If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-029-21838 | | Well ID: 34-029-21838 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.68523618, -80.91512212 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Columbiana County, Ohio|Columbiana]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-11-27 | | Spud Date: 2013-11-27 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.68523618 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.91512212 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 146372.0 | ||
+ | | style="text-align:right;" | 48.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 1102.0 | ||
+ | | style="text-align:right;" | 48.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 172937.0 | ||
+ | | style="text-align:right;" | 89.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 451.0 | ||
+ | | style="text-align:right;" | 89.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1395752928 | | 1395752928 | ||
| 2014-03-20 | | 2014-03-20 | ||
− | | | + | | |
− | + | | I was at the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1938 | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1396988369 | | 1396988369 | ||
| 2014-03-29 | | 2014-03-29 | ||
− | | | + | | |
− | + | | I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1923 | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 2037373356 | ||
+ | | 2014-12-11 | ||
+ | | | ||
+ | | I was onsite to conduct a preliminary restoration inspection. There are a total of six wells on the pad. Access road entry is on east side of Nature Road NE approximately 1.17 miles south of Merline Road NE. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a padlocked gate at the entrance of the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -532190523 | ||
+ | | 2013-11-29 | ||
+ | | | ||
+ | | I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole for the Pitts 22-14-4 #5. The bit was stuck down due to a mechanical failure, and the rig crew was working to free the bit. A second rig was in the process of drilling the Pitts 22-14-4 #10, and was at 35 | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 783991458 | | 783991458 | ||
| 2013-12-02 | | 2013-12-02 | ||
− | | | + | | |
− | + | | I witnessed the cementing of the conductor casing. Precision Rathole drilled a 30 | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-029-21838 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.68523618,"lon":-80.91512212,"icon":""}]} |
County: Columbiana | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-11-27 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.68523618 | |
Longitude: -80.91512212 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-4 | 146372.0 | 48.0 | 1102.0 | 48.0 | ||
2015-1 | 172937.0 | 89.0 | 451.0 | 89.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1395752928 | 2014-03-20 | I was at the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac 43, drilled a 12.25 diameter hole to 1938 | ||||
1396988369 | 2014-03-29 | I went to the site to witness the cementing of the production casing. The drilling contractor, Nomac 43, drilled an 8.75 diameter hole from beneath the base of the intermediate casing at 1923 | ||||
2037373356 | 2014-12-11 | I was onsite to conduct a preliminary restoration inspection. There are a total of six wells on the pad. Access road entry is on east side of Nature Road NE approximately 1.17 miles south of Merline Road NE. There is a sign board at the entrance featuring the well names, permit numbers and emergency contact information. There is a padlocked gate at the entrance of the access road. The access road is in good repair, and drainage and erosion controls are in place. Ground cover is well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a | ||||
-532190523 | 2013-11-29 | I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole for the Pitts 22-14-4 #5. The bit was stuck down due to a mechanical failure, and the rig crew was working to free the bit. A second rig was in the process of drilling the Pitts 22-14-4 #10, and was at 35 | ||||
783991458 | 2013-12-02 | I witnessed the cementing of the conductor casing. Precision Rathole drilled a 30 |
For data sources see[2]