X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-121-24446"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-121-24446
 
| Well ID: 34-121-24446
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8195147545, -81.3953794119 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.81951475, -81.39537941 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Noble County, Ohio|Noble]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CNX GAS COMPANY LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date: 2013-09-13
+
| Spud Date: 2013-09-15
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.8195147545
+
| Latitude: 39.81951475
 
|-
 
|-
| Longitude: -81.3953794119
+
| Longitude: -81.39537941
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 300125.0
 +
| style="text-align:right;" | 62.0
 +
|
 +
|
 +
| style="text-align:right;" | 17890.0
 +
| style="text-align:right;" | 62.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 138101.0
 +
| style="text-align:right;" | 46.0
 +
|
 +
|
 +
| style="text-align:right;" | 4168.0
 +
| style="text-align:right;" | 46.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 248722.0
 +
| style="text-align:right;" | 64.0
 +
|
 +
|
 +
| style="text-align:right;" | 7109.0
 +
| style="text-align:right;" | 64.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 85:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1063089668
 
| -1063089668
 
| 2014-05-07
 
| 2014-05-07
|
+
|  
 
| My inspection today finds the preliminary restoration requirements have been met.
 
| My inspection today finds the preliminary restoration requirements have been met.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1380566224
 +
| 2013-09-29
 +
|
 +
| My inspection today finds Falcon Drilling drilled 385' of 26 hole.  The rig ran 20 casing to a depth of 335'.  Calfrac cemented the well in place with 608 sks of class A cement.  I witnessed 30 bbl of cement returns to surface.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1538553478
 +
| 2015-02-19
 +
|
 +
| At 8:54 PM I received a telephone call from Greg Evans.  Mr. Evans works for Consol Energy and wanted to report a small 10-15 gallon condensate release off of containment.  The release was a result of a Sunpro water truck transferring fluids on the pad.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2005576013
 +
| 2014-05-07
 +
|
 +
| My inspection today finds the preliminary restoration requirements have been met.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| -2135900896
 
| -2135900896
 
| 2013-11-24
 
| 2013-11-24
|
+
|  
| I am onsite to witness the cementing of the 9.625" casing.  Calfrac cemented the casing in place with 645 sks of 12.0# cement and 308 sks of 15.0# cement.  Eighty bbl of dyed spacer was pumped in front of the cement.  All of the spacer was returned to surface indicating proper cement placement.
+
| I am onsite to witness the cementing of the 9.625 casing.  Calfrac cemented the casing in place with 645 sks of 12.0# cement and 308 sks of 15.0# cement.  Eighty bbl of dyed spacer was pumped in front of the cement.  All of the spacer was returned to surface indicating proper cement placement.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -231199220
 
| -231199220
 
| 2013-11-18
 
| 2013-11-18
|
+
|  
| My inspection today finds the rig reached a total depth of 7308' in the 12.25" section.  The rig is preparing to run 7256' of 9.625" casing.  A small drilling fluid spill was being cleaned.  The volume spilled is less than one bbl.
+
| My inspection today finds the rig reached a total depth of 7308' in the 12.25 section.  The rig is preparing to run 7256' of 9.625 casing.  A small drilling fluid spill was being cleaned.  The volume spilled is less than one bbl.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1380566224
+
| 750377903
| 2013-09-29
+
| 2015-02-20
|
+
|  
| My inspection today finds Falcon Drilling drilled 385' of 26" holeThe rig ran 20" casing to a depth of 335'Calfrac cemented the well in place with 608 sks of class A cement.  I witnessed 30 bbl of cement returns to surface.
+
| My inspection today finds the site of the condensate release has been cleanedNo traces of the release are visibleSix 400 barrel tanks are set in a liquid tight containment and an additional seven 210 barrel brine water tanks are set in a separate containment.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 2005576013
 
| 2014-05-07
 
|
 
| My inspection today finds the preliminary restoration requirements have been met.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 07:15, 16 July 2015

Well Details

Well ID: 34-121-24446
Loading map...
County: Noble
Municipality:
Operator Name: CNX GAS COMPANY LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-15
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.81951475
Longitude: -81.39537941

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-3 300125.0 62.0 17890.0 62.0
2014-4 138101.0 46.0 4168.0 46.0
2015-1 248722.0 64.0 7109.0 64.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1063089668 2014-05-07 My inspection today finds the preliminary restoration requirements have been met.
1380566224 2013-09-29 My inspection today finds Falcon Drilling drilled 385' of 26 hole. The rig ran 20 casing to a depth of 335'. Calfrac cemented the well in place with 608 sks of class A cement. I witnessed 30 bbl of cement returns to surface.
-1538553478 2015-02-19 At 8:54 PM I received a telephone call from Greg Evans. Mr. Evans works for Consol Energy and wanted to report a small 10-15 gallon condensate release off of containment. The release was a result of a Sunpro water truck transferring fluids on the pad.
2005576013 2014-05-07 My inspection today finds the preliminary restoration requirements have been met.
-2135900896 2013-11-24 I am onsite to witness the cementing of the 9.625 casing. Calfrac cemented the casing in place with 645 sks of 12.0# cement and 308 sks of 15.0# cement. Eighty bbl of dyed spacer was pumped in front of the cement. All of the spacer was returned to surface indicating proper cement placement.
-231199220 2013-11-18 My inspection today finds the rig reached a total depth of 7308' in the 12.25 section. The rig is preparing to run 7256' of 9.625 casing. A small drilling fluid spill was being cleaned. The volume spilled is less than one bbl.
750377903 2015-02-20 My inspection today finds the site of the condensate release has been cleaned. No traces of the release are visible. Six 400 barrel tanks are set in a liquid tight containment and an additional seven 210 barrel brine water tanks are set in a separate containment.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.