| Well ID: 37-105-21668
 
| Well ID: 37-105-21668
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.849558, -78.146366 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.849558, -78.146367 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Potter County, Pennsylvania|Potter]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Clara Township, Potter County, Pennsylvania|Clara Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Potter_County,_Pennsylvania|Potter]]
 +
|-
 +
| Municipality: [[Clara Township,_Potter_County,_Pennsylvania|Clara Township]]
 
|-
 
|-
 
| Operator Name: [[PA GEN ENERGY CO LLC]]
 
| Operator Name: [[PA GEN ENERGY CO LLC]]
 
|-
 
|-
| Well Pad ID: [[148344|148344]]
+
| Well Pad ID: [[148344]]
 
|-
 
|-
 
| Farm/Lease Name: FISK HOLLOW 2452
 
| Farm/Lease Name: FISK HOLLOW 2452
 
|-
 
|-
| First Permit Date: 2010-05-04
+
| License Status: Active
|-
 
| Last Permit Date: 2010-05-04
 
|-
 
| Spud Date: 2010-08-30
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 08/30/2010
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 5/4/2010
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 3
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 41.849558
 
| Latitude: 41.849558
 
|-
 
|-
| Longitude: -78.146366
+
| Longitude: -78.146367
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-3
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 9627.0
 
| style="text-align:right;" | 11.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2011-2
+
| 2010
| style="text-align:right;" | 93848.0
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 180.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[PA GEN ENERGY CO LLC]]
 +
| style="text-align: right;" | 103,475.00
 +
| style="text-align: right;" | 191
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2012
| style="text-align:right;" | 60813.0
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 115,458.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[PA GEN ENERGY CO LLC]]
 +
| style="text-align: right;" | 85,230.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2014
| style="text-align:right;" | 54645.0
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 78,193.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 363
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[PA GEN ENERGY CO LLC]]
 +
| style="text-align: right;" | 69,765.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2016
| style="text-align:right;" | 38982.0
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 65,052.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[PA GEN ENERGY CO LLC]]
 +
| style="text-align: right;" | 58,299.00
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2018
| style="text-align:right;" | 46248.0
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 51,114.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 364
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2014-1
+
| [[PA GEN ENERGY CO LLC]]
| style="text-align:right;" | 39806.0
+
| style="text-align: right;" | 10,872.00
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 38387.0
 
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 5998.0
 
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 6336.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 6112.0
 
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 590.21
+
| style="text-align: right;" | 590.21 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100361
 
| 100361
| MCKEAN COUNTY LANDFILL
 
| KANE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 150.0
+
| style="text-align: right;" | 150.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 663.0
+
| style="text-align: right;" | 663.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
 
| WARREN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 143.55
+
| style="text-align: right;" | 147.81 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 101397
+
| 100361
| ADVANCED DISPOSAL SERVICES GREENTREE LANDFILL
 
| KERSEY
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 147.81
+
| style="text-align: right;" | 143.55 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 100361
+
| 101397
| MCKEAN COUNTY LANDFILL
 
| KANE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 166.0
+
| style="text-align: right;" | 166.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
| WASTE TREATMENT CORPORATION
 
| WARREN
 
| PA
 
 
|-
 
|-
 +
| 2011-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,389.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FLOWBACK FRACTURING SAND
+
| Fracturing Fluid Waste (in Tons)
| style="text-align:right;" | 12.47
+
| style="text-align: right;" | 12.47 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100277
 
| 100277
| WESTMORELAND WASTE LLC SANITARY LANDFILL
 
| BELLE VERNON
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 13,749.75 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
|-
 
|-
 
| 2011-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 13.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2011-2
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 998.83 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| DRILLING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 998.83
+
| style="text-align: right;" | 6,112.58 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR0123
+
| 34-099-23127
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 91.26
+
| style="text-align: right;" | 367.22 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24096
+
| 34-007-24355
| GROSELLE INECTION WELL # 2
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 367.22
+
| style="text-align: right;" | 244.35 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-24355
+
| 34-133-21076
| MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 91.26 Bbl
| Bbl
+
| INJECTION DISPOSAL WELL
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 34-133-24096
| 34-099-23127
 
| NORTHSTAR #1
 
| YOUNGSTOWN
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 14.0
+
| style="text-align: right;" | 14,904.79 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| UIC 45
 
| UIC 45
| RAY PANDER TRUCKING INC
 
| DIAMOND
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 180.48
+
| style="text-align: right;" | 180.48 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2012-1
| 2011-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 2,243.33 Bbl
| style="text-align:right;" | 244.35
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| Bbl
+
| 525-1
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
| SALTYS DISPOSAL - MYERS INECTION WELL #1
 
| PARIS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,536.67 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-151-23420
 
| 34-151-23420
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 20.00 Bbl
| Bbl
+
| INJECTION DISPOSAL WELL
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 34-155-21447
| 525-1
 
| BLAZEK PUMP AND WELL
 
| HIRAM
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 20.0
+
| style="text-align: right;" | 1,915.83 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21447
+
| 34-155-21893
| KLEESE #2 (SWIW #19)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,349.17 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| 34-155-23795
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 410.83
+
| style="text-align: right;" | 410.83 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
|-
 
| 2012-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
| WOLF #1 DISP WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| FLOWBACK FRACTURING SAND
+
| Fracturing Fluid Waste (in Tons)
| style="text-align:right;" | 0.45
+
| style="text-align: right;" | 0.45 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 301626
 
| 301626
| WHITE PINES LANDFILL
 
| MILLVILLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 380.0
+
| style="text-align: right;" | 332.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| INJECTION DISPOSAL WELL
+
| WMGR123
| 34-151-23420
 
