X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20296"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20296
 
| Well ID: 37-111-20296
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743583, -79.357611 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.743583, -79.357611 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 
|-
 
|-
| Well Pad ID: [[149069|149069]]
+
| Municipality: [[Addison Township,_Somerset_County,_Pennsylvania|Addison Township]]
 
|-
 
|-
| Farm/Lease Name: PMG ALLEN UNIT 1H
+
| Operator Name: [[LPR ENERGY LLC]]
 
|-
 
|-
| First Permit Date: 2010-02-25
+
| Well Pad ID: [[149069]]
 
|-
 
|-
| Last Permit Date: 2010-02-25
+
| Farm/Lease Name: PMG ALLEN UNIT 1H
 
|-
 
|-
| Spud Date: 2010-03-24
+
| License Status: Active
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 03/24/2010
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 2/25/2010
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 3
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 39.743583
 
| Latitude: 39.743583
 
|-
 
|-
 
| Longitude: -79.357611
 
| Longitude: -79.357611
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2010-3
+
| 2010
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 64,882.00
 +
| style="text-align: right;" | 24
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2012
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 209,382.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 182
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2014
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 359,927.00
 +
| style="text-align: right;" | 275
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2016
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 243,036.26
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 172,572.00
 +
| style="text-align: right;" | 343
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2018
| style="text-align:right;" | 0.0
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 147,029.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 56,072.00
 +
| style="text-align: right;" | 88
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
|}
| style="text-align:right;" | 64882.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 24.0
+
| title =Oil and Gas Production Reports
| style="text-align:right;" | 0.0
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| style="text-align:right;" | 0.0
+
| date = 2019-03-31
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
| style="text-align:right;" | 0.0
+
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
 +
| 16APRU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 104.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2012-1
+
| 16AUGU
| style="text-align:right;" | 209382.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 262.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16DECU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 615.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
| 2012-2
+
| 16JULU
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 538.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16JUNU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 200.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2013-1
+
| 16MAYU
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 217.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16NOVU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 524.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 
|-
 
|-
| 2013-2
+
| 16OCTU
| style="text-align:right;" | 0.0
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 228.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123SW005
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 16SEPU
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 183.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 
|-
 
|-
| 2014-1
+
| 2010-2
| style="text-align:right;" | 0.0
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3,730.00 Bbl
| style="text-align:right;" | 0.0
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| style="text-align:right;" | 0.0
+
| 34-059-24067
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|-
+
| 2010-2
| 2014-2
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 7,760.00 Bbl
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title = Oil and Gas Historical Production Report
 
| publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2015-05-26
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|-
 
| 2010-3
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 700.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0101508
+
| PA0091472
| FLUID RECOVERY SERVICE FRANKLIN FACILITY
 
| FRANKLIN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 365.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-059-24067
+
| PA0095273
| DAVID R. HILL INC
 
| BYESVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 495.0
+
| style="text-align: right;" | 12,439.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR119
+
| PA0254185
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 495.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| WMGR119
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 
| JOSEPHINE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 240.0
+
| style="text-align: right;" | 240.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
| GROSELLE #2 - SALTYS DISPOSAL WELLS LP
 
| GARRETTSVILLE
 
| OH
 
|-
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 12.0
+
| style="text-align: right;" | 4,729.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0254185
+
| 301353
| RESERVED ENV SVC WASTE WATER TREATMENT FACILITY
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
|-
+
| 2010-3
| 2010-2
+
| Drilling Fluid Waste (in Barrels)
| FRACING FLUID WASTE
+
| style="text-align: right;" | 700.00 Bbl
| style="text-align:right;" | 7.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PA0101508
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
|-
+
| 2011-2
| 2010-2
+
| Produced Fluid (in Barrels)
| PRODUCED FLUID
+
| style="text-align: right;" | 100.00 Bbl
| style="text-align:right;" | 4.0
 
