Difference between revisions of "34-019-22585"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-22585
 
| Well ID: 34-019-22585
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.68605549, -81.0042805059 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.68605549, -81.00428051 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-05-03
 
| Spud Date: 2014-05-03
 
|-
 
|-
| Unconventional:
+
| Unconventional:  
 
|-
 
|-
| Horizontal:
+
| Configuration:  
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
Line 31: Line 31:
 
| Latitude: 40.68605549
 
| Latitude: 40.68605549
 
|-
 
|-
| Longitude: -81.0042805059
+
| Longitude: -81.00428051
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 164621.0
 +
| style="text-align:right;" | 76.0
 +
|
 +
|
 +
| style="text-align:right;" | 8658.0
 +
| style="text-align:right;" | 76.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 67:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1213648171
 +
| 2014-05-15
 +
|
 +
| I returned to location to witness the 9.625 intermediate casing cement job.  O-Tex cemented 2297' of casing with 179 barrels of Class H cement.  36 barrels of good cement circulated to surface.  No violations.  See casing report for more details on this job.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1228198343
 +
| 2014-05-04
 +
|
 +
| I was on location at 7:54am to witness the cementing of the 20 conductor casing.  Precision Rat Hole augered a 26 hole to 120' measured from ground level and the casing was butt welded and set open ended on bottom.  Allied Cementing rigged up to the casing, established circulation, and mixed and pumped 250 sacks of Class A cement.  The cement was displaced to 110' and 16 barrels of cement circulated to surface.  No violations.  See casing ticket for more details on this job.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1413383215
 +
| 2014-05-13
 +
|
 +
| I was on location at noon to witness the cementing of the 13.375 surface casing.  O-Tex Pumping cemented 755' of surface casing with 148 barrels of Class H cement and 27 barrels of slurry circulated to surface.  The plug did not land after pumping 3 barrels over displacement (113bbls total) and the floats held.  The casing was pressure tested at 1000psi prior to drilling out the shoe track and satifies OAC 1501:9-1-08(D)3(b).  No violations.  See casing ticket for more details on this job.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1415127412
 +
| 2014-05-22
 +
|
 +
| I was on location to check the drilling status of Nomac Rig #73.  They were currently drilling the horizontal leg of the well at a measured depth of 14,594' with synthetic-oil based mud (SOBM).  The site is in good condition, all equipment is on containment, and all fluids are circulating/contained in steel tanks.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1448549899
 +
| 2014-05-15
 +
|
 +
| I was on location for the 9.625 intermediate casing cement job.  Wyoming Casing was currently running pipe.  I inspected the casing and it was new, 40lb/ft., grade J-55.  Nomac Rig #73 had drilled a 12.25 hole to a depth of 2310'.  I left location to inspect Nomac Rig #72  at the Saltsman #10H and will return shortly.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1919273790
 +
| 2014-05-27
 +
|
 +
| Location status check.  Nomac Rig #73 moved to the Heston Pad over the weekend.  This location is in good condition and the wellheads are secure.  Great Plains is removing the rig mats from location.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -712407377
 +
| 2014-06-05
 +
|
 +
| Location status check.  All equipment has been moved from location.  All wells are gated and secured.  The 8H & 3H are shut-in and this well and the 1H, 5H, & 10H have yet to be completed.  The tank battery is diked and contains 6-400 barrel tanks.  There is one vertical separator, 2 gas production units (GPUs), and one vapor recovery unit (VRU) on location.  The location is in good condition, all ID's are posted at the entrance, and both gates at the entrance were properly locked.  No violations.
 +
|
 +
|
 +
|
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 12:15, 16 July 2015

Well Details

Well ID: 34-019-22585
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-05-03
Unconventional:
Configuration:
Well Status: Producing
Violations: 0
Latitude: 40.68605549
Longitude: -81.00428051

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2015-1 164621.0 76.0 8658.0 76.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1213648171 2014-05-15 I returned to location to witness the 9.625 intermediate casing cement job. O-Tex cemented 2297' of casing with 179 barrels of Class H cement. 36 barrels of good cement circulated to surface. No violations. See casing report for more details on this job.
-1228198343 2014-05-04 I was on location at 7:54am to witness the cementing of the 20 conductor casing. Precision Rat Hole augered a 26 hole to 120' measured from ground level and the casing was butt welded and set open ended on bottom. Allied Cementing rigged up to the casing, established circulation, and mixed and pumped 250 sacks of Class A cement. The cement was displaced to 110' and 16 barrels of cement circulated to surface. No violations. See casing ticket for more details on this job.
1413383215 2014-05-13 I was on location at noon to witness the cementing of the 13.375 surface casing. O-Tex Pumping cemented 755' of surface casing with 148 barrels of Class H cement and 27 barrels of slurry circulated to surface. The plug did not land after pumping 3 barrels over displacement (113bbls total) and the floats held. The casing was pressure tested at 1000psi prior to drilling out the shoe track and satifies OAC 1501:9-1-08(D)3(b). No violations. See casing ticket for more details on this job.
1415127412 2014-05-22 I was on location to check the drilling status of Nomac Rig #73. They were currently drilling the horizontal leg of the well at a measured depth of 14,594' with synthetic-oil based mud (SOBM). The site is in good condition, all equipment is on containment, and all fluids are circulating/contained in steel tanks. No violations.
-1448549899 2014-05-15 I was on location for the 9.625 intermediate casing cement job. Wyoming Casing was currently running pipe. I inspected the casing and it was new, 40lb/ft., grade J-55. Nomac Rig #73 had drilled a 12.25 hole to a depth of 2310'. I left location to inspect Nomac Rig #72 at the Saltsman #10H and will return shortly. No violations.
-1919273790 2014-05-27 Location status check. Nomac Rig #73 moved to the Heston Pad over the weekend. This location is in good condition and the wellheads are secure. Great Plains is removing the rig mats from location. No violations.
-712407377 2014-06-05 Location status check. All equipment has been moved from location. All wells are gated and secured. The 8H & 3H are shut-in and this well and the 1H, 5H, & 10H have yet to be completed. The tank battery is diked and contains 6-400 barrel tanks. There is one vertical separator, 2 gas production units (GPUs), and one vapor recovery unit (VRU) on location. The location is in good condition, all ID's are posted at the entrance, and both gates at the entrance were properly locked. No violations.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.