X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-021-21140"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-021-21140
 
| Well ID: 37-021-21140
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.291769, -78.779031 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.291750, -78.779306 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Cambria County, Pennsylvania|Cambria]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Adams Township, Cambria County, Pennsylvania|Adams Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Cambria_County,_Pennsylvania|Cambria]]
 +
|-
 +
| Municipality: [[Adams Township,_Cambria_County,_Pennsylvania|Adams Township]]
 
|-
 
|-
 
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[146827|146827]]
+
| Well Pad ID: [[146827]]
 
|-
 
|-
 
| Farm/Lease Name: WILMORE COAL CO 7
 
| Farm/Lease Name: WILMORE COAL CO 7
 
|-
 
|-
| First Permit Date: 2009-08-05
+
| License Status: Plugged OG Well
|-
 
| Last Permit Date: 2009-08-05
 
|-
 
| Spud Date: 2009-09-29
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 09/29/2009
 
|-
 
|-
| Horizontal: No
+
| Permit Date: 8/5/2009
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 1
+
| Configuration: Vertical Well
 
|-
 
|-
| Latitude: 40.291769
+
| Latitude: 40.291750
|-
 
| Longitude: -78.779031
 
 
|-
 
|-
 +
| Longitude: -78.779306
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2009-0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2009
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" |
 
|-
 
|-
| 2010-2
+
| 2010
| style="text-align:right;" | 0.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== Waste Data ==
+
<!--== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
+
|-
!scope="col" | WASTE FACILITY NAME
+
|}-->
!scope="col" | FACILITY CITY
+
 
!scope="col" | FACILITY STATE
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Waste Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 
| accessdate = 2015-05-26 }}</ref>
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1844187
 
| 1844187
| 2009-11-16
+
| Primary Facility
 +
| 11/16/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 150 ft depth.  Conductor pipe (20﾿) set at 42﾿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone in this section.  No coal seams or methane detected nor any voids were detected during the inspection.  Pit aligned with 20 mil plastic and no free board issues.  Spud date called on 9/29/09.  TD of well is 9250 ft depth and drilled to Marcellus and vertical well.  During the inspection, pit showed no signs of freeboard and industrial discharge.  At the time of the inspection, no E&S issues.
+
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 150 ft depth.  Conductor pipe (20¿) set at 42¿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone in this section.  No coal seams or methane detected nor any voids were detected during the inspection.  Pit aligned with 20 mil plastic and no free board issues.  Spud date called on 9/29/09.  TD of well is 9250 ft depth and drilled to Marcellus and vertical well.  During the inspection, pit showed no signs of freeboard and industrial discharge.  At the time of the inspection, no E&S issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1845227
 
| 1845227
| 2009-11-20
+
| Primary Facility
 +
| 11/20/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 1421 ft depth.  Conductor pipe (20﾿) set at 42﾿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone in this section.  No coal seams or methane detected nor any voids were detected during the inspection.  Pit aligned with 20 mil plastic and no free board issues.  Chesapeake was projecting to set 9 5/8﾿ at 1550﾿ during the weekend.  During the inspection, pit showed no signs of freeboard and industrial discharge.  At the time of the inspection, no E&S issues.
+
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 1421 ft depth.  Conductor pipe (20¿) set at 42¿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone in this section.  No coal seams or methane detected nor any voids were detected during the inspection.  Pit aligned with 20 mil plastic and no free board issues.  Chesapeake was projecting to set 9 5/8¿ at 1550¿ during the weekend.  During the inspection, pit showed no signs of freeboard and industrial discharge.  At the time of the inspection, no E&S issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1845451
 
| 1845451
| 2009-11-18
+
| Primary Facility
 +
| 11/18/2009
 +
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| At the time of inspection, the well was actively being drilled. Site was properly signed with E&S plan onsite for review. Access road was in good condition, no accelerated erosion or sedimentation issues were observed in relation to well site or access road. Compost filter socks were properly installed and functioning. Drill pit freeboard of 2ft had been exceeded. Spoke with drilling operator onsite and noted they had halted drilling and made plans to remove/haul drill fluids immediately in order to sustain freeboard. It is recommended that the operator condition to closely monitor the 2ft freeboard and also install a baffle on the drill pipe leading to the pit in order to aid in preventing the above violation.
 