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| WMGR123SW001
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 15.0
+
| style="text-align: right;" | 15,378.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-2-3995
 
| 34-121-2-3995
| HUNTERS  SWIW #5
 
| RENO
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 946.0
+
| style="text-align: right;" | 946.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
 
|  
 
|  
|-
 
|-
 
| 2011-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 100.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,940.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 6,059.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 6,755.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 296.16
+
| style="text-align: right;" | 296.16 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100419
 
| 100419
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,803.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-2
 
| 2012-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 56.0
+
| style="text-align: right;" | 56.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 492.74
+
| style="text-align: right;" | 492.74 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100419
 
| 100419
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
 
| MCCLELLANDTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 355.0
+
| style="text-align: right;" | 355.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 95.0
+
| style="text-align: right;" | 95.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 11.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2014-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 2,727.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2014-1
+
| 2014-2
| PRODUCED FLUID
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 11.67
+
| style="text-align: right;" | 28.33 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2014-2
 
| 2014-2
| FLOWBACK FRACTURING SAND
+
| Fracturing Fluid Waste (in Tons)
| style="text-align:right;" | 58.23
+
| style="text-align: right;" | 58.23 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 76-00-08
 
| 76-00-08
| WASTE MANAGEMENT, INC -  AMERICAN LANDFILL, INC
 
| WAYNESBURG
 
| OH
 
|-
 
 
|-
 
|-
 
| 2014-2
 
| 2014-2
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 28.33
+
| style="text-align: right;" | 70.83 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|  
+
| 2015-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 4,304.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2015-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 13.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2015-1
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 23.48 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2015-1
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 0.11 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 
|-
 
|-
| 2014-2
+
| 2015-1
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 16.67 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 5,986.17 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 70.83
+
| style="text-align: right;" | 13.33 Bbl
| Bbl
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 4,930.67 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
 +
| 2016-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 104.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 217.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 200.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 538.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 262.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 183.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 
|  
 
|  
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,521.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
|}
+
| 2016-10
For data sources see<ref>{{cite web
+
| Produced Fluid (in Barrels) RWC 802
| title = Oil and Gas Historical Waste Report
+
| style="text-align: right;" | 228.00 Bbl
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| date = 2015-05-26
+
| WMGR123SW005
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
|-
| accessdate = 2015-05-26 }}</ref>
+
| 2016-11
== Inspection Data ==
+
| Produced Fluid (in Barrels) RWC 802
{| class="wikitable sortable" width="95%"
+
| style="text-align: right;" | 524.00 Bbl
!scope="col" | INSPECTION ID
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
!scope="col" | DATE
+
| WMGR123SW005
!scope="col" | DESCRIPTION
+
|-
!scope="col" | COMMENT
+
| 2016-12
!scope="col" | VIOLATION ID
+
| Produced Fluid (in Barrels) RWC 802
!scope="col" | VIOLATION CODE
+
| style="text-align: right;" | 615.00 Bbl
!scope="col" | VIOLATION_COMMENT
+
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 744.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 570.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 282.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 442.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 523.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 41.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 320.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 528.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 284.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 202.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 244.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2017-09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 387.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2017-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 63.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2017-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 281.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 41.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 529.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 162.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018-02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 122.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 611.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1873366
+
| 2018-04
| 2010-03-25
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 326.00 Bbl
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site.  The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice.  On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification.  E/S plan and sign at the entrance of the access road.  Sign was missing permit number.  E/S plan was missing site plot and E&S controls plan.  Additional site activity was occurring around pad with no E/S plans and limited E/S controls.  On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release
+
| INJECTION DISPOSAL WELL
| 584177
+
| PAS2D561BSOM
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
|  
 
 
|-
 
|-
 +
| 2018-05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 245.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1873366
+
| 2018-06
| 2010-03-25
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 136.00 Bbl
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site.  The log book was located in the entrance way mail box with the frac transportation hour﾿s invoice.  On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification.  E/S plan and sign at the entrance of the access road.  Sign was missing permit number.  E/S plan was missing site plot and E&S controls plan.  Additional site activity was occurring around pad with no E/S plans and limited E/S controls.  On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release
+
| INJECTION DISPOSAL WELL
| 584177
+
| PAS2D561BSOM
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
|  
 
 
|-
 
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1877308
+
| 2018-07
| 2010-04-08
+
| Produced Fluid (in Barrels) RWC 802
| No Violations Noted
+
| style="text-align: right;" | 22.00 Bbl
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than the required two feet of lined freeboard.  Observed no accelerated erosion & sedimentation in relation to the access road or well-site.  All erosion control BMP﾿s appeared to have been implemented properly.  Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time.
+
| RESIDUAL WASTE PROCESSING FACILITY
|
+
| WMGR123SW005
|  
 
