X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-069-20139"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-069-20139
 
| Well ID: 34-069-20139
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.3276922109, -83.9594387461 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.32837915, -83.95939686 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Henry County, Ohio|Henry]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[SECOND OIL LTD]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2005-02-17
 
| Spud Date: 2005-02-17
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
| Violations: 1
+
| Violations: 0
 
|-
 
|-
| Latitude: 41.3276922109
+
| Latitude: 41.32837915
 
|-
 
|-
| Longitude: -83.9594387461
+
| Longitude: -83.95939686
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1078522987
 
| -1078522987
 
| 2013-07-17
 
| 2013-07-17
|
+
|  
 
| Inspect well for integrity and pressure. Well is shut in.
 
| Inspect well for integrity and pressure. Well is shut in.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1304788773
 
| 2011-06-28
 
|
 
| Inspect well and tanks. Three tanks in dike area. One tank has fluid, one tank has manway open, one tank the base of tank is heavily rusted. Hole in liner next to tanks. Failure to maintain integrity of liner  Station idle during inspection. No identifica
 
|
 
| 9-3-08(A)
 
|
 
|-
 
|-
 
| -1548205302
 
| 2006-06-01
 
|
 
| There was no injection pressure on the well. There was pressure on the annulus side but the gauge was not reading correctly. Could not removed gauge to check pressure. Left note at office to replace gauge. Remind operator that restoration of the injection well site must be completed after wheat is removed from field. There is grading that needs to be done to level high areas and fill low areas holding water. Topsoil should be replaced. As previously indicated by the operator, the injection line from the plant to the well would also be buried at that time. The injection line must be pressure tested with the inspector on site before operation. Please contact me at 419-599-0058 to arrange for the test.
 
|
 
|
 
|
 
|-
 
|-
 
| -1897358057
 
| 2013-04-03
 
|
 
| At the time of the inspection the well was shut in.
 
|
 
|
 
|
 
|-
 
|-
 
| -1918248227
 
| 2012-06-12
 
|
 
| Inspect Well. Well is Shut in.
 
|
 
|
 
|
 
|-
 
|-
 
| -1986763270
 
| 2010-11-17
 
|
 
| Check well and storage.
 
Liner in diked area is in good condition at this time, has some fresh water in it.
 
Identification posted at the well head.
 
Pit cuttings from drilling operations stock piled on the site by the well head.
 
|
 
|
 
|
 
|-
 
|-
 
| -2020481586
 
| 2009-03-26
 
|
 
| Checked well. ID sign posted. Annulus pressure 480 psi and injection pressure 0. The gas plant is not in operation at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| -302241433
 
| 2006-03-20
 
|
 
| Spoke to operator Tony on site. The landowner has requested that completion of reclamation on injection well site and burial of injection line be done after wheat is removed from field this year. Drainage tiles in the area of the injection well will also be repaired/replaced at that time. The operator is collecting seismic data in the area for other possible well sites. Injection pressure was approximately 300 psi and annulus pressure was approximately 800 psi.
 
|
 
|
 
|
 
|-
 
|-
 
| -7167099
 
| 2007-08-06
 
|
 
| Pressure on annulus side 340 psi and 0 psi on injection. New gauges on well.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1108506723
 
| 1108506723
 
| 2005-02-15
 
| 2005-02-15
|
+
|  
 
| Received call from John Powell of Aurora Energy. Drill rig and equipment moved into site today. Checked pit for liner. Liner appears to be in pit. Pit was filled with water. Site very muddy.
 
| Received call from John Powell of Aurora Energy. Drill rig and equipment moved into site today. Checked pit for liner. Liner appears to be in pit. Pit was filled with water. Site very muddy.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1109780347
 
| 1109780347
 
| 2005-03-02
 
| 2005-03-02
|
+
|  
 
| Spoke to John Powell of Bigard & Huggard Drilling at site. Well has been drilled to final depth and logging is being done. Picked up samples of drill cuttings for Geological Survey. Cementing of 5 1/2 inch pipe will probably occur sometime after midnight. Gave John phone numbers for Jeff Fry for contact since inspector will not be available for cementing. John will fax cement tickets for 9 5/8 inch pipe and 5 1/2 inch pipe to Bellefontaine office next week when he returns to office.
 
