X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-22587"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-22587
 
| Well ID: 34-019-22587
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.6224595912, -80.905486343 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.62245959, -80.90548634 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Carroll County, Ohio|Carroll]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-05-12
 
| Spud Date: 2014-05-12
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.6224595912
+
| Latitude: 40.62245959
 
|-
 
|-
| Longitude: -80.905486343
+
| Longitude: -80.90548634
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 49478.0
 +
| style="text-align:right;" | 10.0
 +
|
 +
|
 +
| style="text-align:right;" | 12.0
 +
| style="text-align:right;" | 10.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 567808.0
 +
| style="text-align:right;" | 88.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 88.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1048418380
 
| 1048418380
 
| 2014-05-12
 
| 2014-05-12
|
+
|  
 
+
| I witnessed the cementing of the conductor casing.  Precision Rathole drilled a 26 diameter hole to 120
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 421153830
 +
| 2014-06-05
 +
|
 +
| I was on location to check the drilling status of Nomac #72.  They are currently drilling the 8.5 lateral at a measured depth of 11,917'.  They switched to synthetic, oil based mud at a depth of 7,288'.  The location is in good condition and all equipment is on containment.  No violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -845484592
 +
| 2014-05-30
 +
|
 +
| I was on location to witness the 13.375 surface casing cement job.  Wyoming casing was running pipe and could not wash down the pup and landing joint due to fill-up in the hole.  I spoke with the company man and drilling superintendent about where the base of the Big Injun was logged.  The base was at 746' and pulling joint #20 out of the hole would put the bottom of the casing at 786' (40' below the USDW).  I approved cementing the casing at this depth and Schlumberger cemented the casing with 160 barrels of Class A cement slurry.  45 barrels of cement circulated to surface and weighed 15.5lbs/gallon on the pressurized scales.  The plug did not land and the casing was pressure tested prior to drilling the shoe track at 1000psi.  This satisfies OAC 1501:9-1-08(D)(3)(b).  See casing report for more details on this job.  No violations.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:04, 16 July 2015

Well Details

Well ID: 34-019-22587
Loading map...
County: Carroll
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-05-12
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.62245959
Longitude: -80.90548634

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2014-4 49478.0 10.0 12.0 10.0
2015-1 567808.0 88.0 0.0 88.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1048418380 2014-05-12 I witnessed the cementing of the conductor casing. Precision Rathole drilled a 26 diameter hole to 120
421153830 2014-06-05 I was on location to check the drilling status of Nomac #72. They are currently drilling the 8.5 lateral at a measured depth of 11,917'. They switched to synthetic, oil based mud at a depth of 7,288'. The location is in good condition and all equipment is on containment. No violations.
-845484592 2014-05-30 I was on location to witness the 13.375 surface casing cement job. Wyoming casing was running pipe and could not wash down the pup and landing joint due to fill-up in the hole. I spoke with the company man and drilling superintendent about where the base of the Big Injun was logged. The base was at 746' and pulling joint #20 out of the hole would put the bottom of the casing at 786' (40' below the USDW). I approved cementing the casing at this depth and Schlumberger cemented the casing with 160 barrels of Class A cement slurry. 45 barrels of cement circulated to surface and weighed 15.5lbs/gallon on the pressurized scales. The plug did not land and the casing was pressure tested prior to drilling the shoe track at 1000psi. This satisfies OAC 1501:9-1-08(D)(3)(b). See casing report for more details on this job. No violations.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.