|  
 
 
|-
 
|-
 +
| 2018-07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 196.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 1880296
+
| 2018-08
| 2010-04-23
+
| Produced Fluid (in Barrels) RWC 802
| No Violations Noted
+
| style="text-align: right;" | 76.00 Bbl
| At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence.  No free board issues with pit.  Well connected production equipment.  Swab rig was present at the wellhead.  Heavy equipment was on-site to start restoring site and pits.
+
| INJECTION DISPOSAL WELL
|  
+
| PAS2D561BSOM
|  
 
|
 
 
|-
 
|-
 +
| 2018-08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 791.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 1884554
+
| 2018-09
| 2010-05-12
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 491.00 Bbl
| At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted.  Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
+
| INJECTION DISPOSAL WELL
| 587052
+
| PAS2D561BSOM
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
|  
 
 
|-
 
|-
 +
| 2018-10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 264.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1884554
+
| 2018-10
| 2010-05-12
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 533.00 Bbl
| At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted.  Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
+
| REUSE (AT WELL PAD)
| 587052
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
 
|  
 
|  
 
|-
 
|-
 +
| 2018-11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 151.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
| 1884554
+
| 2018-11
| 2010-05-12
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 152.00 Bbl
| At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted.  Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
+
| REUSE (AT WELL PAD)
| 587053
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
 
|  
 
|  
 
|-
 
|-
 +
| 2018-12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 513.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1884554
+
| 2018-12
| 2010-05-12
+
| Produced Fluid (in Barrels) RWC 802
| Violation(s) Noted
+
| style="text-align: right;" | 27.00 Bbl
| At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted.  Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp﾿s were installed filter sox﾿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
+
| REUSE (AT WELL PAD)
| 587053
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
 
|  
 
|  
 
|-
 
|-
 +
| 2019-01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 620.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1918459
+
| 2019-02
| 2010-10-06
+
| Produced Fluid (in Barrels) RWC 802
| No Violations Noted
+
| style="text-align: right;" | 579.00 Bbl
| At the time of inspection, no E&S or IW discharge issues at the site.  Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit.  E&S controls were in place.  Chief was in the process of flow back and flaring gas well from Fracking procedure.  Due to Chief policy of ﾿fire retardation suites﾿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station.  Based on visual view of the site, the flame was showing no smoke or air quality problems.  The site showed no signs of stress vegetation or air quality problems.  DEP called Chief  (JD Slater ﾿ Compliance Manager).  He reviewed the log for Sunday and showed no reports of site air quality concerns.
+
| INJECTION DISPOSAL WELL
|  
+
| PAS2D561BSOM
|  
 
|  
 
 
|-
 
|-
 +
| 2019-03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 487.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 
|-
 
|-
| 1922566
+
|}
| 2010-10-13
+
For data sources see<ref>{{cite web
| No Violations Noted
+
| title =Oil and Gas Waste Reports
| Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ﾿minor﾿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared).  Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer.
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
|  
+
| date = 2019-03-31
|  
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
|  
+
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 +
| 1873366
 +
| Primary Facility
 +
| 03/25/2010
 +
| Drilling/Alteration
 +
| Violation(s) Noted
 +
| At the time of inspection, no E&S or IW discharge issues at the site.  Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site.  The log book was located in the entrance way mail box with the frac transportation hour¿s invoice.  On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification.  E/S plan and sign at the entrance of the access road.  Sign was missing permit number.  E/S plan was missing site plot and E&S controls plan.  Additional site activity was occurring around pad with no E/S plans and limited E/S controls.  On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located.  No attempt was made to clean the oil release
 
|-
 
|-
| 1922591
+
| 1877308
| 2010-10-14
+
| Primary Facility
 +
| 04/08/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Operator should correct API # on sign, Frac pit w/ adequate free board
+
| Drilling was ongoing at the time of the inspection.  Below grade pit located onsite and it had more than the required two feet of lined freeboard.  Observed no accelerated erosion & sedimentation in relation to the access road or well-site.  All erosion control BMP¿s appeared to have been implemented properly.  Noted that earthmoving activity was ongoing adjacent to the drill pad.  Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1880296
| 1997389
+
| Primary Facility
| 2011-08-04
+
| 04/23/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW discharge issues at the siteWell was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ﾿ 100 bbls brine tanksBoth units located in a containment area.  DEP representatives present were Paul Wyrwas and Marc MaestraMarc inspected the site pad and perimeter of the site pad and found no issues.
+
| At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fenceNo free board issues with pit.   Well connected production equipmentSwab rig was present at the wellheadHeavy equipment was on-site to start restoring site and pits.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1884554
 +
| Primary Facility
 +
| 05/12/2010
 +
| Routine/Complete Inspection
 +
| Violation(s) Noted
 +
| At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted.  Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp¿s were installed filter sox¿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
 