| At the time of inspection, the well was actively being drilled. Site was properly signed with E&S plan onsite for review. Access road was in good condition, no accelerated erosion or sedimentation issues were observed in relation to well site or access road. Compost filter socks were properly installed and functioning. Drill pit freeboard of 2ft had been exceeded. Spoke with drilling operator onsite and noted they had halted drilling and made plans to remove/haul drill fluids immediately in order to sustain freeboard. It is recommended that the operator condition to closely monitor the 2ft freeboard and also install a baffle on the drill pipe leading to the pit in order to aid in preventing the above violation.
| 576371
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
|
 
|-
 
|-
 
| 1845451
 
| 2009-11-18
 
| Violation(s) Noted
 
| At the time of inspection, the well was actively being drilled. Site was properly signed with E&S plan onsite for review. Access road was in good condition, no accelerated erosion or sedimentation issues were observed in relation to well site or access road. Compost filter socks were properly installed and functioning. Drill pit freeboard of 2ft had been exceeded. Spoke with drilling operator onsite and noted they had halted drilling and made plans to remove/haul drill fluids immediately in order to sustain freeboard. It is recommended that the operator condition to closely monitor the 2ft freeboard and also install a baffle on the drill pipe leading to the pit in order to aid in preventing the above violation.
 
| 576371
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
|
 
|-
 
 
|-
 
|-
 
| 1845496
 
| 1845496
| 2009-11-24
+
| Primary Facility
 +
| 11/24/2009
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 2954 ft depth.  Conductor pipe (20﾿) set at 42﾿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone and shale in this section.  No coal seams or methane detected nor any voids were detected during the drilling of this section.  Pit aligned with 20 mil plastic and no free board issues.  Chesapeake set first string - 9 5/8﾿ at 1487﾿ with 262 sks and no return but cement was visible from surface.  Project will continue through week and projected to possible complete during the week of 12/1/09.
+
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 2954 ft depth.  Conductor pipe (20¿) set at 42¿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone and shale in this section.  No coal seams or methane detected nor any voids were detected during the drilling of this section.  Pit aligned with 20 mil plastic and no free board issues.  Chesapeake set first string - 9 5/8¿ at 1487¿ with 262 sks and no return but cement was visible from surface.  Project will continue through week and projected to possible complete during the week of 12/1/09.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1847956
 
| 1847956
| 2009-12-07
+
| Primary Facility
 +
| 12/07/2009
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 9742 ft depth deeper than anticipated depth of 9587﾿.  Depth of shale formation is deeper than anticipated but did not enter into the Onondaga Ls (conservative well).  Noma set new depth was 9855﾿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone and shale in this section.  Pit aligned with 20 mil plastic and no free board issues.
+
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Noma Drilling Rig 8 was at 9742 ft depth deeper than anticipated depth of 9587¿.  Depth of shale formation is deeper than anticipated but did not enter into the Onondaga Ls (conservative well).  Noma set new depth was 9855¿.  Permit was on-site.  Well log was present at the site.  Stratigraphy consisted of sandstone and shale in this section.  Pit aligned with 20 mil plastic and no free board issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1864625
 
| 1864625
| 2010-02-22
+
| Primary Facility
 +
| 02/22/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Well site has been drilled.  Service rig was on-site at time of inspection.  There is no evidence of accelerated erosion or sedimentation on the access road or well site.  Pit appears to be in sound condition.  Due to weather conditions, when the snow begins to melt the operator should closely monitor the site for erosion and sedimentation.
 
| Well site has been drilled.  Service rig was on-site at time of inspection.  There is no evidence of accelerated erosion or sedimentation on the access road or well site.  Pit appears to be in sound condition.  Due to weather conditions, when the snow begins to melt the operator should closely monitor the site for erosion and sedimentation.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1915994
 
| 1915994
| 2010-09-28
+
| Primary Facility
 +
| 09/28/2010
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit aligned with 20 mil plastic and with partial security fence.  During the inspection, pit showed no signs of freeboard and industrial discharge.
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit aligned with 20 mil plastic and with partial security fence.  During the inspection, pit showed no signs of freeboard and industrial discharge.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1918465
 
