Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-22928 | | Well ID: 34-153-22928 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.16713769, -81.6290676 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Summit County, Ohio|Summit]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[TRANSCONTINENTAL O & G]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2003-09-10 | | Spud Date: 2003-09-10 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.16713769 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.6290676 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2004-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2005-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2006-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2007-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2008-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2009-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 130: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1052333557 | | -1052333557 | ||
| 2004-11-22 | | 2004-11-22 | ||
− | | | + | | |
| Grading and seeding still needs to completed for preliminary restoration approval. | | Grading and seeding still needs to completed for preliminary restoration approval. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | Compliance Notice |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|- | |- | ||
| 1064237044 | | 1064237044 | ||
| 2003-09-17 | | 2003-09-17 | ||
− | | | + | | |
| Rig still on site. Should reach TD later in the day and moving the next. Pits lined and in good condition. No violations at this time. | | Rig still on site. Should reach TD later in the day and moving the next. Pits lined and in good condition. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1064839466 | | 1064839466 | ||
| 2003-09-23 | | 2003-09-23 | ||
− | | | + | | |
| Status check inspection - rig gone, frac tanks being moved in and pits are being pumped. No violations at this time. | | Status check inspection - rig gone, frac tanks being moved in and pits are being pumped. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1071068984 | | 1071068984 | ||
| 2003-12-03 | | 2003-12-03 | ||
− | | | + | | |
| Status check inspection for preliminary restoration. The pits have been closed, the site has been rough graded and the road has been stoned. Finish grade and seeding will occur as weather permits. The company has until June 2004 to complete PR. | | Status check inspection for preliminary restoration. The pits have been closed, the site has been rough graded and the road has been stoned. Finish grade and seeding will occur as weather permits. The company has until June 2004 to complete PR. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1084797724 | | 1084797724 | ||
| 2004-05-12 | | 2004-05-12 | ||
− | | | + | | |
| Status check inspection - drilling, pits lined, no violations at this time. | | Status check inspection - drilling, pits lined, no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1099327089 | | 1099327089 | ||
| 2004-10-26 | | 2004-10-26 | ||
− | | | + | | |
| Status check inspection. The site needs to be finished graded and seeded for preliminary restoration approval. | | Status check inspection. The site needs to be finished graded and seeded for preliminary restoration approval. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1109625078 | | 1109625078 | ||
| 2005-02-28 | | 2005-02-28 | ||
− | | | + | | |
| There are two issues at this site. 1) Capstar drilling moved in to plug back and redrill this well on April 27, 2004. The drilling pits were closed in the alloted time but the finish grading and seeding has not been completed. The nine month time period expired on January 27, 2005. 2) The two 210 bbl tanks are plumbed together at the top making both tanks production tanks. If they are to remain plumbed together this way, then the separators must be moved 10 feet away. If one 210 is to contain brine only, as the tanks are labeled, the top connection between the tanks must be removed. | | There are two issues at this site. 1) Capstar drilling moved in to plug back and redrill this well on April 27, 2004. The drilling pits were closed in the alloted time but the finish grading and seeding has not been completed. The nine month time period expired on January 27, 2005. 2) The two 210 bbl tanks are plumbed together at the top making both tanks production tanks. If they are to remain plumbed together this way, then the separators must be moved 10 feet away. If one 210 is to contain brine only, as the tanks are labeled, the top connection between the tanks must be removed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1197048902 | | 1197048902 | ||
| 2013-09-06 | | 2013-09-06 | ||
− | | | + | | |
| The well remains disconnected. A surface facility has yet to be constructed. | | The well remains disconnected. A surface facility has yet to be constructed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1218486876 | | 1218486876 | ||
| 2004-05-03 | | 2004-05-03 | ||
− | | | + | | |
| Status check inspection - Capstar Drilling is moving onto the location to redrill the well directionally. No violaitons at this time. | | Status check inspection - Capstar Drilling is moving onto the location to redrill the well directionally. No violaitons at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1245622556 | ||
