X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-127-23785"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-127-23785
 
| Well ID: 34-127-23785
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.6914087351, -82.2548579025 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.69140874, -82.2548579 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Perry County, Ohio|Perry]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[JEANIE ENTERPISES LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date:  
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Final Restoration
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.6914087351
+
| Latitude: 39.69140874
 
|-
 
|-
| Longitude: -82.2548579025
+
| Longitude: -82.2548579
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1984-0
 +
| style="text-align:right;" | 2422.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 373.0
 +
|
 +
|-
 +
|-
 +
| 1985-0
 +
| style="text-align:right;" | 2678.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 301.0
 +
|
 +
|-
 +
|-
 +
| 1986-0
 +
| style="text-align:right;" | 1412.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 223.0
 +
|
 +
|-
 +
|-
 +
| 1987-0
 +
| style="text-align:right;" | 1186.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 203.0
 +
|
 +
|-
 +
|-
 +
| 1988-0
 +
| style="text-align:right;" | 1280.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 104.0
 +
|
 +
|-
 +
|-
 +
| 1989-0
 +
| style="text-align:right;" | 455.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 76.0
 +
|
 +
|-
 +
|-
 +
| 1990-0
 +
| style="text-align:right;" | 1102.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 140.0
 +
|
 +
|-
 +
|-
 +
| 1991-0
 +
| style="text-align:right;" | 585.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 136.0
 +
|
 +
|-
 +
|-
 +
| 1992-0
 +
| style="text-align:right;" | 708.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 117.0
 +
|
 +
|-
 +
|-
 +
| 1993-0
 +
| style="text-align:right;" | 705.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 68.0
 +
|
 +
|-
 +
|-
 +
| 1994-0
 +
| style="text-align:right;" | 676.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 71.0
 +
|
 +
|-
 +
|-
 +
| 1995-0
 +
| style="text-align:right;" | 241.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1996-0
 +
| style="text-align:right;" | 241.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1997-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1998-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 79.0
 +
|
 +
|-
 +
|-
 +
| 1999-0
 +
| style="text-align:right;" | 280.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 78.0
 +
|
 +
|-
 +
|-
 +
| 2000-0
 +
| style="text-align:right;" | 297.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 77.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 222.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 38.0
 +
|
 +
|-
 +
|-
 +
| 2002-0
 +
| style="text-align:right;" | 187.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 76.0
 +
|
 +
|-
 +
|-
 +
| 2003-0
 +
| style="text-align:right;" | 311.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 487.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 79.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 739.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 216.0
 +
|
 +
|-
 +
|-
 +
| 2006-0
 +
| style="text-align:right;" | 465.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2007-0
 +
| style="text-align:right;" | 238.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 66.0
 +
|
 +
|-
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 341.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 90.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 289.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 225.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 319:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1072693153
 +
| 2013-10-17
 +
|
 +
| I visited with Tim Schmeltzer about the tanks and the pumping unit still on this location. He told me that no one even told him about it. I let him know that I left Mark Schmeltzer a message a week ago about it. He said he would get someone on it right away.
 +
|
 +
|
 +
| Field Visit or Inspection
 +
|-
 
|-
 
|-
 
| -1073230507
 
| -1073230507
 
| 2013-10-09
 
| 2013-10-09
|
+
|  
 
| I was unable to do the final restoration on this well. There is still 3-100 barrel tanks on location and a pumping unit. I called Mark Schmeltzer and left him a message. I told him this stuff needs to be removed for me to do the final restoration.
 
| I was unable to do the final restoration on this well. There is still 3-100 barrel tanks on location and a pumping unit. I called Mark Schmeltzer and left him a message. I told him this stuff needs to be removed for me to do the final restoration.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1117747345
 
| -1117747345
 
| 2013-05-03
 
| 2013-05-03
|
+
|  
 
| Appalachian well service is on site, they ran a bond log to determine the area of free pipe. The bond log showed the 4.5'' casing to be free at 2450'. The casing was shot off at this depth. No other work was performed this day.
 
| Appalachian well service is on site, they ran a bond log to determine the area of free pipe. The bond log showed the 4.5'' casing to be free at 2450'. The casing was shot off at this depth. No other work was performed this day.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1171908909
 
| -1171908909
 
| 2013-05-15
 
| 2013-05-15
|
+
|  
 
| I checked to make sure the clay was still at the top of the hole. It has been open for a week. The clay has not dropped. I contacted Danny Baker to let him no that they could cut it off and put a plate on it.
 