| 1918465
| 2010-10-07
+
| Primary Facility
 +
| 10/07/2010
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit aligned with 20 mil plastic and with partial security fence.  Hydrocarbon has release  pressure off well from 2950 psi to 1100 psi.  Attempting to kill well and set plug.  During the inspection, pit showed no signs of freeboard and industrial discharge.
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit aligned with 20 mil plastic and with partial security fence.  Hydrocarbon has release  pressure off well from 2950 psi to 1100 psi.  Attempting to kill well and set plug.  During the inspection, pit showed no signs of freeboard and industrial discharge.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1920003
 
| 1920003
| 2010-10-12
+
| Primary Facility
 +
| 10/12/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| drilled (12/07/09) and actively being plugged. Onsite with Jim Johnson and Kevin Swiger of Chesapeake Energy to review final site restoration plans. Operator intends to remove all pit contents (liquid, cuttings, and liner) and transport to an approved land fill. Depth and operator observe that pit contents are orange and level of pit appears to be slightly down, recommended that pit is addressed immediately by first removing liquid fraction. No accelerated ES issues observed, site is relatively flat, formerly farm fields. Operator plans to have pits removed, and site re-graded and seeded/mulched within next several weeks to preexisting conditions. Operator was also notified that if optimal growth (70% uniform veg. cover) is not achieved prior to first frost/snow, reseeding and mulching may be required in the spring in order to achieve permanent final restoration, and at that time all temporary bmp﾿s may be removed.  Noted that surface land owner requested that half of the access road remain
+
| drilled (12/07/09) and actively being plugged. Onsite with Jim Johnson and Kevin Swiger of Chesapeake Energy to review final site restoration plans. Operator intends to remove all pit contents (liquid, cuttings, and liner) and transport to an approved land fill. Depth and operator observe that pit contents are orange and level of pit appears to be slightly down, recommended that pit is addressed immediately by first removing liquid fraction. No accelerated ES issues observed, site is relatively flat, formerly farm fields. Operator plans to have pits removed, and site re-graded and seeded/mulched within next several weeks to preexisting conditions. Operator was also notified that if optimal growth (70% uniform veg. cover) is not achieved prior to first frost/snow, reseeding and mulching may be required in the spring in order to achieve permanent final restoration, and at that time all temporary bmp¿s may be removed.  Noted that surface land owner requested that half of the access road remain
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1920832
 
| 1920832
| 2010-10-19
+
| Primary Facility
 +
| 10/19/2010
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
|        At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit covered with 20 mil plastic and with partial security fence.  Hydrocarbon has set bottom plug at 9413 ft.  Set 100 ft of cement on top of plug.  Tried to shoot 5 ï¾½ ﾿casing at 4976 ft and 4230 ft. but could not pull casing with 115,000 psi to 160,000 psi.  Confirmed no gas zones behind pipe in the shallow Devonian zones with elog and drillers log.  Moved up to 1700 ft and cut the 5 1/2 ﾿ and was going to set an upper bridge plug and add 250 ft of cement plug on top of the plug.  Since it was coal permit, remaining will be left open with monument on surface.  During the inspection, pit showed no signs of freeboard and industrial discharge.
+
|        At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Hydrocarbon Drilling has been contracted to plug well.  Rig was set up over well and flow line was installed to pit.  Pit covered with 20 mil plastic and with partial security fence.  Hydrocarbon has set bottom plug at 9413 ft.  Set 100 ft of cement on top of plug.  Tried to shoot 5 ½ ¿casing at 4976 ft and 4230 ft. but could not pull casing with 115,000 psi to 160,000 psi.  Confirmed no gas zones behind pipe in the shallow Devonian zones with elog and drillers log.  Moved up to 1700 ft and cut the 5 1/2 ¿ and was going to set an upper bridge plug and add 250 ft of cement plug on top of the plug.  Since it was coal permit, remaining will be left open with monument on surface.  During the inspection, pit showed no signs of freeboard and industrial discharge.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1945532
 
| 1945532
| 2011-01-10
+
| Primary Facility
 +
| 01/10/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| During this inspection, well plugged with erected monument with attached API #. Site properly signed. Site snow covered, appears that pits have been removed and site restoration begun, although 70% successful vegetative cover could not be confirmed due to snow cover. Temporary bmp﾿s installed surrounding site. No accelerated erosion or sedimentation issues noted, but observe that manure/hay had been recently spread over site. A follow up inspection will be conducted in spring to ensure final restoration is achieved; if <70% vegetative cover observed operator may need to reseed and mulch site, until then operator should continue to maintain all temporary bmp﾿s Access road ok.
+
| During this inspection, well plugged with erected monument with attached API #. Site properly signed. Site snow covered, appears that pits have been removed and site restoration begun, although 70% successful vegetative cover could not be confirmed due to snow cover. Temporary bmp¿s installed surrounding site. No accelerated erosion or sedimentation issues noted, but observe that manure/hay had been recently spread over site. A follow up inspection will be conducted in spring to ensure final restoration is achieved; if <70% vegetative cover observed operator may need to reseed and mulch site, until then operator should continue to maintain all temporary bmp¿s Access road ok.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1986024
 