+ | | 2014-03-28 | ||
+ | | | ||
+ | | The well was shut-in and disconnected. No work has been done on the surface facility construction. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1259939181 | | 1259939181 | ||
| 2009-12-02 | | 2009-12-02 | ||
− | | | + | | |
| The well has produced nothing but brine since it was initially completed, plugged back, redrilled, and recompleted. The pump jack and rods that were on the well have been removed. If the well is not capable of production, it must be plugged and abandoned. | | The well has produced nothing but brine since it was initially completed, plugged back, redrilled, and recompleted. The pump jack and rods that were on the well have been removed. If the well is not capable of production, it must be plugged and abandoned. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1288095007 | | 1288095007 | ||
| 2010-10-18 | | 2010-10-18 | ||
− | | | + | | |
− | | Transcontinental requested and received permission to conduct an injection test to determine if the well can successfully be converted into a saltwater disposal well. The test zone is the Clinton sand using the original perforations. The well is equipped with 2-3/8 | + | | Transcontinental requested and received permission to conduct an injection test to determine if the well can successfully be converted into a saltwater disposal well. The test zone is the Clinton sand using the original perforations. The well is equipped with 2-3/8 tubing inside the 4-1/2 production casing. Producers Services was on site to perform the test. The maximum permitted test pressure is 840 psi. After pumping brine for 90 minutes at a rate of approximately 2.5 bpm with a maximum pressure of 200 psi (friction), Transcontinental decided to cancel the pump test and instead conduct a gravity test since the well was on vacuum. Producers was released and the frac tanks containing brine were plumbed into the wellhead. The test will be concluded on 10/20 or when the 1500 bbl brine is used. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1372863043 | | 1372863043 | ||
| 2013-05-29 | | 2013-05-29 | ||
− | | | + | | |
| Bob Roush and I witnessed the packer installation. | | Bob Roush and I witnessed the packer installation. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1402597568 | ||
+ | | 2010-10-19 | ||
+ | | | ||
+ | | Transcontinental is on the second 24 hours of a 48 hour gravity fed salt water disposal test requested and approved for this Clinton well. Results will be reported tomorrow. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1491550716 | ||
+ | | 2015-03-31 | ||
+ | | | ||
+ | | There are no changes on location since last inspection. The well remains shut-in and disconnected. Surface facility construction has not started. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1571494898 | | 1571494898 | ||
| 2013-03-08 | | 2013-03-08 | ||
− | | | + | | |
| The well was fenced in and disconnected. No attempts have been made to convert the well to enhanced recovery. | | The well was fenced in and disconnected. No attempts have been made to convert the well to enhanced recovery. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1871735845 | | 1871735845 | ||
| 2003-09-12 | | 2003-09-12 | ||
− | | | + | | |
| Drilling out from under surface later in the day. No violations at this time. | | Drilling out from under surface later in the day. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1975350587 | ||
+ | | 2014-09-30 | ||
+ | | | ||
+ | | Injection has not commenced. No action has been taken to construct the surface facility. The well remains shut-in and disconnected. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -31820068 | ||
+ | | 2003-09-10 | ||
+ | | | ||
+ | | Capstar Drilling Rig #1 has moved onto the location and will begin drilling later in the day. The pits have been dug and lined and are in good condition. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -419278130 | ||
+ | | 2004-05-14 | ||
+ | | | ||
+ | | The drilling has been completed and the rig was moving off location. The blow pit was within several inches of capacity. I contacted Cal Marks who indicated that S&H would begin removing water from this pit later today. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 51737922 | | 51737922 | ||
| 2014-05-07 | | 2014-05-07 | ||
− | | | + | | |
| The well was found shut-in and disconnected. There was no progress on the surface facility construction. | | The well was found shut-in and disconnected. There was no progress on the surface facility construction. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -819378006 | ||
+ | | 2005-04-06 | ||
+ | | | ||
+ | | Neither issue has been resolved. The site still needs to be recalimed and the two 210 bbl tanks need to be disconnected from each other at the top. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -976994463 | ||
+ | | 2005-06-20 | ||
+ | | | ||
+ | | The site has been graded, seeded and mulched. The tank plumbing issue has not changed but apparently is being allowed by Columbus. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-153-22928 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.16713769,"lon":-81.6290676,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: TRANSCONTINENTAL O & G | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2003-09-10 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.16713769 | |