| Spoke to John Powell of Bigard & Huggard Drilling at site. Well has been drilled to final depth and logging is being done. Picked up samples of drill cuttings for Geological Survey. Cementing of 5 1/2 inch pipe will probably occur sometime after midnight. Gave John phone numbers for Jeff Fry for contact since inspector will not be available for cementing. John will fax cement tickets for 9 5/8 inch pipe and 5 1/2 inch pipe to Bellefontaine office next week when he returns to office.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1118940327
 
| 1118940327
 
| 2005-06-16
 
| 2005-06-16
|
+
|  
 
| Observed tubing and packer before being placed in hole for completion of injection well. Packer was Baker Lockset. There were 94 joints of new 2 3/8 inch tubing used for the construction. Packer was set at depth 2957, bottom of 5 1/2 inch casing was depth 3020 and top of Mt. Simon injection formation was depth 3046 according to drilling records. Allowable injection pressure is 940 psi. There were 60 barrels of rust inhibitor brine water pumped into the annular space between the 2 3/8 and 5 1/2 pipes. Pressure test at 1020 psi was held for 15 minutes with no noticeable loss of pressure. A 6 foot diameter culvert with a cement bottom was placed around the well, below ground level. The culvert was filled with gravel and a pipe inserted in the gravel. This is for containment and removal of any potential spill.
 
| Observed tubing and packer before being placed in hole for completion of injection well. Packer was Baker Lockset. There were 94 joints of new 2 3/8 inch tubing used for the construction. Packer was set at depth 2957, bottom of 5 1/2 inch casing was depth 3020 and top of Mt. Simon injection formation was depth 3046 according to drilling records. Allowable injection pressure is 940 psi. There were 60 barrels of rust inhibitor brine water pumped into the annular space between the 2 3/8 and 5 1/2 pipes. Pressure test at 1020 psi was held for 15 minutes with no noticeable loss of pressure. A 6 foot diameter culvert with a cement bottom was placed around the well, below ground level. The culvert was filled with gravel and a pipe inserted in the gravel. This is for containment and removal of any potential spill.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1131547308
 
| 1131547308
 
| 2005-11-08
 
| 2005-11-08
|
+
|  
 
| Spoke to operator Tony on site. The pit for the injection well has been pumped dry and the water disposed in the injection well. The pit will be backfilled Friday and topsoil replaced. It has not yet been determined when the surface line to the injection well will be buried. If the line is to remain exposed over the winter, a pressure test of the line must be done with the inspector present. When the injection line is buried, a pressure test of the line must be done with the inspector present.
 
| Spoke to operator Tony on site. The pit for the injection well has been pumped dry and the water disposed in the injection well. The pit will be backfilled Friday and topsoil replaced. It has not yet been determined when the surface line to the injection well will be buried. If the line is to remain exposed over the winter, a pressure test of the line must be done with the inspector present. When the injection line is buried, a pressure test of the line must be done with the inspector present.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1132762597
 
| 1132762597
 
| 2005-11-21
 
| 2005-11-21
|
+
|  
|     Pit for construction of injection well has been backfilled. Material used to fill pit is approximately 2 feet above existing ground which will allow for settling of material. Since the spud date for the well was 2/17/05, the operator should have completed the restoration of the well site by now in accordance with 1509.072 which allows 9 months for the grading, resoiling and seeding of the site which was disturbed and is not required for the production of the well. Since November is not an appropriate time to resoil/reseed the site and the area is used for agriculultural production, the operator will be given additional time to grade and resoil the site, but it must be completed before planting in the spring of 2006.
+
| Pit for construction of injection well has been backfilled. Material used to fill pit is approximately 2 feet above existing ground which will allow for settling of material. Since the spud date for the well was 2/17/05, the operator should have completed the restoration of the well site by now in accordance with 1509.072 which allows 9 months for the grading, resoiling and seeding of the site which was disturbed and is not required for the production of the well. Since November is not an appropriate time to resoil/reseed the site and the area is used for agriculultural production, the operator will be given additional time to grade and resoil the site, but it must be completed before planting in the spring of 2006.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1135704234
 