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 909.0
+
| style="text-align: right;" | 3,382.00 Bbl
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-20525
 
| BLAZEK #2 SWIW
 
| HIRAM
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 3.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123NW005
 
| WMGR123NW005
| CARES MCKEAN WATER TRMT & RECYCLING FAC
 
| MOUNT JEWITT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 332.0
+
| style="text-align: right;" | 20.00 Bbl
| Bbl
+
| INJECTION DISPOSAL WELL
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 34-007-24355
| WMGR0123
 
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 642.0
+
| style="text-align: right;" | 909.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-133-20525
| KLEESE #1 (SWIW #18)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 570.0
+
| style="text-align: right;" | 380.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21447
+
| 34-151-23420
| KLEESE #2 (SWIW #19)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 20.0
+
| style="text-align: right;" | 642.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-24355
+
| 34-155-21438
| MILLER & CO #3 (SWIW #28)
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 570.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-155-21447
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
|-
 
| 2012-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 67.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 305.0
+
| style="text-align: right;" | 305.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
| 34-155-21893
| WOLF #1 DISP WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 305.0
+
| style="text-align: right;" | 305.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21894
 
| 34-155-21894
| WOLF #2 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 306.0
+
| style="text-align: right;" | 306.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23203
 
| 34-155-23203
| WOLF #4 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
|-
+
| 2012-2
| 2013-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 1,314.00 Bbl
| style="text-align:right;" | 720.0
 
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-23420
+
| 34-155-23795
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
 
|-
 
|-
 +
| 2012-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 67.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 676.67
+
| style="text-align: right;" | 676.67 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-20525
 
| 34-133-20525
| BLAZEK #2 SWIW
 
| HIRAM
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 80.0
+
| style="text-align: right;" | 720.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-151-23420
| KLEESE #1 (SWIW #18)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 40.0
+
| style="text-align: right;" | 80.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23759
+
| 34-155-21438
| KLEESE #5 (SWIW #25)
 
| TRUMBULL
 
| OH
 
|-
 
|-
 
| 2013-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 445.83
+
| style="text-align: right;" | 445.83 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
| 34-155-21893
| WOLF #1 DISP WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 445.83
+
| style="text-align: right;" | 445.83 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21894
 
| 34-155-21894
| WOLF #2 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 445.83
+
| style="text-align: right;" | 445.83 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23203
 
| 34-155-23203
| WOLF #4 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
|-
+
| 2013-1
| 2013-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 40.00 Bbl
| style="text-align:right;" | 18.36
 
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-22403
+
| 34-155-23759
| ANNAROCK D-1
 
| FOWLER
 
| OH
 
 
|-
 
|-
|-
+
| 2013-1
| 2013-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 1,100.00 Bbl
| style="text-align:right;" | 240.0
 
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-23420
+
| 34-155-23795
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 399.9
+
| style="text-align: right;" | 399.90 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-20525
 
| 34-133-20525
| BLAZEK #2 SWIW
 
| HIRAM
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 20.0
+
| style="text-align: right;" | 20.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-151-21198
 
| 34-151-21198
| LYONS INJECTION WELL # 1
 
| BYEVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 595.0
+
| style="text-align: right;" | 240.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-151-23420
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
|-
 
| 2013-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 1.0
 
| Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 265.0
+
| style="text-align: right;" | 265.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21893
 
| 34-155-21893
| WOLF #1 DISP WELL
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 265.0
+
| style="text-align: right;" | 265.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21894
 
| 34-155-21894
| WOLF #2 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
 +
| 2013-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 18.36 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-22403
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 265.0
+
| style="text-align: right;" | 265.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23203
 
| 34-155-23203
| WOLF #4 DISPOSAL WELL
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
|-
+
| 2013-2
| 2014-1
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 595.00 Bbl
| style="text-align:right;" | 20.0
 
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-22403
+
| 34-155-23795
| ANNAROCK D-1
 
| FOWLER
 
| OH
 
 
|-
 
|-
 +
| 2013-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,124.07 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 158.33
+
| style="text-align: right;" | 18.33 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-151-23420
+
| 34-007-21847
| BELDEN & BLAKE WELL # 2
 
| HARTVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 120.0
+
| style="text-align: right;" | 120.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-20525
 
| 34-133-20525
| BLAZEK #2 SWIW
 
| HIRAM
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 158.33 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-151-23420
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 320.0
+
| style="text-align: right;" | 320.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21438
 
| 34-155-21438
| KLEESE #1 (SWIW #18)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 156.33
+
| style="text-align: right;" | 156.33 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-21447
 
| 34-155-21447
| KLEESE #2 (SWIW #19)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 120.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 416.67
+
| style="text-align: right;" | 120.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23732
+
| 34-155-21894
| KLEESE #4 (SWIW #24)
 
| VIENNA
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 240.0
+
| style="text-align: right;" | 20.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23759
+
| 34-155-22403
| KLEESE #5 (SWIW #25)
 
| TRUMBULL
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 158.33
+
| style="text-align: right;" | 158.33 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
| 34-155-23196
| NATALE #1 (SWIW #28)
 
| WARREN
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 120.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23203
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 120.0
+
| style="text-align: right;" | 120.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
| 34-155-23223
| NATALE #2 (SWIW #29)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 416.67 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 238.33
+
| style="text-align: right;" | 240.00 Bbl
| Bbl
+
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 238.33 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-155-23795
 
| 34-155-23795
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 366.67
+
| style="text-align: right;" | 366.67 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,560.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-21847
 +
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 20.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 20.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
| 2014-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 543.21 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 192.50 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 820.83 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-21847
 +
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 175.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 788.83 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 155.83 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW005
 