| 1986024
| 2011-06-28
+
| Primary Facility
 +
| 06/28/2011
 +
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Vent pipe present.  Area has been planted for agricultural planting and site appears to be restored.
 
| At the time of the inspection, no E&S issues and no IW issues at the site.  Well sign and E&S plan was located at the entrance during was present.  Vent pipe present.  Area has been planted for agricultural planting and site appears to be restored.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
| 1845451
 +
| 576371
 +
| 11/18/2009
 +
| 12/10/2009
 +
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 +
| Administrative
 
|  
 
|  
 +
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
| 576371
 +
| 252780
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
|  
+
| 12/10/2009
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 576371
 +
| 263012
 +
| CACP - Consent Assessment of Civil Penalty
 +
| Comply/Closed
 +
| 10/07/2010
 +
| 10/07/2010
 +
| style="text-align: right;" | $12,750.00
 +
| style="text-align: right;" | $12,750.00
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 16:26, 14 July 2019

Well Details

Well ID: 37-021-21140
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Adams Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 146827
Farm/Lease Name: WILMORE COAL CO 7
License Status: Plugged OG Well
Spud Date: 09/29/2009
Permit Date: 8/5/2009
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.291750
Longitude: -78.779306

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0.00 0.00
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1844187 Primary Facility 11/16/2009 Drilling/Alteration No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Noma Drilling Rig 8 was at 150 ft depth. Conductor pipe (20¿) set at 42¿. Permit was on-site. Well log was present at the site. Stratigraphy consisted of sandstone in this section. No coal seams or methane detected nor any voids were detected during the inspection. Pit aligned with 20 mil plastic and no free board issues. Spud date called on 9/29/09. TD of well is 9250 ft depth and drilled to Marcellus and vertical well. During the inspection, pit showed no signs of freeboard and industrial discharge. At the time of the inspection, no E&S issues.
1845227 Primary Facility 11/20/2009 Drilling/Alteration No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Noma Drilling Rig 8 was at 1421 ft depth. Conductor pipe (20¿) set at 42¿. Permit was on-site. Well log was present at the site. Stratigraphy consisted of sandstone in this section. No coal seams or methane detected nor any voids were detected during the inspection. Pit aligned with 20 mil plastic and no free board issues. Chesapeake was projecting to set 9 5/8¿ at 1550¿ during the weekend. During the inspection, pit showed no signs of freeboard and industrial discharge. At the time of the inspection, no E&S issues.
1845451 Primary Facility 11/18/2009 Routine/Complete Inspection Violation(s) Noted At the time of inspection, the well was actively being drilled. Site was properly signed with E&S plan onsite for review. Access road was in good condition, no accelerated erosion or sedimentation issues were observed in relation to well site or access road. Compost filter socks were properly installed and functioning. Drill pit freeboard of 2ft had been exceeded. Spoke with drilling operator onsite and noted they had halted drilling and made plans to remove/haul drill fluids immediately in order to sustain freeboard. It is recommended that the operator condition to closely monitor the 2ft freeboard and also install a baffle on the drill pipe leading to the pit in order to aid in preventing the above violation.
1845496 Primary Facility 11/24/2009 Drilling/Alteration No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Noma Drilling Rig 8 was at 2954 ft depth. Conductor pipe (20¿) set at 42¿. Permit was on-site. Well log was present at the site. Stratigraphy consisted of sandstone and shale in this section. No coal seams or methane detected nor any voids were detected during the drilling of this section. Pit aligned with 20 mil plastic and no free board issues. Chesapeake set first string - 9 5/8¿ at 1487¿ with 262 sks and no return but cement was visible from surface. Project will continue through week and projected to possible complete during the week of 12/1/09.
1847956 Primary Facility 12/07/2009 Routine/Complete Inspection No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Noma Drilling Rig 8 was at 9742 ft depth deeper than anticipated depth of 9587¿. Depth of shale formation is deeper than anticipated but did not enter into the Onondaga Ls (conservative well). Noma set new depth was 9855¿. Permit was on-site. Well log was present at the site. Stratigraphy consisted of sandstone and shale in this section. Pit aligned with 20 mil plastic and no free board issues.
