X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0064272703000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0064272703000
 
| Well ID: 0064272703000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.49473400000005086, -113.56058699999999817 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.494734, -113.560587 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-27-006-27W4/0
 
| Location: 00/03-27-006-27W4/0
 +
|-
 +
| Location Alias: 00/03-27-06-27 W4M
 +
|-
 +
| Location Alias 2: 00/03-27-006-27 W4/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Municipal District of Pincher Creek No. 9,_Alberta|Municipal District of Pincher Creek No. 9]]
 
|-
 
|-
 
| Well Name: GASCOME CS ET AL PEIGAN 3-27-6-27
 
| Well Name: GASCOME CS ET AL PEIGAN 3-27-6-27
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0079962
 
|-
 
|-
 
| License Date: 1979-12-18
 
| License Date: 1979-12-18
 
|-
 
|-
| Final Drilling Date: 1980-04-29
+
| License Status: RecExempt
 +
|-
 +
| Spud Date: 1980-01-15
 +
|-
 +
| Final Drill Date: 1980-04-29
 +
|-
 +
| Well Total Depth: 3787 m
 +
|-
 +
| Surface Hole Latitude: 49.494734
 +
|-
 +
| Surface Hole Longitude: -113.560587
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1980-04-29
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3400
 +
| style="text-align: right;" | 3787
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-05-27
 +
| Cement Plug
 +
| style="text-align: right;" | 3550
 +
| style="text-align: right;" | 3773
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-05-27
 +
| Cement Plug
 +
| style="text-align: right;" | 3350
 +
| style="text-align: right;" | 3495
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-05-29
 +
| Perforation
 +
| style="text-align: right;" | 3210
 +
| style="text-align: right;" | 3215
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1980-05-31
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3192
 +
| style="text-align: right;" | 3200
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-06-01
 +
| Perforation
 +
| style="text-align: right;" | 3144
 +
| style="text-align: right;" | 3156
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-06-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3144
 +
| style="text-align: right;" | 3156
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 3787.0m
+
| 1980-06-06
 +
| Perforation
 +
| style="text-align: right;" | 3115
 +
| style="text-align: right;" | 3121
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1980-06-06
 +
| Perforation
 +
| style="text-align: right;" | 3122
 +
| style="text-align: right;" | 3128
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Status: Abandoned
+
| 1980-06-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3110
 +
| style="text-align: right;" | 3114
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1980-06-10
 +
| Perforation
 +
| style="text-align: right;" | 3101
 +
| style="text-align: right;" | 3106
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Configuration: Vertical
+
| 1980-06-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 3101
 +
| style="text-align: right;" | 3106
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 49.49473400000005086
+
| 1980-06-15
 +
| Cement Squeeze
 +
| style="text-align: right;" | 3101
 +
| style="text-align: right;" | 3106
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -113.56058699999999817
+
| 1980-06-17
 +
| Perforation
 +
| style="text-align: right;" | 3085
 +
| style="text-align: right;" | 3089
 +
| style="text-align: right;" | 7
 
|-
 
|-
 +
| 1980-06-18
 +
| Acid Treatment
 +
| style="text-align: right;" | 3085
 +
| style="text-align: right;" | 3089
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-06-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 3075
 +
| style="text-align: right;" | 3083
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-06-23
 +
| Perforation
 +
| style="text-align: right;" | 3040
 +
| style="text-align: right;" | 3047
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-06-23
 +
| Perforation
 +
| style="text-align: right;" | 3051
 +
| style="text-align: right;" | 3062
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-06-23
 +
| Perforation
 +
| style="text-align: right;" | 3066
 +
| style="text-align: right;" | 3071
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-06-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 3040
 +
| style="text-align: right;" | 3071
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-02
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2512
 +
| style="text-align: right;" | 2520
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-03
 +
| Perforation
 +
| style="text-align: right;" | 2489
 +
| style="text-align: right;" | 2491
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-07-03
 +
| Perforation
 +
| style="text-align: right;" | 2492
 +
| style="text-align: right;" | 2494
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-07-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 2489
 +
| style="text-align: right;" | 2494
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1990-05-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2463
 +
| style="text-align: right;" | 2471
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
  
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1980-01-16
 +
| Lost Circulation
 +
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 60.00
 +
|-
 +
| 1980-03-26
 +
| Lost Circulation
 +
| style="text-align: right;" | 3400.00
 +
| style="text-align: right;" | 3400.00
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-05-09
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 00:06, 5 June 2019

Well Details

Well ID: 0064272703000
Loading map...
Location: 00/03-27-006-27W4/0
Location Alias: 00/03-27-06-27 W4M
Location Alias 2: 00/03-27-006-27 W4/00
Province: Alberta
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: GASCOME CS ET AL PEIGAN 3-27-6-27
Operator Name:
License Number: 0079962
License Date: 1979-12-18
License Status: RecExempt
Spud Date: 1980-01-15
Final Drill Date: 1980-04-29
Well Total Depth: 3787 m
Surface Hole Latitude: 49.494734
Surface Hole Longitude: -113.560587

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-29 Open Hole/Barefoot Completion 3400 3787 0
1980-05-27 Cement Plug 3550 3773 0
1980-05-27 Cement Plug 3350 3495 0
1980-05-29 Perforation 3210 3215 13
1980-05-31 Packing Device Capped w/Cement 3192 3200 0
1980-06-01 Perforation 3144 3156 7
1980-06-04 Cement Squeeze 3144 3156 0
1980-06-06 Perforation 3115 3121 7
1980-06-06 Perforation 3122 3128 7
1980-06-09 Packing Device Capped w/Cement 3110 3114 0
1980-06-10 Perforation 3101 3106 7
1980-06-12 Acid Treatment 3101 3106 0
1980-06-15 Cement Squeeze 3101 3106 0
1980-06-17 Perforation 3085 3089 7
1980-06-18 Acid Treatment 3085 3089 0
1980-06-21 Packing Device Capped w/Cement 3075 3083 0
1980-06-23 Perforation 3040 3047 7
1980-06-23 Perforation 3051 3062 7
1980-06-23 Perforation 3066 3071 7
1980-06-25 Acid Treatment 3040 3071 0
1980-07-02 Packing Device Capped w/Cement 2512 2520 0
1980-07-03 Perforation 2489 2491 7
1980-07-03 Perforation 2492 2494 7
1980-07-05 Acid Treatment 2489 2494 0
1990-05-24 Packing Device Capped w/Cement 2463 2471 0

For data sources see[3]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-01-16 Lost Circulation 60.00 60.00
1980-03-26 Lost Circulation 3400.00 3400.00

For data sources see[4]

References