|-
 
|-
| 2014-1
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 18.33
+
| style="text-align: right;" | 740.67 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 122.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-007-21847
 
| 34-007-21847
| RHOA #3 (SWIW #8)
 
| JEFFERSON
 
| OH
 
 
|-
 
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 93.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 +
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 88.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC010
 +
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 431.66 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 203.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW005
 
|-
 
|-
| 2014-1
+
| 2016-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 120.0
+
| style="text-align: right;" | 1,255.50 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3097
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3177
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-2-3692
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 70.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21893
+
| 34-007-21847
| WOLF #1 DISP WELL
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-23262
 
|-
 
|-
| 2014-1
+
| 2016-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 120.0
+
| style="text-align: right;" | 3.50 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21894
+
| 34-007-24355
| WOLF #2 DISPOSAL WELL
+
|-
| NEWTON FALLS
+
| 2016-2
| OH
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 95.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2016-2
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 34.17 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW005
 +
|-
 +
| 2016-2
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,352.17 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NW011
 +
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 52.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 159.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017-02
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 243.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-03
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 232.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-04
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 232.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-05
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 21.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 223.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 89.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2017-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 230.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 268.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 208.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 238.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2017-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 292.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
 +
| 2017-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 219.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2014-1
+
| 2018-01
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 120.0
+
| style="text-align: right;" | 15.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23203
+
| 34-007-21847
| WOLF #4 DISPOSAL WELL
+
|-
| NEWTON FALLS
+
| 2018-01
| OH
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 35.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2018-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 53.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 92.50 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-02
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 160.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 218.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 201.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 39.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 150.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-06
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 
|-
 
|-
 +
| 2018-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 192.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2014-2
+
| 2018-07
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 20.0
+
| style="text-align: right;" | 140.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21438
+
| 34-007-21847
| KLEESE #1 (SWIW #18)
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 56.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2014-2
+
| 2018-08
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 20.0
+
| style="text-align: right;" | 69.17 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23196
+
| 34-007-21847
| NATALE #1 (SWIW #28)
+
|-
| WARREN
+
| 2018-08
| OH
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 140.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 196.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2018-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 41.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 225.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
 +
| 2018-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018-11
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 80.0
+
| style="text-align: right;" | 69.17 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23223
+
| 34-007-21847
| NATALE #2 (SWIW #29)
+
|-
| VIENNA
+
| 2018-11
| OH
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW005
 +
|-
 +
| 2018-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 73.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
 +
| 2018-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 146.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 
|-
 
|-
| 2014-2
+
| 2018-12
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 543.21
+
| style="text-align: right;" | 36.67 Bbl
| Bbl
+
| REUSE (AT WELL PAD)
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2019-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 69.17 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-007-21847
 +
|-
 +
| 2019-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 36.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2019-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 110.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2019-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 60.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 
|-
 
|-
| 2014-2
+
| 2019-03
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 55.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-21847
+
| PAS2D215BWAR
| RHOA #3 (SWIW #8)
+
|-
| JEFFERSON
+
| 2019-03
| OH
+
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NW011
 +
|-
 +
| 2019-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1946121
 
| 1946121
| 2011-01-27
+
| Primary Facility
 +
| 01/27/2011
 +
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 1951315
 +
| Primary Facility
 +
| 02/18/2011
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2017568
 +
| Primary Facility
 +
| 11/08/2011
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
| An inspection was conducted at the Fisk Hollow Pad B on 11/8/11.  The site ID sign and E&S plan and site perimeter were observed.  The access road was installed, stabilized and the accociated BMPs functioning.  The perimeter BMPs were installed and functioning.  The site were stablized.  A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.  Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL).  During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release.  A voicemail was left for Landon Vanord, Enviromental Technician from PGE,  at 1033 on his cell phone making aware of the release.  A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568)
 +
|-
 +
| 2018737
 +
| Primary Facility
 +
| 11/14/2011
 +
| Follow-up Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  On 11/10/11 PGE began the site cleanup.  During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal.  There was a  puddle in the excavated area showed a field meter reading over 16 mS.  A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis.  A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS.  A sample was collected and submitted for SAC 942 analysis.  No new violations were cited during this inspection. - MRN
 +
|-
 +
| 2025377
 +
| Primary Facility
 +
| 12/09/2011
 +
| Follow-up Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  On 11/10/11 PGE began the site cleanup.  During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal.  During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic.  The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner.  A frac tank was on-site and production fluid was being stored there.  Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks.  No sample were collected because the surface of the puddle were frozen.  No new violations were cited during this inspection.
 +
|-
 +
| 2028650
 +
| Primary Facility
 +
| 12/21/2011
 +
| Compliance Evaluation
 +
| Outstanding Violations - No Viols Req'd
 +
|  During this inspection, the contaminated soil has been transported off-site.  During this inspection, the excavated has been backfilled.  The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection .  A mobile frac tank was on-site and production fluid was being stored there, on secondary containment.  Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity.  A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900µS.  This must be addressed.  No new violations were cited during this inspection.  Violations remain outstanding related to the spill. - MRN
 +
|-
 +
| 2045286
 +
| Primary Facility
 +
| 02/24/2012
 +
| Compliance Evaluation
 +
| Outstanding Violations - No Viols Req'd
 +
| On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  The ground was frozen and snow covered.  Weather conditions were 35 degrees and foggy.  The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site.  There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS).  This was reported via email to PGE the afternoon of Feb. 24, 2012.  PGE stated this would be investigated.  No new violations were cited during this inspection. .  - MRN
 +
|-
 +
| 2060891
 +
| Primary Facility
 +
| 04/19/2012
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a  release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  The excavation area had been backfilled and the were no puddles visible near the containemnt system.  The following violations cited in the inpsection report (2017568) referenced above are being resolved.
 +
|-
 +
| 2106225
 +
| Primary Facility
 +
| 10/10/2012
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2147824
 +
| Primary Facility
 +
| 03/13/2013
 +
| Site Restoration
 +
| No Violations Noted
 +
| An inspection of the Fisk Hollow Clara Pad B in Clara Township, Potter County was conducted on March 13, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2452, 2453, 2454, 2455, 2456 and 2457) .  The last self-inspection conducted on behalf of PGE was on 3/12/13.  The site has been re-graded and temporarily stabilized.  the applicable Post construction Stormwater BMPs have been installed.  The site was determined to not meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization at this time.  A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed.  A follow up inspection will be conducted at a later date to verify the site has been permanently stabilized.  The Well Site Restoration Reports will not be approved until that time.  No violations were cited during this inspection.
 +
|-
 +
| 2190381
 +
| Primary Facility
 +
| 07/11/2013
 +
| Follow-up Inspection
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2382188
 +
| Primary Facility
 +
| 06/24/2015
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Partial inspection of Fisk Hollow Clara Pad B. Site is restored and permanently stabilized. TLT
 