| 1135704234
 
| 2005-12-27
 
| 2005-12-27
|
+
|  
 
| Sign posted at well site. Injection line to well has not yet been buried. Remind operator that the line must be pressure tested in presence of state inspector when buried. Backfill in pit appears to be same as before. Injection pressure was 0 while annulus was near 900 psi.
 
| Sign posted at well site. Injection line to well has not yet been buried. Remind operator that the line must be pressure tested in presence of state inspector when buried. Backfill in pit appears to be same as before. Injection pressure was 0 while annulus was near 900 psi.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1145839355
 
| 1145839355
 
| 2006-08-14
 
| 2006-08-14
|
+
|  
 
| No injection pressure on the well. Annulus pressure is approximately 1000 psi. The operator indicated that reclamation of the site would be done when the wheat was removed from the field. Wheat is now gone. Areas around well need grading to remove high areas and fill low areas. Site then needs to be properly revegetated. The pipeline from the plant to the injection well also is supposed to be buried and the line pressure tested. Request operator contact inspector at 419-599-0058 to discuss proper reclamation of site.
 
| No injection pressure on the well. Annulus pressure is approximately 1000 psi. The operator indicated that reclamation of the site would be done when the wheat was removed from the field. Wheat is now gone. Areas around well need grading to remove high areas and fill low areas. Site then needs to be properly revegetated. The pipeline from the plant to the injection well also is supposed to be buried and the line pressure tested. Request operator contact inspector at 419-599-0058 to discuss proper reclamation of site.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1166729715
 
| 1166729715
 
| 2006-12-21
 
| 2006-12-21
|
+
|  
 
| Injection well was not accepting fluid. Tubing pulled and found that lower joint was plugged with sediment. New joint replaced obstructed one. Well was circulated to remove additional sediment. Thought that sediment came from storage tanks. A new Lockset 2 3/8 x  5 1/2 inch packer was returned to the previously set depth of 2957 feet. Sixty barrels of water with 8 gallons of rust inhibitor were mixed to fill the annular space. Annular space was pressured to 1100 psi for 15 minutes with no loss of pressure.
 
| Injection well was not accepting fluid. Tubing pulled and found that lower joint was plugged with sediment. New joint replaced obstructed one. Well was circulated to remove additional sediment. Thought that sediment came from storage tanks. A new Lockset 2 3/8 x  5 1/2 inch packer was returned to the previously set depth of 2957 feet. Sixty barrels of water with 8 gallons of rust inhibitor were mixed to fill the annular space. Annular space was pressured to 1100 psi for 15 minutes with no loss of pressure.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1175190456
 
| 1175190456
 
| 2007-03-29
 
| 2007-03-29
|
+
|  
 
| Checked injection well. The was no pressure on the annulus side.  The gauge on the injection side was broken and could not be removed. Gauge must be replaced. Pressure must be kept on injection or annulus side or else monthly test must be done to a minimum of 200 psi for 15 minutes with less than 5 % loss in pressure. Information must be recorded and submitted to the State. Also there is no ID posted at the well. ID must be posted immediately. Since wells recently changed ownership, new signs are probably needed at production wells and tank battery. Called Tony Kreider and left message to call inspector.
 
