If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-22966 | | Well ID: 34-153-22966 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01940096, -81.55992442 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Summit County, Ohio|Summit]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CARGILL INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2006-08-03 | | Spud Date: 2006-08-03 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.01940096 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.55992442 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1038162884 | | -1038162884 | ||
| 2010-08-03 | | 2010-08-03 | ||
− | | | + | | |
| Annual inspection of this solution mining well found no violations at this time. | | Annual inspection of this solution mining well found no violations at this time. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1179777310 | | 1179777310 | ||
| 2007-05-16 | | 2007-05-16 | ||
− | | | + | | |
| Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched. | | Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1185915710 | | 1185915710 | ||
| 2007-07-25 | | 2007-07-25 | ||
− | | | + | | |
| Preliminary restoration is approved. | | Preliminary restoration is approved. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1319653325 | | 1319653325 | ||
| 2011-10-11 | | 2011-10-11 | ||
− | | | + | | |
− | | This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 | + | | This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 production casing in Akron #73. The reference well was the 7 casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 249.672 psi. The final pressure difference between the test well and the reference well, eight hours later was 249.669 psi. Based on the pressure change from start to finish, the Akron 73 well easily passes this MIT. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1636208938 | ||
+ | | 2007-01-04 | ||
+ | | | ||
+ | | On site to witness grouting of the annular space between the 7 and 10-3/4 casings with class A cement. The cement was spotted using 1 PVC tubing placed between the two casing strings to a depth of approximately 210'. Cement circulated to surface and stayed up. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1775593369 | | 1775593369 | ||
| 2006-08-03 | | 2006-08-03 | ||
− | | | + | | |
| Union Drilling Rig 24 is on site and rigging up. Should spud the well within 24 hours. Using steel pits. | | Union Drilling Rig 24 is on site and rigging up. Should spud the well within 24 hours. Using steel pits. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1844939310 | | 1844939310 | ||
| 2006-12-14 | | 2006-12-14 | ||
− | | | + | | |
− | | Arvilla was on site to drill out the 7 | + | | Arvilla was on site to drill out the 7 production casing. They were using a small mud pump and a power swivel to drill with and were circulating into a half tank. No violations at this time. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1971734864 | | 1971734864 | ||
| 2006-08-10 | | 2006-08-10 | ||
− | | | + | | |
| Union Drilling is drilling ahead. No violations at this time. | | Union Drilling is drilling ahead. No violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -2048176757 | ||
+ | | 2008-12-31 | ||
+ | | | ||
+ | | Annual status check inspection found no violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -343060833 | ||
+ | | 2013-06-24 | ||
+ | | | ||
+ | | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -387801020 | ||
+ | | 2009-06-18 | ||
+ | | | ||
+ | | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 548536689 | | 548536689 | ||
| 2006-12-08 | | 2006-12-08 | ||
− | | | + | | |
| Successfully completed a MIT on this well. | | Successfully completed a MIT on this well. | ||
10:28 535 psi | 10:28 535 psi | ||
Line 182: | Line 151: | ||
10:38 535 psi | 10:38 535 psi | ||
10:43 535 psi | 10:43 535 psi | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -549700906 | ||
+ | | 2007-01-08 | ||
+ | | | ||
+ | | On January 4, 2007, the annular space between the 10-3/4 and 7 casing was grouted with 51 sacks of class A cement from 210' to surface. This inspection confirmed that the job was successful and the cement stayed up and was present at the surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 66568027 | ||
+ | | 2014-12-05 | ||
+ | | | ||
+ | | An inspection of the well found no violations at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 719078282 | | 719078282 | ||
| 2006-08-14 | | 2006-08-14 | ||
− | | | + | | |
− | | Union will TD the well later today and should be ready to run and cement the 7 | + | | Union will TD the well later today and should be ready to run and cement the 7 production string tonight. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-153-22966 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01940096,"lon":-81.55992442,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2006-08-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.01940096 | |
Longitude: -81.55992442 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1038162884 | 2010-08-03 | Annual inspection of this solution mining well found no violations at this time. | ||||
1179777310 | 2007-05-16 | Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched. | ||||
1185915710 | 2007-07-25 | Preliminary restoration is approved. | ||||
1319653325 | 2011-10-11 | This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 production casing in Akron #73. The reference well was the 7 casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 249.672 psi. The final pressure difference between the test well and the reference well, eight hours later was 249.669 psi. Based on the pressure change from start to finish, the Akron 73 well easily passes this MIT. | ||||
-1636208938 | 2007-01-04 | On site to witness grouting of the annular space between the 7 and 10-3/4 casings with class A cement. The cement was spotted using 1 PVC tubing placed between the two casing strings to a depth of approximately 210'. Cement circulated to surface and stayed up. | ||||
1775593369 | 2006-08-03 | Union Drilling Rig 24 is on site and rigging up. Should spud the well within 24 hours. Using steel pits. | ||||
1844939310 | 2006-12-14 | Arvilla was on site to drill out the 7 production casing. They were using a small mud pump and a power swivel to drill with and were circulating into a half tank. No violations at this time. | ||||
1971734864 | 2006-08-10 | Union Drilling is drilling ahead. No violations at this time. | ||||
-2048176757 | 2008-12-31 | Annual status check inspection found no violations at this time. | ||||
-343060833 | 2013-06-24 | The well was properly identified. My inspection was accompanied by Andrew Adgate. | ||||
-387801020 | 2009-06-18 | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. | ||||
548536689 | 2006-12-08 | Successfully completed a MIT on this well.
10:28 535 psi 10:33 535 psi 10:38 535 psi 10:43 535 psi |
||||
-549700906 | 2007-01-08 | On January 4, 2007, the annular space between the 10-3/4 and 7 casing was grouted with 51 sacks of class A cement from 210' to surface. This inspection confirmed that the job was successful and the cement stayed up and was present at the surface. | ||||
66568027 | 2014-12-05 | An inspection of the well found no violations at the time. | ||||
719078282 | 2006-08-14 | Union will TD the well later today and should be ready to run and cement the 7 production string tonight. |
For data sources see[1]