|-
 
|-
| 1951315
+
| 2485737
| 2011-02-18
+
| Primary Facility
 +
| 2016-05-19
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2557176
 +
| Primary Facility
 +
| 2017-01-31
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
|
 
|
 
 
|-
 
|-
 +
| 2733668
 +
| Primary Facility
 +
| 2018-05-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of this inspection this well was in prodution
 +
|-
 +
| 2802399
 +
| Primary Facility
 +
| 2018-11-09
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| Admin inspection for purpose of linking to a plugging COA.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
 
| 2017568
 
| 2017568
| 2011-11-08
 
| Violation(s) Noted
 
| An inspection was conducted at the Fisk Hollow Pad B on 11/8/11.  The site ID sign and E&S plan and site perimeter were observed.  The access road was installed, stabilized and the accociated BMPs functioning.  The perimeter BMPs were installed and functioning.  The site were stablized.  A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.  Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL).  During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release.  A voicemail was left for Landon Vanord, Enviromental Technician from PGE,  at 1033 on his cell phone making aware of the release.  A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568)
 
 
| 624100
 
| 624100
 +
| 11/08/2011
 +
| 04/19/2012
 
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 
| 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution.
 +
| Environmental Health & Safety
 
| A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
 
| A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
|-
 
 
|-
 
|-
 
| 2017568
 
| 2017568
| 2011-11-08
 
| Violation(s) Noted
 
| An inspection was conducted at the Fisk Hollow Pad B on 11/8/11.  The site ID sign and E&S plan and site perimeter were observed.  The access road was installed, stabilized and the accociated BMPs functioning.  The perimeter BMPs were installed and functioning.  The site were stablized.  A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.  Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL).  During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release.  A voicemail was left for Landon Vanord, Enviromental Technician from PGE,  at 1033 on his cell phone making aware of the release.  A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568)
 
 
| 624101
 
| 624101
 +
| 11/08/2011
 +
| 04/19/2012
 
| 78.57 - Failure to post pit approval number
 
| 78.57 - Failure to post pit approval number
 +
| Administrative
 
| 78.57 (a) - A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
 
| 78.57 (a) - A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
|-
 
 
|-
 
|-
 
| 2017568
 
| 2017568
| 2011-11-08
 
| Violation(s) Noted
 
| An inspection was conducted at the Fisk Hollow Pad B on 11/8/11.  The site ID sign and E&S plan and site perimeter were observed.  The access road was installed, stabilized and the accociated BMPs functioning.  The perimeter BMPs were installed and functioning.  The site were stablized.  A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.  Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL).  During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release.  A voicemail was left for Landon Vanord, Enviromental Technician from PGE,  at 1033 on his cell phone making aware of the release.  A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568)
 
 
| 624102
 
| 624102
 +
| 11/08/2011
 +
| 04/19/2012
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 +
| Environmental Health & Safety
 
| A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
 
| A release of a pollutional substance was discovered near the production tanks.  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  A sample was collected and submitted for SAC 942 analysis.
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2018737
+
| 624100
| 2011-11-14
+
| 277433
| Outstanding Violations - No Viols Req'd
+
| NOV - Notice of Violation
| A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  A hook-up for pumping out the contained fluid was located off the containment and was leaking.  On 11/10/11 PGE began the site cleanup.  During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal.  There was a  puddle in the excavated area showed a field meter reading over 16 mS.  A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis.  A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS.  A sample was collected and submitted for SAC 942 analysis.  No new violations were cited during this inspection. - MRN
+
| Comply/Closed
 
|  
 
|  
 +
| 04/19/2012
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 624101
 +
| 277433
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 04/19/2012
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 624102
 +
| 277433
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 04/19/2012
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 2025377
+
| 1
| 2011-12-09
+
| 02/11/2011
| Outstanding Violations - No Viols Req'd
+
| 02/11/2011
| A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic. The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner. A frac tank was on-site and production fluid was being stored there.  Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks.  No sample were collected because the surface of the puddle were frozen.  No new violations were cited during this inspection.
+
| style="text-align: right;" | 5760.00
|  
+
| style="text-align: right;" | 2,679,112.0
|  
+
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="19"| 1
 +
| rowspan="4"| AI-2
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Acid Inhibitor
 +
| 2-Butoxyethanol
 +
| 111-76-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00035000
 +
| style="text-align: right;" |
 +
|-
 +
| Propargyl alcohol
 +
| 107-19-7
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00035000
 +
| style="text-align: right;" |
 +
|-
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00035000
 +
| style="text-align: right;" |
 +
|-
 +
| Proprietary Component
 
