013-09-16
 
|
 
| Inspection and status check of the plugging and abandoning of a lost down hole drill assembly, The total depth that the assembly was lost was 8109' with the top at 7805, a abandonment plug was set from 7766' to 7220' the company shall retain their proposed well bore depth to set the 9.625'' casing string by deviating the well bore around the lost drill tools. Baker Hugs cement services used 745 sacks of class H cement in the plug back and abandon process.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1371141061
 
| 1371141061
 
| 2013-06-13
 
| 2013-06-13
|
+
|  
 
| On this day 1095' of 13.375'' casing was set and cemented to surface with 65 barrels of cement returns and good lift pressure during the cement job. the casing was pressure tested to 400 psi over lift pressure upon the landing of the plug. All records received- casing tally &  cement job. The permit was issued under the pre 08-01-2012 rules.
 
| On this day 1095' of 13.375'' casing was set and cemented to surface with 65 barrels of cement returns and good lift pressure during the cement job. the casing was pressure tested to 400 psi over lift pressure upon the landing of the plug. All records received- casing tally &  cement job. The permit was issued under the pre 08-01-2012 rules.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1797765858
 
| 1797765858
 
| 2013-10-10
 
| 2013-10-10
|
+
|  
 
| On site inspection and status check of the running of the 5.5'' production casing, The well bore total drilling depth was reached at 15,378' and 15,373' of 5.5''- 20# P-110 casing is being ran at a current depth of 7320'. All records were received and reviewed.
 
| On site inspection and status check of the running of the 5.5'' production casing, The well bore total drilling depth was reached at 15,378' and 15,373' of 5.5''- 20# P-110 casing is being ran at a current depth of 7320'. All records were received and reviewed.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 180171498
 
| 180171498
 
| 2013-10-07
 
| 2013-10-07
|
+
|  
 
| Status check inspection found the company currently drilling in the Horizontal well bore section with a 8.5'' directional down hole steer able assembly at 13,918' with a project total depth of 15,375' the oil based mud weight is 13.2 pounds per gallon and there are 3308 units of measurable 3rd party gas present. The current borehole direction is a azimuth of 130.35 degrees with a TVD of 9,165'.
 
| Status check inspection found the company currently drilling in the Horizontal well bore section with a 8.5'' directional down hole steer able assembly at 13,918' with a project total depth of 15,375' the oil based mud weight is 13.2 pounds per gallon and there are 3308 units of measurable 3rd party gas present. The current borehole direction is a azimuth of 130.35 degrees with a TVD of 9,165'.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1927891352
 
| 1927891352
 
| 2013-09-25
 
| 2013-09-25
|
+
|  
 
| Status check inspection at 9 Am  per notification of the company man on site to witness the cementing of the 9.625'' casing string, Upon arrival the drilling rig HAD rig 105 was washing in the last 23' of casing and was not going to be ready to cement the 1st stage for several hours, I returned 2 other times throughout the day and at 5 Pm the cementers were just beginning he 1st stage cement job. A casing tally was received Total depth drilled 8363'-total pipe 8363'- DV tool @ 4014' float shoe and collar ran along with proper centralizer placement.
 
| Status check inspection at 9 Am  per notification of the company man on site to witness the cementing of the 9.625'' casing string, Upon arrival the drilling rig HAD rig 105 was washing in the last 23' of casing and was not going to be ready to cement the 1st stage for several hours, I returned 2 other times throughout the day and at 5 Pm the cementers were just beginning he 1st stage cement job. A casing tally was received Total depth drilled 8363'-total pipe 8363'- DV tool @ 4014' float shoe and collar ran along with proper centralizer placement.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2138029954
 +
| 2013-09-30
 +
|
 +
| Status check inspection on the drilling progress of the Horizontal well bore section found the current bit depth to be 8,972' using a 8.5'' Baker auto directional tool with 13.1# 82 viscosity oil based mud and a current azimuth of 169.89 degrees and inclination of 33.30 degrees.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 228095483
 
| 228095483
 
| 2013-09-18
 
| 2013-09-18
|
+
|  
 
| Status check inspection on the drilling process found the current drilling depth of 7438' and the drilling company running back in the hole with  12.250'' directional tools after pulling the drill string to switch out the direction drive tool.
 
| Status check inspection on the drilling process found the current drilling depth of 7438' and the drilling company running back in the hole with  12.250'' directional tools after pulling the drill string to switch out the direction drive tool.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -290332452
 +
| 2013-09-11
 +
|
 +
| Status check inspection on the drilling process found the current drilling depth to be 7442' using a 12.250'' drill bit. The next casing point shall be 8350'.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 365725302
 
| 365725302
 
| 2013-09-04
 
| 2013-09-04
|
+
|  
 
| Inspection found the drilling company HAD Drilling Rig 105 rigged up on the hole and currently switching out bottom hole drilling assemblies after a drive motor failure. Their current drilling depth is 1331' - 130' below the 13.375'' surface casing.
 
