X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-083-24518"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-083-24518
 
| Well ID: 34-083-24518
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.4977849888, -82.4205316498 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.49778499, -82.42053165 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Knox County, Ohio|Knox]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BI JOE DEVELOPMENT INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2011-06-18
 
| Spud Date: 2011-06-18
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.4977849888
+
| Latitude: 40.49778499
 
|-
 
|-
| Longitude: -82.4205316498
+
| Longitude: -82.42053165
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 7612.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 3513.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 23067.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 7981.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 15059.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 7639.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 12474.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 7129.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1308579962
 
| 1308579962
 
| 2011-06-19
 
| 2011-06-19
|
+
|  
 
| I inspected the well location shortly after the surface cement job had taken place.  There was evidence around the surface casing that there had been good cement returns to the surface.  The drilling rig hands installed a blow line and completed a BOP test.  The test pressure was 360psi and held for 20 minutes with no loss.  After the test, drilling commenced.  There was approximately 40 feet of cement left in the hole.  The pits are properly lined and retaining fluids.  There are no violations noted this date.
 
| I inspected the well location shortly after the surface cement job had taken place.  There was evidence around the surface casing that there had been good cement returns to the surface.  The drilling rig hands installed a blow line and completed a BOP test.  The test pressure was 360psi and held for 20 minutes with no loss.  After the test, drilling commenced.  There was approximately 40 feet of cement left in the hole.  The pits are properly lined and retaining fluids.  There are no violations noted this date.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1541417331
 
| 1541417331
 
| 2011-06-20
 
| 2011-06-20
|
+
|  
 
| G&H Drilling rig on location and drilling this new well.  They are currently drilling on air and at a depth of 1600 feet.  No violations noted this date.
 
| G&H Drilling rig on location and drilling this new well.  They are currently drilling on air and at a depth of 1600 feet.  No violations noted this date.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 696233672
 
| 696233672
 
| 2013-04-10
 
| 2013-04-10
|
+
|  
 
| This well is a producing well.
 
| This well is a producing well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 23:24, 15 July 2015

Well Details

Well ID: 34-083-24518
Loading map...
County: Knox
Municipality:
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-06-18
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.49778499
Longitude: -82.42053165

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 7612.0 3513.0
2012-0 23067.0 7981.0
2013-0 15059.0 7639.0
2014-0 12474.0 365.0 7129.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1308579962 2011-06-19 I inspected the well location shortly after the surface cement job had taken place. There was evidence around the surface casing that there had been good cement returns to the surface. The drilling rig hands installed a blow line and completed a BOP test. The test pressure was 360psi and held for 20 minutes with no loss. After the test, drilling commenced. There was approximately 40 feet of cement left in the hole. The pits are properly lined and retaining fluids. There are no violations noted this date.
1541417331 2011-06-20 G&H Drilling rig on location and drilling this new well. They are currently drilling on air and at a depth of 1600 feet. No violations noted this date.
696233672 2013-04-10 This well is a producing well.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.