|  
 
|  
 +
| style="text-align: right;" | 7.00
 +
| style="text-align: right;" | 0.00008000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Acid, Hydrochloric (3)
 +
| rowspan="1"| Superior Well Services
 +
| rowspan="1"| Solvent
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 3.00
 +
| style="text-align: right;" | 0.05
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| KR-153SL
 +
| rowspan="4"| Superior Well Services
 +
| rowspan="4"| Biocide
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 1.00
 +
| style="text-align: right;" | 0.00964000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| Polyethylene glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00482000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2028650
+
| Diethylene glycol
| 2011-12-21
+
| 111-46-6
| Outstanding Violations - No Viols Req'd
+
| style="text-align: right;" | 3.50
| During this inspection, the contaminated soil has been transported off-site.  During this inspection, the excavated has been backfilled.  The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection .  A mobile frac tank was on-site and production fluid was being stored there, on secondary containment.  Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity.  A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900ï¾µS. This must be addressed.  No new violations were cited during this inspection.  Violations remain outstanding related to the spill. - MRN
+
| style="text-align: right;" | 0.00034000
|  
+
| style="text-align: right;" |  
|
 
|  
 
 
|-
 
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 20.00
 +
| style="text-align: right;" | 0.00193000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2045286
+
|- valign="top"
| 2012-02-24
+
| rowspan="4"| WFR-3B
| Outstanding Violations - No Viols Req'd
+
| rowspan="4"| Superior Well Services
| On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  The ground was frozen and snow covered.  Weather conditions were 35 degrees and foggy.  The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site.  There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS).  This was reported via email to PGE the afternoon of Feb. 24, 2012.  PGE stated this would be investigated.  No new violations were cited during this inspection. .  - MRN
+
| rowspan="4"| Friction Reducer
|  
+
| Distillates, petroleum, hydrotreated light
|  
+
| 64742-47-8
|  
+
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.02
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
| Ethoxylated C12-16 alcohols
 +
| 68551-12-2
 +
| style="text-align: right;" | 4.00
 +
| style="text-align: right;" | 0.00298000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2060891
+
| 1,2-Propylene glycol
| 2012-04-19
+
| 57-55-6
| No Violations Noted
+
| style="text-align: right;" | 25.00
| On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a  release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568).  The excavation area had been backfilled and the were no puddles visible near the containemnt system.  The following violations cited in the inpsection report (2017568) referenced above are being resolved.  
+
| style="text-align: right;" | 0.01
(1) Solid Waste Management Act, 35 P.S. ᄃ 6018.301 - Management of Residual Waste
+
| style="text-align: right;" |  
(2) Section 402 of the Clean Streams Law, 35 P.S. ᄃ691.402 - discharge of a pollutional substance at the Site created a potential danger of pollution of the waters of the Commonwealth.
 
(3) 25 Pa. Code, ᄃ78.57(a) - Failure to adequately control, store and dispose of a production fluid.
 
 
 
|
 
|
 
|  
 
 
|-
 
|-
 +
| Stoddard solvent
 +
| 8052-41-3
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00745000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2106225
+
|- valign="top"
| 2012-10-10
+
| rowspan="4"| Super TSC
| No Violations Noted
+
| rowspan="4"| Superior Well Services
|  
+
| rowspan="4"| Scale Inhibitor
|  
+
| Anionic copolymer
|  
 
 
|  
 
|  
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00147000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
| 1,2,4-Butanetricarboxylic acid, 2-phosphono-
 +
| 37971-36-1
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00147000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2147824
+
| Anionic polymer
| 2013-03-13
 
| No Violations Noted
 
| An inspection of the Fisk Hollow Clara Pad B in Clara Township, Potter County was conducted on March 13, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2452, 2453, 2454, 2455, 2456 and 2457) .  The last self-inspection conducted on behalf of PGE was on 3/12/13.  The site has been re-graded and temporarily stabilized.  the applicable Post construction Stormwater BMPs have been installed.  The site was determined to not meet the requirements of 25 Pa Code ᄃ102.22(a)(2) (i) Permanent Stabilization at this time.  A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed.  A follow up inspection will be conducted at a later date to verify the site has been permanently stabilized.  The Well Site Restoration Reports will not be approved until that time.  No violations were cited during this inspection.
 
|
 
|
 
 
|  
 
|  
 +
| style="text-align: right;" | 10.00
 +
| style="text-align: right;" | 0.00147000
 +
| style="text-align: right;" |
 +
|-
 +
| 1,2-Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 50.00
 +
| style="text-align: right;" | 0.00734000
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"| Superior Well Services
 +
| rowspan="1"| Proppant
 +
| Quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 14.95
 +
| style="text-align: right;" |
 
|-
 
|-
| 2190381
+
|- valign="top"
| 2013-07-11
+
| rowspan="1"| Water
| No Violations Noted
+
| rowspan="1"| PGE
|  
+
| rowspan="1"| Carrier/Base Fluid
|  
+
| Water
|  
+
| 7732-18-5
|  
+
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 83.01
 +
| style="text-align: right;" |  
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 01:15, 15 July 2019

Well Details

Well ID: 37-105-21668
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Clara Township
Operator Name: PA GEN ENERGY CO LLC
Well Pad ID: 148344
Farm/Lease Name: FISK HOLLOW 2452
License Status: Active
Spud Date: 08/30/2010
Permit Date: 5/4/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.849558
Longitude: -78.146367