| Inspection found the drilling company HAD Drilling Rig 105 rigged up on the hole and currently switching out bottom hole drilling assemblies after a drive motor failure. Their current drilling depth is 1331' - 130' below the 13.375'' surface casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 597661104
 
| 597661104
 
| 2013-05-17
 
| 2013-05-17
|
+
|  
 
| The said well was spudded on this day with 80' of 3/8'' wall- 20'' diameter conductor being set with no annular space.
 
| The said well was spudded on this day with 80' of 3/8'' wall- 20'' diameter conductor being set with no annular space.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 635932616
 
| 635932616
 
| 2013-09-09
 
| 2013-09-09
|
+
|  
 
| Inspection and status check on the drilling progress found the current drilling depth to be 6098' using a 12.250'' bit. The company man indicated they were pulling out of the hole with the drill string for a bit change.
 
| Inspection and status check on the drilling progress found the current drilling depth to be 6098' using a 12.250'' bit. The company man indicated they were pulling out of the hole with the drill string for a bit change.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 950052219
 
| 950052219
 
| 2013-09-23
 
| 2013-09-23
|
+
|  
 
| Status check inspection on the drilling process found the current drilling depth to be 8113' using a 12.250'' drill bit with the next casing point to be 8360' setting 9.625'' casing.
 
| Status check inspection on the drilling process found the current drilling depth to be 8113' using a 12.250'' drill bit with the next casing point to be 8360' setting 9.625'' casing.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:14, 15 July 2015

Well Details

Well ID: 34-111-24324
Loading map...
County: Monroe
Municipality:
Operator Name: HG ENERGY LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-05-17
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.67645134
Longitude: -81.20053924

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 0.0 0.0 0.0 0.0
2015-1 0.0 0.0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1328117564 2013-09-16 Inspection and status check of the plugging and abandoning of a lost down hole drill assembly, The total depth that the assembly was lost was 8109' with the top at 7805, a abandonment plug was set from 7766' to 7220' the company shall retain their proposed well bore depth to set the 9.625 casing string by deviating the well bore around the lost drill tools. Baker Hugs cement services used 745 sacks of class H cement in the plug back and abandon process.
-1337315667 2013-09-11 Inspection and status check on the drilling progress found the company making a clean out run with a 17.5 tri cone drill bit after attempts to run the 13.375 casing was unsuccessful. The plug back over the lost hammer bit left a cement stringer in the hole. I was also on the location 4 hours the previous evening for the callout to cement the 13.375 when it was discovered the casing would not go.
1371141061 2013-06-13 On this day 1095' of 13.375 casing was set and cemented to surface with 65 barrels of cement returns and good lift pressure during the cement job. the casing was pressure tested to 400 psi over lift pressure upon the landing of the plug. All records received- casing tally & cement job. The permit was issued under the pre 08-01-2012 rules.
1797765858 2013-10-10 On site inspection and status check of the running of the 5.5 production casing, The well bore total drilling depth was reached at 15,378' and 15,373' of 5.5- 20# P-110 casing is being ran at a current depth of 7320'. All records were received and reviewed.
180171498 2013-10-07 Status check inspection found the company currently drilling in the Horizontal well bore section with a 8.5 directional down hole steer able assembly at 13,918' with a project total depth of 15,375' the oil based mud weight is 13.2 pounds per gallon and there are 3308 units of measurable 3rd party gas present. The current borehole direction is a azimuth of 130.35 degrees with a TVD of 9,165'.
1927891352 2013-09-25 Status check inspection at 9 Am per notification of the company man on site to witness the cementing of the 9.625 casing string, Upon arrival the drilling rig HAD rig 105 was washing in the last 23' of casing and was not going to be ready to cement the 1st stage for several hours, I returned 2 other times throughout the day and at 5 Pm the cementers were just beginning he 1st stage cement job. A casing tally was received Total depth drilled 8363'-total pipe 8363'- DV tool @ 4014' float shoe and collar ran along with proper centralizer placement.
-2138029954 2013-09-30 Status check inspection on the drilling progress of the Horizontal well bore section found the current bit depth to be 8,972' using a 8.5 Baker auto directional tool with 13.1# 82 viscosity oil based mud and a current azimuth of 169.89 degrees and inclination of 33.30 degrees.
228095483 2013-09-18 Status check inspection on the drilling process found the current drilling depth of 7438' and the drilling company running back in the hole with 12.250 directional tools after pulling the drill string to switch out the direction drive tool.
-290332452 2013-09-11 Status check inspection on the drilling process found the current drilling depth to be 7442' using a 12.250 drill bit. The next casing point shall be 8350'.
365725302 2013-09-04 Inspection found the drilling company HAD Drilling Rig 105 rigged up on the hole and currently switching out bottom hole drilling assemblies after a drive motor failure. Their current drilling depth is 1331' - 130' below the 13.375 surface casing.
597661104 2013-05-17 The said well was spudded on this day with 80' of 3/8 wall- 20 diameter conductor being set with no annular space.
635932616 2013-09-09 Inspection and status check on the drilling progress found the current drilling depth to be 6098' using a 12.250 bit. The company man indicated they were pulling out of the hole with the drill string for a bit change.
950052219 2013-09-23 Status check inspection on the drilling process found the current drilling depth to be 8113' using a 12.250 drill bit with the next casing point to be 8360' setting 9.625 casing.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.