X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-22123"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-22123
 
| Well ID: 34-019-22123
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6021350777, -81.0007089771 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.60213508, -81.00070898 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2012-06-28
 
| Spud Date: 2012-06-28
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.6021350777
+
| Latitude: 40.60213508
 
|-
 
|-
| Longitude: -81.0007089771
+
| Longitude: -81.00070898
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 34570.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 859.0
 +
|
 +
|-
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 131084.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 3032.0
 +
|
 +
|-
 +
|-
 +
| 2013-3
 +
| style="text-align:right;" | 145365.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 2974.0
 +
|
 +
|-
 +
|-
 +
| 2013-6
 +
| style="text-align:right;" | 132324.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1537.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 101759.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1406.0
 +
|
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 87996.0
 +
| style="text-align:right;" | 87.0
 +
|
 +
|
 +
| style="text-align:right;" | 1604.0
 +
| style="text-align:right;" | 87.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 68552.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 650.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 73579.0
 +
| style="text-align:right;" | 84.0
 +
|
 +
|
 +
| style="text-align:right;" | 983.0
 +
| style="text-align:right;" | 84.0
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 72654.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 720.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 61705.0
 +
| style="text-align:right;" | 90.0
 +
|
 +
|
 +
| style="text-align:right;" | 631.0
 +
| style="text-align:right;" | 90.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 148:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1341461719
 
| 1341461719
 
| 2012-07-05
 
| 2012-07-05
|
+
|  
| I arrived on site at approximately 11:00pm (23:00hrs) on July 4th to witness the cementing of the 9 5/8" casing. Upon arrival, I observed that Patterson Drilling Rig # 328 had reached a total depth of  2415' and ran 2398' of 40#, 9 5/8" casing. Sam Barker (Consultant) advised that Weatherford had the wrong landing joint delivered and that they were waiting on another landing joint. He also advised that the landing joint should be on site before midnight. The landing joint arrived on site at 12:20am (00:20 hrs) via Mid East Trucking. The rig crew and Wyoming Casing ran the landing joint, rigged down Wyoming Casing, and rigged up O-TEX Cementing in preparation for cementing . O-TEX  pumped 870 sacks of Class "H" cement (15.6 PPG and 1.24 CUFT/SK yield) and got approximately 40 barrels of cement returns to surface (plug bumped @ 3:50am (03:50hrs). After obtaining a copy of the cement ticket, I departed the site at 4:58am (04:58hrs).
+
| I arrived on site at approximately 11:00pm (23:00hrs) on July 4th to witness the cementing of the 9 5/8 casing. Upon arrival, I observed that Patterson Drilling Rig # 328 had reached a total depth of  2415' and ran 2398' of 40#, 9 5/8 casing. Sam Barker (Consultant) advised that Weatherford had the wrong landing joint delivered and that they were waiting on another landing joint. He also advised that the landing joint should be on site before midnight. The landing joint arrived on site at 12:20am (00:20 hrs) via Mid East Trucking. The rig crew and Wyoming Casing ran the landing joint, rigged down Wyoming Casing, and rigged up O-TEX Cementing in preparation for cementing . O-TEX  pumped 870 sacks of Class H cement (15.6 PPG and 1.24 CUFT/SK yield) and got approximately 40 barrels of cement returns to surface (plug bumped @ 3:50am (03:50hrs). After obtaining a copy of the cement ticket, I departed the site at 4:58am (04:58hrs).
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1364534233
 +
| 2015-01-15
 +
|
 +
| I was on location to conduct a status check of this well.  The well is open flow with a wellhead tree assembly.  Jersey barriers were installed around the wellhead.  The tank battery consisted of 8, 400 BBL production tanks and was diked.  A windsock was installed on the top of the production tanks.  Other production equipment on the well pad consisted of:
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 12:52, 15 July 2015

Well Details

Well ID: 34-019-22123
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-06-28
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.60213508
Longitude: -81.00070898

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 34570.0 859.0
2013-12 131084.0 3032.0
2013-3 145365.0 2974.0
2013-6 132324.0 1537.0
2013-9 101759.0 1406.0
2014-1 87996.0 87.0 1604.0 87.0
2014-4 68552.0 92.0 650.0 92.0
2014-2 73579.0 84.0 983.0 84.0
2014-3 72654.0 92.0 720.0 92.0
2015-1 61705.0 90.0 631.0 90.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1341461719 2012-07-05 I arrived on site at approximately 11:00pm (23:00hrs) on July 4th to witness the cementing of the 9 5/8 casing. Upon arrival, I observed that Patterson Drilling Rig # 328 had reached a total depth of 2415' and ran 2398' of 40#, 9 5/8 casing. Sam Barker (Consultant) advised that Weatherford had the wrong landing joint delivered and that they were waiting on another landing joint. He also advised that the landing joint should be on site before midnight. The landing joint arrived on site at 12:20am (00:20 hrs) via Mid East Trucking. The rig crew and Wyoming Casing ran the landing joint, rigged down Wyoming Casing, and rigged up O-TEX Cementing in preparation for cementing . O-TEX pumped 870 sacks of Class H cement (15.6 PPG and 1.24 CUFT/SK yield) and got approximately 40 barrels of cement returns to surface (plug bumped @ 3:50am (03:50hrs). After obtaining a copy of the cement ticket, I departed the site at 4:58am (04:58hrs).
-1364534233 2015-01-15 I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.