Longitude: -81.6290676 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2004-0 | 0.0 | 0.0 | ||||
2005-0 | 0.0 | 0.0 | ||||
2006-0 | 0.0 | 0.0 | ||||
2007-0 | 0.0 | 0.0 | ||||
2008-0 | 0.0 | 0.0 | ||||
2009-0 | 0.0 | 0.0 | ||||
2010-0 | 0.0 | 0.0 | ||||
2011-0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1052333557 | 2004-11-22 | Grading and seeding still needs to completed for preliminary restoration approval. | Compliance Notice | |||
1064237044 | 2003-09-17 | Rig still on site. Should reach TD later in the day and moving the next. Pits lined and in good condition. No violations at this time. | ||||
1064839466 | 2003-09-23 | Status check inspection - rig gone, frac tanks being moved in and pits are being pumped. No violations at this time. | ||||
1071068984 | 2003-12-03 | Status check inspection for preliminary restoration. The pits have been closed, the site has been rough graded and the road has been stoned. Finish grade and seeding will occur as weather permits. The company has until June 2004 to complete PR. | ||||
1084797724 | 2004-05-12 | Status check inspection - drilling, pits lined, no violations at this time. | ||||
1099327089 | 2004-10-26 | Status check inspection. The site needs to be finished graded and seeded for preliminary restoration approval. | ||||
1109625078 | 2005-02-28 | There are two issues at this site. 1) Capstar drilling moved in to plug back and redrill this well on April 27, 2004. The drilling pits were closed in the alloted time but the finish grading and seeding has not been completed. The nine month time period expired on January 27, 2005. 2) The two 210 bbl tanks are plumbed together at the top making both tanks production tanks. If they are to remain plumbed together this way, then the separators must be moved 10 feet away. If one 210 is to contain brine only, as the tanks are labeled, the top connection between the tanks must be removed. | ||||
1197048902 | 2013-09-06 | The well remains disconnected. A surface facility has yet to be constructed. | ||||
1218486876 | 2004-05-03 | Status check inspection - Capstar Drilling is moving onto the location to redrill the well directionally. No violaitons at this time. | ||||
-1245622556 | 2014-03-28 | The well was shut-in and disconnected. No work has been done on the surface facility construction. | ||||
1259939181 | 2009-12-02 | The well has produced nothing but brine since it was initially completed, plugged back, redrilled, and recompleted. The pump jack and rods that were on the well have been removed. If the well is not capable of production, it must be plugged and abandoned. | ||||
1288095007 | 2010-10-18 | Transcontinental requested and received permission to conduct an injection test to determine if the well can successfully be converted into a saltwater disposal well. The test zone is the Clinton sand using the original perforations. The well is equipped with 2-3/8 tubing inside the 4-1/2 production casing. Producers Services was on site to perform the test. The maximum permitted test pressure is 840 psi. After pumping brine for 90 minutes at a rate of approximately 2.5 bpm with a maximum pressure of 200 psi (friction), Transcontinental decided to cancel the pump test and instead conduct a gravity test since the well was on vacuum. Producers was released and the frac tanks containing brine were plumbed into the wellhead. The test will be concluded on 10/20 or when the 1500 bbl brine is used. | ||||
1372863043 | 2013-05-29 | Bob Roush and I witnessed the packer installation. | ||||
-1402597568 | 2010-10-19 | Transcontinental is on the second 24 hours of a 48 hour gravity fed salt water disposal test requested and approved for this Clinton well. Results will be reported tomorrow. | ||||
-1491550716 | 2015-03-31 | There are no changes on location since last inspection. The well remains shut-in and disconnected. Surface facility construction has not started. | ||||
1571494898 | 2013-03-08 | The well was fenced in and disconnected. No attempts have been made to convert the well to enhanced recovery. | ||||
1871735845 | 2003-09-12 | Drilling out from under surface later in the day. No violations at this time. | ||||
-1975350587 | 2014-09-30 | Injection has not commenced. No action has been taken to construct the surface facility. The well remains shut-in and disconnected. | ||||
-31820068 | 2003-09-10 | Capstar Drilling Rig #1 has moved onto the location and will begin drilling later in the day. The pits have been dug and lined and are in good condition. | ||||
-419278130 | 2004-05-14 | The drilling has been completed and the rig was moving off location. The blow pit was within several inches of capacity. I contacted Cal Marks who indicated that S&H would begin removing water from this pit later today. | ||||
51737922 | 2014-05-07 | The well was found shut-in and disconnected. There was no progress on the surface facility construction. | ||||
-819378006 | 2005-04-06 | Neither issue has been resolved. The site still needs to be recalimed and the two 210 bbl tanks need to be disconnected from each other at the top. | ||||
-976994463 | 2005-06-20 | The site has been graded, seeded and mulched. The tank plumbing issue has not changed but apparently is being allowed by Columbus. |
For data sources see[2]