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2011 PA GEN ENERGY CO LLC 103,475.00 191 0.00 0 0.00 0
2012 PA GEN ENERGY CO LLC 115,458.00 366 0.00 0 0.00 0
2013 PA GEN ENERGY CO LLC 85,230.00 365 0.00 0 0.00 0
2014 PA GEN ENERGY CO LLC 78,193.00 363 0.00 0 0.00 0
2015 PA GEN ENERGY CO LLC 69,765.00 365 0.00 0 0.00 0
2016 PA GEN ENERGY CO LLC 65,052.00 366 0.00 0 0.00 0
2017 PA GEN ENERGY CO LLC 58,299.00 364 0.00 0 0.00 0
2018 PA GEN ENERGY CO LLC 51,114.00 364 0.00 0 0.00 0
2019 PA GEN ENERGY CO LLC 10,872.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Drill Cuttings (in Tons) 590.21 Tons LANDFILL 100361
2010-2 Drilling Fluid Waste (in Barrels) 150.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-2 Drilling Fluid Waste (in Barrels) 663.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-1 Drill Cuttings (in Tons) 147.81 Tons LANDFILL 100361
2011-1 Drill Cuttings (in Tons) 143.55 Tons LANDFILL 101397
2011-1 Drilling Fluid Waste (in Barrels) 166.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-1 Fracing Fluid Waste (in Barrels) 1,389.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-1 Fracturing Fluid Waste (in Tons) 12.47 Tons LANDFILL 100277
2011-1 Produced Fluid (in Barrels) 13,749.75 Bbl REUSE OTHER THAN ROAD SPREADING
2011-2 Drilling Fluid Waste (in Barrels) 998.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011-2 Produced Fluid (in Barrels) 6,112.58 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011-2 Produced Fluid (in Barrels) 367.22 Bbl INJECTION DISPOSAL WELL 34-007-24355
2011-2 Produced Fluid (in Barrels) 244.35 Bbl INJECTION DISPOSAL WELL 34-133-21076
2011-2 Produced Fluid (in Barrels) 91.26 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011-2 Produced Fluid (in Barrels) 14,904.79 Bbl INJECTION DISPOSAL WELL UIC 45
2011-2 Produced Fluid (in Barrels) 180.48 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 2,243.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012-1 Produced Fluid (in Barrels) 1,536.67 Bbl INJECTION DISPOSAL WELL 34-151-23420
2012-1 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012-1 Produced Fluid (in Barrels) 1,915.83 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012-1 Produced Fluid (in Barrels) 1,349.17 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012-1 Produced Fluid (in Barrels) 410.83 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Fracturing Fluid Waste (in Tons) 0.45 Tons LANDFILL 301626
2012-2 Produced Fluid (in Barrels) 332.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-2 Produced Fluid (in Barrels) 3,382.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2012-2 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2012-2 Produced Fluid (in Barrels) 909.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2012-2 Produced Fluid (in Barrels) 380.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2012-2 Produced Fluid (in Barrels) 642.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012-2 Produced Fluid (in Barrels) 570.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012-2 Produced Fluid (in Barrels) 305.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012-2 Produced Fluid (in Barrels) 305.00 Bbl INJECTION DISPOSAL WELL 34-155-21894
2012-2 Produced Fluid (in Barrels) 306.00 Bbl INJECTION DISPOSAL WELL 34-155-23203
2012-2 Produced Fluid (in Barrels) 1,314.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012-2 Produced Fluid (in Barrels) 67.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Produced Fluid (in Barrels) 676.67 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013-1 Produced Fluid (in Barrels) 720.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2013-1 Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013-1 Produced Fluid (in Barrels) 445.83 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013-1 Produced Fluid (in Barrels) 445.83 Bbl INJECTION DISPOSAL WELL 34-155-21894
2013-1 Produced Fluid (in Barrels) 445.83 Bbl INJECTION DISPOSAL WELL 34-155-23203
2013-1 Produced Fluid (in Barrels) 40.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013-1 Produced Fluid (in Barrels) 1,100.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013-2 Produced Fluid (in Barrels) 399.90 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013-2 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-151-21198
2013-2 Produced Fluid (in Barrels) 240.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2013-2 Produced Fluid (in Barrels) 265.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013-2 Produced Fluid (in Barrels) 265.00 Bbl INJECTION DISPOSAL WELL 34-155-21894
2013-2 Produced Fluid (in Barrels) 18.36 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013-2 Produced Fluid (in Barrels) 265.00 Bbl INJECTION DISPOSAL WELL 34-155-23203
2013-2 Produced Fluid (in Barrels) 595.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013-2 Produced Fluid (in Barrels) 1,124.07 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 18.33 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014-1 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2014-1 Produced Fluid (in Barrels) 158.33 Bbl INJECTION DISPOSAL WELL 34-151-23420
2014-1 Produced Fluid (in Barrels) 320.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014-1 Produced Fluid (in Barrels) 156.33 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014-1 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2014-1 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-155-21894
2014-1 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2014-1 Produced Fluid (in Barrels) 158.33 Bbl INJECTION DISPOSAL WELL 34-155-23196
2014-1 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-155-23203
2014-1 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014-1 Produced Fluid (in Barrels) 416.67 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014-1 Produced Fluid (in Barrels) 240.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014-1 Produced Fluid (in Barrels) 238.33 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014-1 Produced Fluid (in Barrels) 366.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 1,560.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014-2 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014-2 Produced Fluid (in Barrels) 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2014-2 Produced Fluid (in Barrels) 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014-2 Produced Fluid (in Barrels) 543.21 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 192.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015-1 Produced Fluid (in Barrels) 820.83 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015-1 Produced Fluid (in Barrels) 175.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-1 Produced Fluid (in Barrels) 788.83 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 155.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2015-2 Produced Fluid (in Barrels) 740.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015-2 Produced Fluid (in Barrels) 122.50 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015-2 Produced Fluid (in Barrels) 93.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-2 Produced Fluid (in Barrels) 88.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-2 Produced Fluid (in Barrels) 431.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 203.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016-1 Produced Fluid (in Barrels) RWC 802 1,255.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-1 Produced Fluid (in Barrels) RWC 802 3.50 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2016-1 Produced Fluid (in Barrels) RWC 802 3.50 Bbl INJECTION DISPOSAL WELL 34-007-2-3177
2016-1 Produced Fluid (in Barrels) RWC 802 3.50 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016-1 Produced Fluid (in Barrels) RWC 802 70.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016-1 Produced Fluid (in Barrels) RWC 802 3.50 Bbl INJECTION DISPOSAL WELL 34-007-23262
2016-1 Produced Fluid (in Barrels) RWC 802 3.50 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016-2 Produced Fluid (in Barrels) RWC 802 95.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-2 Produced Fluid (in Barrels) RWC 802 34.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016-2 Produced Fluid (in Barrels) RWC 802 1,352.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017-01 Produced Fluid (in Barrels) RWC 802 52.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-01 Produced Fluid (in Barrels) RWC 802 159.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-01 Produced Fluid (in Barrels) RWC 802 17.50 Bbl REUSE (AT WELL PAD)
2017-02 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-02 Produced Fluid (in Barrels) RWC 802 243.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-03 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-03 Produced Fluid (in Barrels) RWC 802 232.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Produced Fluid (in Barrels) RWC 802 232.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-05 Other Oil & Gas Wastes (in Barrels) RWC 899 21.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-05 Produced Fluid (in Barrels) RWC 802 223.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-06 Produced Fluid (in Barrels) RWC 802 89.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-06 Produced Fluid (in Barrels) RWC 802 110.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-07 Produced Fluid (in Barrels) RWC 802 230.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-08 Produced Fluid (in Barrels) RWC 802 268.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-09 Produced Fluid (in Barrels) RWC 802 208.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-10 Produced Fluid (in Barrels) RWC 802 238.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-11 Produced Fluid (in Barrels) RWC 802 292.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-12 Produced Fluid (in Barrels) RWC 802 219.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-01 Produced Fluid (in Barrels) RWC 802 15.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018-01 Produced Fluid (in Barrels) RWC 802 35.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-01 Produced Fluid (in Barrels) RWC 802 53.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-01 Produced Fluid (in Barrels) RWC 802 92.50 Bbl REUSE (AT WELL PAD)
