X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22879"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-22879
 
| Well ID: 34-153-22879
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1553361823, -81.6570214046 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.15533618, -81.6570214 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[TRANSCONTINENTAL O & G]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1998-11-27
 
| Spud Date: 1998-11-27
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
| Violations: 2
+
| Violations: 0
 
|-
 
|-
| Latitude: 41.1553361823
+
| Latitude: 41.15533618
 
|-
 
|-
| Longitude: -81.6570214046
+
| Longitude: -81.6570214
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 1998-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1999-0
 +
| style="text-align:right;" | 6782.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1635.0
 +
|
 +
|-
 +
|-
 +
| 2000-0
 +
| style="text-align:right;" | 11451.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1681.0
 +
|
 +
|-
 +
|-
 +
| 2001-0
 +
| style="text-align:right;" | 12097.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1270.0
 +
|
 +
|-
 +
|-
 +
| 2002-0
 +
| style="text-align:right;" | 9442.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1004.0
 +
|
 +
|-
 +
|-
 +
| 2003-0
 +
| style="text-align:right;" | 6164.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 674.0
 +
|
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 6060.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 994.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 3955.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 460.0
 +
|
 +
|-
 +
|-
 +
| 2006-0
 +
| style="text-align:right;" | 6491.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 838.0
 +
|
 +
|-
 +
|-
 +
| 2007-0
 +
| style="text-align:right;" | 5395.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 485.0
 +
|
 +
|-
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 5330.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 611.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 5313.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 484.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 5080.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 371.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 3319.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 302.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 5040.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 318.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 4309.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 323.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 3528.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 219.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 211:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1041534313
 +
| 2003-01-02
 +
|
 +
| Violation has been corrected.
 +
|
 +
|
 +
| Phone Call
 +
|-
 
|-
 
|-
 
| 1041534313
 
| 1041534313
 
| 2003-01-02
 
| 2003-01-02
|
+
|  
 
| Violation has been corrected.
 
| Violation has been corrected.
|
+
|  
|
+
|  
|
+
| Phone Call
 
|-
 
|-
 
|-
 
|-
| 1400223229
+
| 1041534313
| 2002-10-07
+
| 2003-01-02
|
+
|  
| FOLLOW UP TO NOV #  361:  Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to pr
+
| Violation has been corrected.
|
+
|  
| 9-1-07
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1400223229
 
| 1400223229
 
| 2002-10-07
 
| 2002-10-07
|
+
|  
 
| FOLLOW UP TO NOV #  361:  Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to pr
 
| FOLLOW UP TO NOV #  361:  Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to pr
|
+
|  
| NONE C
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 36179623
 
| 36179623
 
| 2002-10-07
 
| 2002-10-07
|
+
|  
 
| Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to prevent direct communication with the nearby creek.
 
| Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to prevent direct communication with the nearby creek.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 882704898
 
| 882704898
 
| 2002-12-17
 
| 2002-12-17
|
+
|  
 
| NOV follow up inspection - the dike was still cut and the tank battery was flooded and frozen. Spoke with Cal Marks (330-995-0777) who indicated that the dike would be repaired as soon as possible and asked if it is acceptable to place a drain in the dike wall. I said that a drain was permitted as long as it has a valve which is kept closed. Draining is permitted under authorized supervision and verification that no hydrocarbons or brine are present.
 
| NOV follow up inspection - the dike was still cut and the tank battery was flooded and frozen. Spoke with Cal Marks (330-995-0777) who indicated that the dike would be repaired as soon as possible and asked if it is acceptable to place a drain in the dike wall. I said that a drain was permitted as long as it has a valve which is kept closed. Draining is permitted under authorized supervision and verification that no hydrocarbons or brine are present.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| iDIAN003824
 
| iDIAN003824
 
| 2000-01-12
 
| 2000-01-12
|
+
|  
|
+
|  
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 04:58, 16 July 2015

Well Details

Well ID: 34-153-22879
Loading map...
County: Summit
Municipality:
Operator Name: TRANSCONTINENTAL O & G
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1998-11-27
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.15533618
Longitude: -81.6570214

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1998-0 0.0 0.0
1999-0 6782.0 1635.0
2000-0 11451.0 1681.0
2001-0 12097.0 1270.0
2002-0 9442.0 1004.0
2003-0 6164.0 674.0
2004-0 6060.0 994.0
2005-0 3955.0 460.0
2006-0 6491.0 838.0
2007-0 5395.0 485.0
2008-0 5330.0 611.0
2009-0 5313.0 484.0
2010-0 5080.0 371.0
2011-0 3319.0 302.0
2012-0 5040.0 318.0
2013-0 4309.0 323.0
2014-0 3528.0 365.0 219.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1041534313 2003-01-02 Violation has been corrected. Phone Call
1041534313 2003-01-02 Violation has been corrected. Phone Call
1041534313 2003-01-02 Violation has been corrected.
1400223229 2002-10-07 FOLLOW UP TO NOV # 361: Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to pr
36179623 2002-10-07 Status check inspection - The brine tank has been overfilled which resulted in the release of brine and crude oil into the tank battery dike. The impacted soil needs to be removed. The drain cut on the north side of the dike must be filled in order to prevent direct communication with the nearby creek.
882704898 2002-12-17 NOV follow up inspection - the dike was still cut and the tank battery was flooded and frozen. Spoke with Cal Marks (330-995-0777) who indicated that the dike would be repaired as soon as possible and asked if it is acceptable to place a drain in the dike wall. I said that a drain was permitted as long as it has a valve which is kept closed. Draining is permitted under authorized supervision and verification that no hydrocarbons or brine are present.
iDIAN003824 2000-01-12

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.