| Checked injection well. The was no pressure on the annulus side.  The gauge on the injection side was broken and could not be removed. Gauge must be replaced. Pressure must be kept on injection or annulus side or else monthly test must be done to a minimum of 200 psi for 15 minutes with less than 5 % loss in pressure. Information must be recorded and submitted to the State. Also there is no ID posted at the well. ID must be posted immediately. Since wells recently changed ownership, new signs are probably needed at production wells and tank battery. Called Tony Kreider and left message to call inspector.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1202249937
 
| 1202249937
 
| 2008-02-05
 
| 2008-02-05
|
+
|  
 
| New sign not yet posted at well. No injection pressure on well with 475 psi annulus pressure.
 
| New sign not yet posted at well. No injection pressure on well with 475 psi annulus pressure.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1211378488
 
| 1211378488
 
| 2008-05-19
 
| 2008-05-19
|
+
|  
 
| Spoke to operator Tony by phone. Company name on sign needs to be changed, phone number and other information is still valid. Gas plant is shut down at this time. Annulus pressure 480 psi, injection pressure 0.
 
| Spoke to operator Tony by phone. Company name on sign needs to be changed, phone number and other information is still valid. Gas plant is shut down at this time. Annulus pressure 480 psi, injection pressure 0.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1218563068
 
| 1218563068
 
| 2008-08-12
 
| 2008-08-12
|
+
|  
|     Annulus pressure 490 psi and 0 psi injection pressure. Gas plant in no longer in operation.
+
| Annulus pressure 490 psi and 0 psi injection pressure. Gas plant in no longer in operation.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1227650614
 
| 1227650614
 
| 2008-11-25
 
| 2008-11-25
|
+
|  
 
| Checked well. Annulus pressure is 480 psi and no injection pressure. Gas plant not in operation at this time.
 
| Checked well. Annulus pressure is 480 psi and no injection pressure. Gas plant not in operation at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1247174143
 
| 1247174143
 
| 2009-07-09
 
| 2009-07-09
|
+
|  
 
| Sign posted at well. No injection pressure but annulus pressure at 490 psi. It does not appear as though the gas plant is in operation at this time.
 
| Sign posted at well. No injection pressure but annulus pressure at 490 psi. It does not appear as though the gas plant is in operation at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1254123570
 
| 1254123570
 
| 2012-12-13
 
| 2012-12-13
|
+
|  
 
| At the time of my inspection the well was shut in and no Flow Meter was set up on the well. There was 310 psi on the annulus and 0 psi on the injection tubing. There was also no identification posted at the well.
 
| At the time of my inspection the well was shut in and no Flow Meter was set up on the well. There was 310 psi on the annulus and 0 psi on the injection tubing. There was also no identification posted at the well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1255008191
 
| 1255008191
 
| 2009-10-07
 
| 2009-10-07
|
+
|  
 
| No activity on site. No injection pressure on well. Annular pressure at 480 psi.
 
| No activity on site. No injection pressure on well. Annular pressure at 480 psi.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1282232469
 
| 1282232469
 
| 2010-08-19
 
| 2010-08-19
|
+
|  
 
| Check well and storage, ok.
 
| Check well and storage, ok.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1303668072
 +
| 2014-10-08
 +
|
 +
| Inspect well for integrity and pressure.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1304788773
 +
| 2011-06-28
 +
|
 +
| Inspect well and tanks. Three tanks in dike area. One tank has fluid, one tank has manway open, one tank the base of tank is heavily rusted. Hole in liner next to tanks. Failure to maintain integrity of liner  Station idle during inspection. No identifica
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1319855750
 
| 1319855750
 
| 2011-03-30
 
| 2011-03-30
|
+
|  
 
| Check well and storage, Ok.
 
| Check well and storage, Ok.
 
The well is shut in and not in use at this time.
 