2018-02 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-02 Produced Fluid (in Barrels) RWC 802 160.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-02 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2018-03 Produced Fluid (in Barrels) RWC 802 218.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-04 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-04 Produced Fluid (in Barrels) RWC 802 201.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-05 Produced Fluid (in Barrels) RWC 802 39.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-05 Produced Fluid (in Barrels) RWC 802 150.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-06 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-06 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-06 Produced Fluid (in Barrels) RWC 802 192.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-07 Produced Fluid (in Barrels) RWC 802 140.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018-07 Produced Fluid (in Barrels) RWC 802 56.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-08 Produced Fluid (in Barrels) RWC 802 69.17 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018-08 Produced Fluid (in Barrels) RWC 802 140.00 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 40.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-09 Produced Fluid (in Barrels) RWC 802 196.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-09 Produced Fluid (in Barrels) RWC 802 41.67 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-10 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 69.17 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018-11 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-11 Produced Fluid (in Barrels) RWC 802 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 146.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 69.17 Bbl INJECTION DISPOSAL WELL 34-007-21847
2019-01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-01 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 60.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019-03 Produced Fluid (in Barrels) RWC 802 55.00 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019-03 Produced Fluid (in Barrels) RWC 802 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-03 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1946121 Primary Facility 01/27/2011 Routine/Partial Inspection No Violations Noted
1951315 Primary Facility 02/18/2011 Routine/Partial Inspection No Violations Noted
2017568 Primary Facility 11/08/2011 Routine/Complete Inspection Violation(s) Noted An inspection was conducted at the Fisk Hollow Pad B on 11/8/11. The site ID sign and E&S plan and site perimeter were observed. The access road was installed, stabilized and the accociated BMPs functioning. The perimeter BMPs were installed and functioning. The site were stablized. A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis. Violations were cited during this inspection for release of a pollutional substance (25 PA Code 78.57, SWMA 301 and 402 CSL). During the inspection, John Mahaley from PGE showed up on site and shut the valves on the production tanks to stop the release. A voicemail was left for Landon Vanord, Enviromental Technician from PGE, at 1033 on his cell phone making aware of the release. A plan as to how the spill will be remediated is being requested and should be submitted to the Department. - MRN (sw-viols corrected via IR 2017568)
2018737 Primary Facility 11/14/2011 Follow-up Inspection Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the Fisk Hollow Pad B on 11/14/11 to collect samples to confirm the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. There was a puddle in the excavated area showed a field meter reading over 16 mS. A soil sample was collected from the excavated area in front of the production tanks and submitted for SAC 960 analysis. A puddle in the collection channel at the toe of the slope below the production tanks showed a filed meter reading over 2,000 uS. A sample was collected and submitted for SAC 942 analysis. No new violations were cited during this inspection. - MRN
2025377 Primary Facility 12/09/2011 Follow-up Inspection Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the Fisk Hollow Pad B on observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). A hook-up for pumping out the contained fluid was located off the containment and was leaking. On 11/10/11 PGE began the site cleanup. During this inspection, the contaminated soil was seen stored on plastic and was covered awaiting removal. During this inspection, the excavated area remained open, the excavated soil was on-site and cover with plastic. The secondary containment for the three white production tanks, which were empty during this inspection, has been breached in order to excavated soil beneath the liner. A frac tank was on-site and production fluid was being stored there. Field meter reading for Specific Conductivity were taken from the puddles in the excavated area the ditch below the production tanks. No sample were collected because the surface of the puddle were frozen. No new violations were cited during this inspection.
2028650 Primary Facility 12/21/2011 Compliance Evaluation Outstanding Violations - No Viols Req'd During this inspection, the contaminated soil has been transported off-site. During this inspection, the excavated has been backfilled. The secondary containment for the three white production tanks, which were empty during this inspection, is currently being reconstructed, the liner has not been re-installed as of this inspection . A mobile frac tank was on-site and production fluid was being stored there, on secondary containment. Field meter reading for Specific Conductivity were taken from the puddles around the excavated area and the ditch below the production tanks; they did not exibit elevated readings for Secific Conductivity. A pudlle behind the the secondary containment and white production tanks exibited a field conductivity reading of 1,900µS. This must be addressed. No new violations were cited during this inspection. Violations remain outstanding related to the spill. - MRN
2045286 Primary Facility 02/24/2012 Compliance Evaluation Outstanding Violations - No Viols Req'd On Feb. 24, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to observe the progress of the cleanup of a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The ground was frozen and snow covered. Weather conditions were 35 degrees and foggy. The site ID sign, site perimeter and the collection system for the production fluids were observed. There was no signs of erosion noted on-site. There was a puddle located in front of the production fluid tanks that exibited an elevated reading for specific conductivity (approx. 2mS). This was reported via email to PGE the afternoon of Feb. 24, 2012. PGE stated this would be investigated. No new violations were cited during this inspection. . - MRN
2060891 Primary Facility 04/19/2012 Compliance Evaluation No Violations Noted On April 19, 2012 a Compliance Evaluation Inspection was conducted at the Fisk Hollow Pleasant Valley Pad B to resolve the violations associated with a release of a pollutional substance discovered near the production tanks on 11/8/11 (2017568). The excavation area had been backfilled and the were no puddles visible near the containemnt system. The following violations cited in the inpsection report (2017568) referenced above are being resolved.
2106225 Primary Facility 10/10/2012 Routine/Partial Inspection No Violations Noted
2147824 Primary Facility 03/13/2013 Site Restoration No Violations Noted An inspection of the Fisk Hollow Clara Pad B in Clara Township, Potter County was conducted on March 13, 2013 in response to Well Site Restoration Reports received by the Department (for wells 2452, 2453, 2454, 2455, 2456 and 2457) . The last self-inspection conducted on behalf of PGE was on 3/12/13. The site has been re-graded and temporarily stabilized. the applicable Post construction Stormwater BMPs have been installed. The site was determined to not meet the requirements of 25 Pa Code §102.22(a)(2) (i) Permanent Stabilization at this time. A minimum uniform 70% perennial vegetative cover, with a density capable of resisting accelerated erosion and sedimentation was not observed. A follow up inspection will be conducted at a later date to verify the site has been permanently stabilized. The Well Site Restoration Reports will not be approved until that time. No violations were cited during this inspection.
2190381 Primary Facility 07/11/2013 Follow-up Inspection No Violations Noted
2382188 Primary Facility 06/24/2015 Routine/Partial Inspection No Violations Noted Partial inspection of Fisk Hollow Clara Pad B. Site is restored and permanently stabilized. TLT
2485737 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted
2557176 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted
2733668 Primary Facility 2018-05-18 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in prodution
2802399 Primary Facility 2018-11-09 Administrative/File Review No Violations Noted Admin inspection for purpose of linking to a plugging COA.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2017568 624100 11/08/2011 04/19/2012 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis.
2017568 624101 11/08/2011 04/19/2012 78.57 - Failure to post pit approval number Administrative 78.57 (a) - A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis.
2017568 624102 11/08/2011 04/19/2012 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety A release of a pollutional substance was discovered near the production tanks. A hook-up for pumping out the contained fluid was located off the containment and was leaking. A sample was collected and submitted for SAC 942 analysis.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
624100 277433 NOV - Notice of Violation Comply/Closed 04/19/2012
624101 277433 NOV - Notice of Violation Comply/Closed 04/19/2012
624102 277433 NOV - Notice of Violation Comply/Closed 04/19/2012