|-
 
|-
| 1997539
+
| 1918459
| 2011-08-04
+
| Primary Facility
 +
| 10/06/2010
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
| Site visit was part of routine inspection.  Paul Wyrwas was present during inspection.
+
| At the time of inspection, no E&S or IW discharge issues at the sitePit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit.   E&S controls were in place.  Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ¿fire retardation suites¿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station.  Based on visual view of the site, the flame was showing no smoke or air quality problems.  The site showed no signs of stress vegetation or air quality problems.  DEP called Chief  (JD Slater ¿ Compliance Manager).  He reviewed the log for Sunday and showed no reports of site air quality concerns.
Well was completed and in production.
 
BMPs were in place and effectively dealing with storm water.
 
Brine and production tanks were in containment dikes and appeared properly constructed.
 
No violations noted at this time.
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 1922566
 +
| Primary Facility
 +
| 10/13/2010
 +
| Complaint Inspection
 +
| No Violations Noted
 +
| Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ¿minor¿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared).  Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer.
 
|-
 
|-
| 2016289
+
| 1922591
| 2011-11-03
+
| Primary Facility
 +
| 10/14/2010
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present.  Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road.  Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event.  No violations noted at time of inspection.
+
| Operator should correct API # on sign, Frac pit w/ adequate free board
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1969535
 
| 1969535
| 2011-04-29
+
| Primary Facility
 +
| 04/29/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues.  Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp﾿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp﾿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed.
+
| At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues.  Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp¿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp¿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1975389
 
| 1975389
| 2011-04-26
+
| Primary Facility
 +
| 04/26/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| well inactive.  process of connecting pipeline
 
| well inactive.  process of connecting pipeline
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1986075
 
| 1986075
| 2011-06-14
+
| Primary Facility
 +
| 06/14/2011
 +
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
 
| review of inactive status.  apporved
 
| review of inactive status.  apporved
|
 
|
 
|
 
 
|-
 
|-
 +
| 1997389
 +
| Primary Facility
 +
| 08/04/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection, no E&S or IW discharge issues at the site.  Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ¿ 100 bbls brine tanks.  Both units located in a containment area.  DEP representatives present were Paul Wyrwas and Marc Maestra.  Marc inspected the site pad and perimeter of the site pad and found no issues.
 +
|-
 +
| 1997539
 +
| Primary Facility
 +
| 08/04/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site visit was part of routine inspection.  Paul Wyrwas was present during inspection.
 +
|-
 +
| 2016289
 +
| Primary Facility
 +
| 11/03/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present.  Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road.  Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event.  No violations noted at time of inspection.
 
|-
 
|-
 
| 2051538
 
| 2051538
| 2012-03-14
+
| Primary Facility
 +
| 03/14/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.
 
| Site visit was part of routine inspection.
Well was drilled and in production.
 
Pad had been rerocked and graded.
 
Freash water impoundment was stable and nearly full of water. 
 
Slopes and ditches were well vegetated both on pad and impoundment.
 
No E&S issues.
 
No violations noted at this time.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2067339
 
| 2067339
| 2012-05-04
+
| Primary Facility
 +
| 05/04/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2069244
 
| 2069244
| 2012-05-18
+
| Primary Facility
 +
| 05/18/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the drill pit and cuttings contained within were being removed.  The Department notes that the well pad area and the access road show no sign of accelerated erosion.  The Department also notes the E&S plan was onsite, implemented as designed, and  properly maintained.
 
| At the time of inspection the drill pit and cuttings contained within were being removed.  The Department notes that the well pad area and the access road show no sign of accelerated erosion.  The Department also notes the E&S plan was onsite, implemented as designed, and  properly maintained.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2070173
 
| 2070173
| 2012-05-10
+
| Primary Facility
 +
| 05/10/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|  At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.  
+
|  At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.
 
 
Site has one well currently drilled and in prodcution. Current operator, Chevron is actively "removing"  a drill pit previously encapsulated by former well owners.  Chevron chose to remove previously encapsulated pit offsite prior drilling additional wells on this location.
 
 
 
  At the time of this inspection, it appears that site and previsously distrubed areas have been stablized, aside from pit, no accelerated erosion or sedimentation issues noted. ES plan implemented and maintained.
 