The well is shut in and not in use at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1328547179
 
| 1328547179
 
| 2012-01-04
 
| 2012-01-04
|
+
|  
 
| At the time of my inspection the identification needed posted at the wellhead. This well was transferred to Second Oil Co. and new signs are being ordered.
 
| At the time of my inspection the identification needed posted at the wellhead. This well was transferred to Second Oil Co. and new signs are being ordered.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1377790676
 
| 1377790676
 
| 2013-08-28
 
| 2013-08-28
|
+
|  
 
| Contacted by current operator to report the line has been repaired and Inspected location to verify that the line has been repaired. Corrective action has been resolved and released.
 
| Contacted by current operator to report the line has been repaired and Inspected location to verify that the line has been repaired. Corrective action has been resolved and released.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1397566034
 
| 1397566034
 
| 2014-04-14
 
| 2014-04-14
|
+
|  
 
| Inspect well for annulus and injection pressure. Well is shut in.
 
| Inspect well for annulus and injection pressure. Well is shut in.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1421958810
 +
| 2015-01-21
 +
|
 +
| Inspect well for integrity and pressure.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1442124951
 
| 1442124951
 
| 2005-08-04
 
| 2005-08-04
|
+
|  
 
| Inspection with Jeff Fry. New injection well is in operation. Noted injection pressure 340psi and annulus pressure 960 psi. Permit requires that line from plant facility to injection well be pressure tested and witnessed by ODNR inspector. Request operator to contact inspector for test ASAP. Identification sign must also be posted at wellhead showing required information. This should also be done ASAP.
 
| Inspection with Jeff Fry. New injection well is in operation. Noted injection pressure 340psi and annulus pressure 960 psi. Permit requires that line from plant facility to injection well be pressure tested and witnessed by ODNR inspector. Request operator to contact inspector for test ASAP. Identification sign must also be posted at wellhead showing required information. This should also be done ASAP.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 151314723
 
| 151314723
 
| 2005-09-12
 
| 2005-09-12
|
+
|  
|     Sign is posted at wellhead as requested. Spoke to operator about pressure test of temporary pipeline. Since this line is on the ground surface, it will not need to be tested since it will be replaced with a permanent buried line when the crops are removed. The permanent line must be pressure tested with the ODNR inspector present before put into operation. Also remind operator that the pit and other disturbed areas around the wellhead need to be reclaimed.
+
| Sign is posted at wellhead as requested. Spoke to operator about pressure test of temporary pipeline. Since this line is on the ground surface, it will not need to be tested since it will be replaced with a permanent buried line when the crops are removed. The permanent line must be pressure tested with the ODNR inspector present before put into operation. Also remind operator that the pit and other disturbed areas around the wellhead need to be reclaimed.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1548205302
 +
| 2006-06-01
 +
|
 +
| There was no injection pressure on the well. There was pressure on the annulus side but the gauge was not reading correctly. Could not removed gauge to check pressure. Left note at office to replace gauge. Remind operator that restoration of the injection well site must be completed after wheat is removed from field. There is grading that needs to be done to level high areas and fill low areas holding water. Topsoil should be replaced. As previously indicated by the operator, the injection line from the plant to the well would also be buried at that time. The injection line must be pressure tested with the inspector on site before operation. Please contact me at 419-599-0058 to arrange for the test.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1619864517
 
| 1619864517
 
| 2014-07-02
 
| 2014-07-02
|
+
|  
 
| Inspect well for integrity and pressure. Well is shut in.
 
| Inspect well for integrity and pressure. Well is shut in.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1633056480
 
| 1633056480
 
| 2013-11-06
 
| 2013-11-06
|
+
|  
 
| Inspect well for integrity and pressure. Shut in.
 
| Inspect well for integrity and pressure. Shut in.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1751162857
 
| 1751162857
 
| 2012-02-09
 
| 2012-02-09
|
+
|  
 
| Inspect Well. Well shut in.
 
| Inspect Well. Well shut in.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1862591780
 
| 1862591780
 
| 2011-10-04
 
| 2011-10-04
|
+
|  
 
| Inspect well. Company has not contacted inspector regarding previous NOV.
 