1864625 Primary Facility 02/22/2010 Routine/Complete Inspection No Violations Noted Well site has been drilled. Service rig was on-site at time of inspection. There is no evidence of accelerated erosion or sedimentation on the access road or well site. Pit appears to be in sound condition. Due to weather conditions, when the snow begins to melt the operator should closely monitor the site for erosion and sedimentation.
1915994 Primary Facility 09/28/2010 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Hydrocarbon Drilling has been contracted to plug well. Rig was set up over well and flow line was installed to pit. Pit aligned with 20 mil plastic and with partial security fence. During the inspection, pit showed no signs of freeboard and industrial discharge.
1918465 Primary Facility 10/07/2010 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Hydrocarbon Drilling has been contracted to plug well. Rig was set up over well and flow line was installed to pit. Pit aligned with 20 mil plastic and with partial security fence. Hydrocarbon has release pressure off well from 2950 psi to 1100 psi. Attempting to kill well and set plug. During the inspection, pit showed no signs of freeboard and industrial discharge.
1920003 Primary Facility 10/12/2010 Routine/Complete Inspection No Violations Noted drilled (12/07/09) and actively being plugged. Onsite with Jim Johnson and Kevin Swiger of Chesapeake Energy to review final site restoration plans. Operator intends to remove all pit contents (liquid, cuttings, and liner) and transport to an approved land fill. Depth and operator observe that pit contents are orange and level of pit appears to be slightly down, recommended that pit is addressed immediately by first removing liquid fraction. No accelerated ES issues observed, site is relatively flat, formerly farm fields. Operator plans to have pits removed, and site re-graded and seeded/mulched within next several weeks to preexisting conditions. Operator was also notified that if optimal growth (70% uniform veg. cover) is not achieved prior to first frost/snow, reseeding and mulching may be required in the spring in order to achieve permanent final restoration, and at that time all temporary bmp¿s may be removed. Noted that surface land owner requested that half of the access road remain
1920832 Primary Facility 10/19/2010 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Hydrocarbon Drilling has been contracted to plug well. Rig was set up over well and flow line was installed to pit. Pit covered with 20 mil plastic and with partial security fence. Hydrocarbon has set bottom plug at 9413 ft. Set 100 ft of cement on top of plug. Tried to shoot 5 ½ ¿casing at 4976 ft and 4230 ft. but could not pull casing with 115,000 psi to 160,000 psi. Confirmed no gas zones behind pipe in the shallow Devonian zones with elog and drillers log. Moved up to 1700 ft and cut the 5 1/2 ¿ and was going to set an upper bridge plug and add 250 ft of cement plug on top of the plug. Since it was coal permit, remaining will be left open with monument on surface. During the inspection, pit showed no signs of freeboard and industrial discharge.
1945532 Primary Facility 01/10/2011 Routine/Complete Inspection No Violations Noted During this inspection, well plugged with erected monument with attached API #. Site properly signed. Site snow covered, appears that pits have been removed and site restoration begun, although 70% successful vegetative cover could not be confirmed due to snow cover. Temporary bmp¿s installed surrounding site. No accelerated erosion or sedimentation issues noted, but observe that manure/hay had been recently spread over site. A follow up inspection will be conducted in spring to ensure final restoration is achieved; if <70% vegetative cover observed operator may need to reseed and mulch site, until then operator should continue to maintain all temporary bmp¿s Access road ok.
1986024 Primary Facility 06/28/2011 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of the inspection, no E&S issues and no IW issues at the site. Well sign and E&S plan was located at the entrance during was present. Vent pipe present. Area has been planted for agricultural planting and site appears to be restored.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1845451 576371 11/18/2009 12/10/2009 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
576371 252780 NOV - Notice of Violation Comply/Closed 12/10/2009
576371 263012 CACP - Consent Assessment of Civil Penalty Comply/Closed 10/07/2010 10/07/2010 $12,750.00 $12,750.00

For data sources see[5]

References