 
 
Reccomended that operator placed excavated pit materials on/in containment structure while awaiting to be loaded into trucks for disposal. 2nd dept also reccomended that operator ensures trucks are cleaned prior to returning with clean fill for reclamation in order to prevent a possible cross contamination pollution event
 
 
 
No violations noted at this time.
 
 
 
WQS Sam Steingrabe also onsite
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2076225
 
| 2076225
| 2012-06-13
+
| Primary Facility
 +
| 06/13/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed  a drill pit previously encapsulated by former well owners.  Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location.  Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed  
+
| At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed  a drill pit previously encapsulated by former well owners.  Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location.  Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2078166
 
| 2078166
| 2012-06-20
+
| Primary Facility
 +
| 06/20/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled.  During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled."  Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit.
 
| Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled.  During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled."  Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2088107
 
| 2088107
| 2012-08-01
+
| Primary Facility
 +
| 08/01/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection. The site was without issues.
 
| Routine inspection. The site was without issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2092836
 
| 2092836
| 2012-05-24
+
| Primary Facility
 +
| 05/24/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Gas well was in production.  No E&S issues were present during the inspection.
 
| Gas well was in production.  No E&S issues were present during the inspection.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2093088
 
| 2093088
| 2012-06-21
+
| Primary Facility
 +
| 06/21/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2094698
 
| 2094698
| 2012-08-06
+
| Primary Facility
 +
| 08/06/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2094798
 
| 2094798
| 2012-08-14
+
| Primary Facility
 +
| 08/14/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production  
+
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2095561
 
| 2095561
| 2012-08-28
+
| Primary Facility
 +
| 08/28/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production  
+
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2107615
 
| 2107615
| 2012-10-09
+
| Primary Facility
 +
| 10/09/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for  additional wells to be drilled.  The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad area or access road.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
 
| At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for  additional wells to be drilled.  The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan.  No observation of accelerated erosion or sedimentation in relation to the well pad area or access road.  The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2120846
 
| 2120846
| 2012-11-30
+
| Primary Facility
 +
| 11/30/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  
+
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2121603
 
| 2121603
| 2012-11-28
+
| Primary Facility
 +
| 11/28/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection result of spud notification. Multi-well pad.
 
| Inspection result of spud notification. Multi-well pad.
Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site.
 
At the time of this inspection, 1H had been drilled. Actively drilling 5H, cellars for 2H,3H,4H constructed, 6H staked.
 
Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.
 
Observed tophole cuttings along soil pile. Department spoke with company representative who stated plans were to incorporate cuttings into soil pile and disperse across pad. Operator will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.
 
Access road adequately rocked and no E&S issues were noted in relation to access road.  Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2123089
 
| 2123089
| 2012-11-12
+
| Primary Facility
 +
| 11/12/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  
+
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128475
 
| 2128475
| 2012-12-17
+
| Primary Facility
 +
| 12/17/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2128645
 
| 2128645
| 2013-01-08
+
| Primary Facility
 +
| 01/08/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2130307
 
| 2130307
| 2013-01-14
+
| Primary Facility
 +
| 01/14/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
+
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2136131
 
| 2136131
| 2013-01-31
+
| Primary Facility
 +
| 01/31/2013
 +
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
 
| Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143461
 
| 2143461
| 2013-02-11
+
| Primary Facility
 +
| 02/11/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
+
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 6H.
 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2143507
 
| 2143507
| 2013-02-22
+
| Primary Facility
 +
| 02/22/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 6H.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 6H.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2144627
 
| 2144627
| 2013-02-25
+
| Primary Facility
 +
| 02/25/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road.  Department recommends that Operator remove debris from rock-lined ditches.
 
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road.  Department recommends that Operator remove debris from rock-lined ditches.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2151599
 
| 2151599
| 2013-03-13
+
| Primary Facility
 +
| 03/13/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 3H.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 3H.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2168502
 
| 2168502
| 2013-05-22
+
| Primary Facility
 +
| 05/22/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Met with Curtis Small with Chevron and inspected the site. No issues were noted.
 
| Met with Curtis Small with Chevron and inspected the site. No issues were noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2169711
 
| 2169711
| 2013-05-22
+
| Primary Facility
 +
| 05/22/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2173629
 
| 2173629
| 2013-06-10
+
| Primary Facility
 +
| 06/10/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection no issues noted.
 
| Routine inspection no issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228147
 
| 2228147
| 2013-11-26
+
| Primary Facility
 +
| 11/26/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 4H.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 4H.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228305
 
| 2228305
| 2013-10-31
+
| Primary Facility
 +
| 10/31/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 3H.
 