| Inspect well. Company has not contacted inspector regarding previous NOV.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1897358057
 +
| 2013-04-03
 +
|
 +
| At the time of the inspection the well was shut in.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1918248227
 +
| 2012-06-12
 +
|
 +
| Inspect Well. Well is Shut in.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1986763270
 +
| 2010-11-17
 +
|
 +
| Check well and storage.
 +
Liner in diked area is in good condition at this time, has some fresh water in it.
 +
Identification posted at the well head.
 +
Pit cuttings from drilling operations stock piled on the site by the well head.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -2020481586
 +
| 2009-03-26
 +
|
 +
| Checked well. ID sign posted. Annulus pressure 480 psi and injection pressure 0. The gas plant is not in operation at this time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 267564587
 
| 267564587
 
| 2010-03-04
 
| 2010-03-04
|
+
|  
 
| No activity on site. Annulus pressure 480 psi with 0 injection pressure.
 
| No activity on site. Annulus pressure 480 psi with 0 injection pressure.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -302241433
 +
| 2006-03-20
 +
|
 +
| Spoke to operator Tony on site. The landowner has requested that completion of reclamation on injection well site and burial of injection line be done after wheat is removed from field this year. Drainage tiles in the area of the injection well will also be repaired/replaced at that time. The operator is collecting seismic data in the area for other possible well sites. Injection pressure was approximately 300 psi and annulus pressure was approximately 800 psi.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 664103645
 
| 664103645
 
| 2012-09-19
 
| 2012-09-19
|
+
|  
 
| At the time of my inspection the well was shut in and not in operation. There was no power to the meter so no meter reading was available.
 
| At the time of my inspection the well was shut in and not in operation. There was no power to the meter so no meter reading was available.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 688040955
 +
| 2015-04-14
 +
|
 +
| Inspect well for integrity and pressure.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -7167099
 +
| 2007-08-06
 +
|
 +
| Pressure on annulus side 340 psi and 0 psi on injection. New gauges on well.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 832437728
 
| 832437728
 
| 2014-01-15
 
| 2014-01-15
|
+
|  
 
| Inspect well for integrity and pressure. Well is shut in.
 
| Inspect well for integrity and pressure. Well is shut in.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 05:05, 16 July 2015

Well Details

Well ID: 34-069-20139
Loading map...
County: Henry
Municipality:
Operator Name: SECOND OIL LTD
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2005-02-17
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 41.32837915
Longitude: -83.95939686