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/11/2011 02/11/2011 5760.00 2,679,112.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-2 Superior Well Services Acid Inhibitor 2-Butoxyethanol 111-76-2 30.00 0.00035000
Propargyl alcohol 107-19-7 30.00 0.00035000
Isopropanol 67-63-0 30.00 0.00035000
Proprietary Component 7.00 0.00008000
Acid, Hydrochloric (3) Superior Well Services Solvent Hydrochloric acid 7647-01-0 3.00 0.05
KR-153SL Superior Well Services Biocide Ethylene glycol 107-21-1 1.00 0.00964000
Polyethylene glycol 25322-68-3 50.00 0.00482000
Diethylene glycol 111-46-6 3.50 0.00034000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00193000
WFR-3B Superior Well Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.00298000
1,2-Propylene glycol 57-55-6 25.00 0.01
Stoddard solvent 8052-41-3 10.00 0.00745000
Super TSC Superior Well Services Scale Inhibitor Anionic copolymer 10.00 0.00147000
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.00147000
Anionic polymer 10.00 0.00147000
1,2-Propylene glycol 57-55-6 50.00 0.00734000
Sand Superior Well Services Proppant Quartz 14808-60-7 100.00 14.95
Water PGE Carrier/Base Fluid Water 7732-18-5 100.00 83.01

For data sources see[7]