| I checked to make sure the clay was still at the top of the hole. It has been open for a week. The clay has not dropped. I contacted Danny Baker to let him no that they could cut it off and put a plate on it.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -24007009
+
| -1321274789
| 2013-05-08
+
| 2013-08-26
|
+
|  
| Clay settled down hole about 10'. They topped the well off and are going to let sit for 1 week. I am going to give them the ok before they cut it off and cover it up.
+
| I went out to do final restoration on this well, I ended up finding a pumping unit, 3-100 barrel tanks and some plastic. I contacted Danny Baker to remind him this still needed to be done so I can write this well off. He will address the issue.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1072693153
+
| 1368126824
| 2013-10-17
+
| 2013-05-06
|
+
|  
| I visited with Tim Schmeltzer about the tanks and the pumping unit still on this location. He told me that no one even told him about it. I let him know that I left Mark Schmeltzer a message a week ago about it. He said he would get someone on it right away.
+
| The 4 was shot off at 2460'. They pulled out 500' of 4 then washed in 500' of clay. They then pulled out another row of 4 and shut down for the day. The trailer had to be switched out.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1368126824
+
| 1600296667
| 2013-05-06
+
| 2013-04-25
|
+
|  
| The 4" was shot off at 2460'. They pulled out 500' of 4" then washed in 500' of clay. They then pulled out another row of 4" and shut down for the day. The trailer had to be switched out.
+
| This well is going to be plugged. I stopped to see how everything was going. The rig crew is just pulling out the tubing today.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2036234710
 
| 2036234710
 
| 2013-05-07
 
| 2013-05-07
|
+
|  
| The rig crew finished pulling out the 4". Then they set a brush and stone plug at 1065'. They filled the rest of the hole with clay.
+
| The rig crew finished pulling out the 4. Then they set a brush and stone plug at 1065'. They filled the rest of the hole with clay.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 2049608090
 
| 2049608090
 
| 2013-05-01
 
| 2013-05-01
|
+
|  
| Matheney well service is plugging this well for Jeanie enterprises. They have pulled the tubing and are putting clay in the well today. They washed in the bottom plug then shut  down for the day. They are going to shoot the 4" off.
+
| Matheney well service is plugging this well for Jeanie enterprises. They have pulled the tubing and are putting clay in the well today. They washed in the bottom plug then shut  down for the day. They are going to shoot the 4 off.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -2074811361
 +
| 2013-11-04
 +
|
 +
| The final restoration meets 1509.072.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -24007009
 +
| 2013-05-08
 +
|
 +
| Clay settled down hole about 10'. They topped the well off and are going to let sit for 1 week.  I am going to give them the ok before they cut it off and cover it up.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 11:47, 15 July 2015

Well Details

Well ID: 34-127-23785
Loading map...
County: Perry
Municipality:
Operator Name: JEANIE ENTERPISES LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 39.69140874
Longitude: -82.2548579

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1984-0 2422.0 373.0
1985-0 2678.0 301.0
1986-0 1412.0 223.0
1987-0 1186.0 203.0
1988-0 1280.0 104.0
1989-0 455.0 76.0
1990-0 1102.0 140.0
1991-0 585.0 136.0
1992-0 708.0 117.0
1993-0 705.0 68.0
1994-0 676.0 71.0
1995-0 241.0 0.0
1996-0 241.0 0.0
1997-0 0.0 0.0
1998-0 0.0 79.0
1999-0 280.0 78.0
2000-0 297.0 77.0
2001-0 222.0 38.0
2002-0 187.0 76.0
2003-0 311.0 0.0
2004-0 487.0 79.0
2005-0 739.0 216.0
2006-0 465.0 0.0
2007-0 238.0 66.0
2008-0 341.0 90.0
2009-0 289.0 0.0
2010-0 0.0 0.0
2011-0 225.0 0.0
2012-0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1072693153 2013-10-17 I visited with Tim Schmeltzer about the tanks and the pumping unit still on this location. He told me that no one even told him about it. I let him know that I left Mark Schmeltzer a message a week ago about it. He said he would get someone on it right away. Field Visit or Inspection
-1073230507 2013-10-09 I was unable to do the final restoration on this well. There is still 3-100 barrel tanks on location and a pumping unit. I called Mark Schmeltzer and left him a message. I told him this stuff needs to be removed for me to do the final restoration.
-1117747345 2013-05-03 Appalachian well service is on site, they ran a bond log to determine the area of free pipe. The bond log showed the 4.5 casing to be free at 2450'. The casing was shot off at this depth. No other work was performed this day.
-1171908909 2013-05-15 I checked to make sure the clay was still at the top of the hole. It has been open for a week. The clay has not dropped. I contacted Danny Baker to let him no that they could cut it off and put a plate on it.
-1321274789 2013-08-26 I went out to do final restoration on this well, I ended up finding a pumping unit, 3-100 barrel tanks and some plastic. I contacted Danny Baker to remind him this still needed to be done so I can write this well off. He will address the issue.
1368126824 2013-05-06 The 4 was shot off at 2460'. They pulled out 500' of 4 then washed in 500' of clay. They then pulled out another row of 4 and shut down for the day. The trailer had to be switched out.
1600296667 2013-04-25 This well is going to be plugged. I stopped to see how everything was going. The rig crew is just pulling out the tubing today.
2036234710 2013-05-07 The rig crew finished pulling out the 4. Then they set a brush and stone plug at 1065'. They filled the rest of the hole with clay.
2049608090 2013-05-01 Matheney well service is plugging this well for Jeanie enterprises. They have pulled the tubing and are putting clay in the well today. They washed in the bottom plug then shut down for the day. They are going to shoot the 4 off.
-2074811361 2013-11-04 The final restoration meets 1509.072.
-24007009 2013-05-08 Clay settled down hole about 10'. They topped the well off and are going to let sit for 1 week. I am going to give them the ok before they cut it off and cover it up.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.