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1078522987 2013-07-17 Inspect well for integrity and pressure. Well is shut in.
1108506723 2005-02-15 Received call from John Powell of Aurora Energy. Drill rig and equipment moved into site today. Checked pit for liner. Liner appears to be in pit. Pit was filled with water. Site very muddy.
1109780347 2005-03-02 Spoke to John Powell of Bigard & Huggard Drilling at site. Well has been drilled to final depth and logging is being done. Picked up samples of drill cuttings for Geological Survey. Cementing of 5 1/2 inch pipe will probably occur sometime after midnight. Gave John phone numbers for Jeff Fry for contact since inspector will not be available for cementing. John will fax cement tickets for 9 5/8 inch pipe and 5 1/2 inch pipe to Bellefontaine office next week when he returns to office.
1118940327 2005-06-16 Observed tubing and packer before being placed in hole for completion of injection well. Packer was Baker Lockset. There were 94 joints of new 2 3/8 inch tubing used for the construction. Packer was set at depth 2957, bottom of 5 1/2 inch casing was depth 3020 and top of Mt. Simon injection formation was depth 3046 according to drilling records. Allowable injection pressure is 940 psi. There were 60 barrels of rust inhibitor brine water pumped into the annular space between the 2 3/8 and 5 1/2 pipes. Pressure test at 1020 psi was held for 15 minutes with no noticeable loss of pressure. A 6 foot diameter culvert with a cement bottom was placed around the well, below ground level. The culvert was filled with gravel and a pipe inserted in the gravel. This is for containment and removal of any potential spill.
1131547308 2005-11-08 Spoke to operator Tony on site. The pit for the injection well has been pumped dry and the water disposed in the injection well. The pit will be backfilled Friday and topsoil replaced. It has not yet been determined when the surface line to the injection well will be buried. If the line is to remain exposed over the winter, a pressure test of the line must be done with the inspector present. When the injection line is buried, a pressure test of the line must be done with the inspector present.
1132762597 2005-11-21 Pit for construction of injection well has been backfilled. Material used to fill pit is approximately 2 feet above existing ground which will allow for settling of material. Since the spud date for the well was 2/17/05, the operator should have completed the restoration of the well site by now in accordance with 1509.072 which allows 9 months for the grading, resoiling and seeding of the site which was disturbed and is not required for the production of the well. Since November is not an appropriate time to resoil/reseed the site and the area is used for agriculultural production, the operator will be given additional time to grade and resoil the site, but it must be completed before planting in the spring of 2006.
1135704234 2005-12-27 Sign posted at well site. Injection line to well has not yet been buried. Remind operator that the line must be pressure tested in presence of state inspector when buried. Backfill in pit appears to be same as before. Injection pressure was 0 while annulus was near 900 psi.
1145839355 2006-08-14 No injection pressure on the well. Annulus pressure is approximately 1000 psi. The operator indicated that reclamation of the site would be done when the wheat was removed from the field. Wheat is now gone. Areas around well need grading to remove high areas and fill low areas. Site then needs to be properly revegetated. The pipeline from the plant to the injection well also is supposed to be buried and the line pressure tested. Request operator contact inspector at 419-599-0058 to discuss proper reclamation of site.
1166729715 2006-12-21 Injection well was not accepting fluid. Tubing pulled and found that lower joint was plugged with sediment. New joint replaced obstructed one. Well was circulated to remove additional sediment. Thought that sediment came from storage tanks. A new Lockset 2 3/8 x 5 1/2 inch packer was returned to the previously set depth of 2957 feet. Sixty barrels of water with 8 gallons of rust inhibitor were mixed to fill the annular space. Annular space was pressured to 1100 psi for 15 minutes with no loss of pressure.
1175190456 2007-03-29 Checked injection well. The was no pressure on the annulus side. The gauge on the injection side was broken and could not be removed. Gauge must be replaced. Pressure must be kept on injection or annulus side or else monthly test must be done to a minimum of 200 psi for 15 minutes with less than 5 % loss in pressure. Information must be recorded and submitted to the State. Also there is no ID posted at the well. ID must be posted immediately. Since wells recently changed ownership, new signs are probably needed at production wells and tank battery. Called Tony Kreider and left message to call inspector.
1202249937 2008-02-05 New sign not yet posted at well. No injection pressure on well with 475 psi annulus pressure.
1211378488 2008-05-19 Spoke to operator Tony by phone. Company name on sign needs to be changed, phone number and other information is still valid. Gas plant is shut down at this time. Annulus pressure 480 psi, injection pressure 0.
1218563068 2008-08-12 Annulus pressure 490 psi and 0 psi injection pressure. Gas plant in no longer in operation.
1227650614 2008-11-25 Checked well. Annulus pressure is 480 psi and no injection pressure. Gas plant not in operation at this time.
1247174143 2009-07-09 Sign posted at well. No injection pressure but annulus pressure at 490 psi. It does not appear as though the gas plant is in operation at this time.
1254123570 2012-12-13 At the time of my inspection the well was shut in and no Flow Meter was set up on the well. There was 310 psi on the annulus and 0 psi on the injection tubing. There was also no identification posted at the well.
1255008191 2009-10-07 No activity on site. No injection pressure on well. Annular pressure at 480 psi.
1282232469 2010-08-19 Check well and storage, ok.
-1303668072 2014-10-08 Inspect well for integrity and pressure.
-1304788773 2011-06-28 Inspect well and tanks. Three tanks in dike area. One tank has fluid, one tank has manway open, one tank the base of tank is heavily rusted. Hole in liner next to tanks. Failure to maintain integrity of liner Station idle during inspection. No identifica
1319855750 2011-03-30 Check well and storage, Ok.

