X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23026"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23026
 
| Well ID: 34-153-23026
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1536242276, -81.5149007865 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.15362423, -81.51490079 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[M & M ROYALTY LTD]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2007-12-21
 
| Spud Date: 2007-12-21
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.1536242276
+
| Latitude: 41.15362423
 
|-
 
|-
| Longitude: -81.5149007865
+
| Longitude: -81.51490079
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 1853.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 1007.0
 +
|
 +
|-
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 2614.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 730.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 1907.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 490.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 1721.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 463.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 1100.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 793.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 437.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 112.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 121:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1435038273
 
| 2008-05-07
 
|
 
| Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location.
 
|
 
|
 
|
 
|-
 
|-
 
| -1765023430
 
| 2010-02-05
 
|
 
| checked site for tour on Senate Bill 165.
 
|
 
|
 
|
 
|-
 
|-
 
| -1959361201
 
| 2008-09-18
 
|
 
| Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1193687101
 
| 1193687101
 
| 2007-12-17
 
| 2007-12-17
|
+
|  
 
| Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st.
 
| Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1201815388
 
| 1201815388
 
| 2008-01-24
 
| 2008-01-24
|
+
|  
 
| Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits.
 
| Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1312081283
 
| 1312081283
 
| 2008-08-11
 
| 2008-08-11
|
+
|  
 
| I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September.
 
| I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1435038273
 +
| 2008-05-07
 +
|
 +
| Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1483597966
 
| 1483597966
 
| 2008-01-30
 
| 2008-01-30
|
+
|  
 
| The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road.
 
| The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1765023430
 +
| 2010-02-05
 +
|
 +
| checked site for tour on Senate Bill 165.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1959361201
 +
| 2008-09-18
 +
|
 +
| Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 14:48, 16 July 2015

Well Details

Well ID: 34-153-23026
Loading map...
County: Summit
Municipality:
Operator Name: M & M ROYALTY LTD
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-12-21
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.15362423
Longitude: -81.51490079

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 1853.0 1007.0
2009-0 2614.0 730.0
2010-0 1907.0 490.0
2011-0 1721.0 463.0
2012-0 1100.0 0.0
2013-0 793.0 0.0
2014-0 437.0 365.0 112.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1193687101 2007-12-17 Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st.
1201815388 2008-01-24 Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits.
1312081283 2008-08-11 I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September.
-1435038273 2008-05-07 Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location.
1483597966 2008-01-30 The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road.
-1765023430 2010-02-05 checked site for tour on Senate Bill 165.
-1959361201 2008-09-18 Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.