The well is shut in and not in use at this time.

1328547179 2012-01-04 At the time of my inspection the identification needed posted at the wellhead. This well was transferred to Second Oil Co. and new signs are being ordered.
1377790676 2013-08-28 Contacted by current operator to report the line has been repaired and Inspected location to verify that the line has been repaired. Corrective action has been resolved and released.
1397566034 2014-04-14 Inspect well for annulus and injection pressure. Well is shut in.
1421958810 2015-01-21 Inspect well for integrity and pressure.
1442124951 2005-08-04 Inspection with Jeff Fry. New injection well is in operation. Noted injection pressure 340psi and annulus pressure 960 psi. Permit requires that line from plant facility to injection well be pressure tested and witnessed by ODNR inspector. Request operator to contact inspector for test ASAP. Identification sign must also be posted at wellhead showing required information. This should also be done ASAP.
151314723 2005-09-12 Sign is posted at wellhead as requested. Spoke to operator about pressure test of temporary pipeline. Since this line is on the ground surface, it will not need to be tested since it will be replaced with a permanent buried line when the crops are removed. The permanent line must be pressure tested with the ODNR inspector present before put into operation. Also remind operator that the pit and other disturbed areas around the wellhead need to be reclaimed.
-1548205302 2006-06-01 There was no injection pressure on the well. There was pressure on the annulus side but the gauge was not reading correctly. Could not removed gauge to check pressure. Left note at office to replace gauge. Remind operator that restoration of the injection well site must be completed after wheat is removed from field. There is grading that needs to be done to level high areas and fill low areas holding water. Topsoil should be replaced. As previously indicated by the operator, the injection line from the plant to the well would also be buried at that time. The injection line must be pressure tested with the inspector on site before operation. Please contact me at 419-599-0058 to arrange for the test.
1619864517 2014-07-02 Inspect well for integrity and pressure. Well is shut in.
1633056480 2013-11-06 Inspect well for integrity and pressure. Shut in.
1751162857 2012-02-09 Inspect Well. Well shut in.
1862591780 2011-10-04 Inspect well. Company has not contacted inspector regarding previous NOV.
-1897358057 2013-04-03 At the time of the inspection the well was shut in.
-1918248227 2012-06-12 Inspect Well. Well is Shut in.
-1986763270 2010-11-17 Check well and storage.

Liner in diked area is in good condition at this time, has some fresh water in it. Identification posted at the well head. Pit cuttings from drilling operations stock piled on the site by the well head.

-2020481586 2009-03-26 Checked well. ID sign posted. Annulus pressure 480 psi and injection pressure 0. The gas plant is not in operation at this time.
267564587 2010-03-04 No activity on site. Annulus pressure 480 psi with 0 injection pressure.
-302241433 2006-03-20 Spoke to operator Tony on site. The landowner has requested that completion of reclamation on injection well site and burial of injection line be done after wheat is removed from field this year. Drainage tiles in the area of the injection well will also be repaired/replaced at that time. The operator is collecting seismic data in the area for other possible well sites. Injection pressure was approximately 300 psi and annulus pressure was approximately 800 psi.
664103645 2012-09-19 At the time of my inspection the well was shut in and not in operation. There was no power to the meter so no meter reading was available.
688040955 2015-04-14 Inspect well for integrity and pressure.
-7167099 2007-08-06 Pressure on annulus side 340 psi and 0 psi on injection. New gauges on well.
832437728 2014-01-15 Inspect well for integrity and pressure. Well is shut in.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.