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was drilling gas well 3H.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2228693
 
| 2228693
| 2013-10-09
+
| Primary Facility
 +
| 10/09/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H
 
| At the time of inspection, no E&S issues were present at the site.  Chevron was drilling well 3H
|
 
|
 
|
 
 
|-
 
|-
 +
| 2229875
 +
| Primary Facility
 +
| 09/26/2013
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting up  drilling for well 4H.
 
|-
 
|-
| 2229875
+
| 2235790
| 2013-09-26
+
| Primary Facility
 +
| 01/13/2014
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site.  Chevron was setting up  drilling for well 4H.
+
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2244496
 +
| Primary Facility
 +
| 02/10/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary.
 
|-
 
|-
 
| 2250957
 
| 2250957
| 2013-03-05
+
| Primary Facility
 +
| 03/05/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
| On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
 
The sign was correctly marked.
 
 
No mud was being drug out to the main road.
 
 
Checked in with the guard and donned the required PPE.
 
 
They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline.
 
 
A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak.
 
 
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2252437
 +
| Primary Facility
 +
| 03/10/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 +
|-
 +
| 2298104
 +
| Primary Facility
 +
| 08/20/2014
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was in process of fracking well 5H.  Well 1H was temporary shut in.  Wells 4HA, 3H and 6H have been completed.  Well 2H will be completed the following week.
 +
|-
 +
| 2311107
 +
| Primary Facility
 +
| 10/08/2014
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Work was underway to equip a well for production.  A coil tubing rig was located onsite.  Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
 +
|-
 +
| 2408947
 +
| Primary Facility
 +
| 09/18/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, well tag present and legible.
 +
|-
 +
| 2486256
 +
| Primary Facility
 +
| 2016-05-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running. no issues
 +
|-
 +
| 2532203
 +
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| no issues.  gas wells productions
 +
|-
 +
| 2549713
 +
| Primary Facility
 +
| 2016-12-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well Marcellus pad.
 +
Site ID sign, E&S plan, PPC plan and ERP on site.
 +
At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked.
 +
Well tag present and legible. Brine tank located in secondary containment appears structurally sound.
 +
Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.
 +
|-
 +
| 2594467
 +
| Primary Facility
 +
| 2017-04-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running,.  no issues
 +
|-
 +
| 2594580
 +
| Primary Facility
 +
| 2017-05-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 +
|-
 +
| 2626051
 +
| Primary Facility
 +
| 2017-08-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues.
 +
|-
 +
| 2656126
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running no,issues
 +
|-
 +
| 2672028
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running
 +
|-
 +
| 2672068
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
 
|-
 
|-
| 2235790
+
| 2685362
| 2014-01-13
+
| Primary Facility
 +
| 2018-01-23
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
+
| System producing. Emergency contact present. Well tag present.
 
 
The entrance road to the well pad was well graveled. No mud was being drug out onto the main road.
 
 
 
Checked in with the guard.
 
 
 
Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad.
 
 
 
Walked over to the well pad. The well pad was inspected.
 
 
 
The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked.
 
 
 
Large plastic pipe was being unloaded onto the well pad.
 
 
 
No signs of spills were noticed on the well pad.
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2700747
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tag present and emergency contact information present.  No issues at the site
 
|-
 
|-
| 2244496
+
| 2700825
| 2014-02-10
+
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary.
+
| Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2719552
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
 
|-
 
|-
| 2252437
+
| 2766909
| 2014-03-10
+
| Primary Facility
 +
| 2018-08-23
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
+
| Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.
 
+
|-
The sign was correctly marked.
+
|}
 
+
==== Violations Commited ====
No mud was being drug out to the main road.
+
{| class="wikitable sortable" width="95%"
 
+
!scope="col" | Inspection ID
Checked in with the guard and donned the required PPE.
+
!scope="col" | Violation ID
 
+
!scope="col" | Violation Date
They were preparing the well pad for the frack equipment that will be coming on site.
+
!scope="col" | Date Resolved
 
+
!scope="col" | Violation Code
A road leading up to the Caymen pipeline was  reworked. This will allow the Caymen workers will have access to the pipeline.
+
!scope="col" | Violation Type
 
+
!scope="col" | Violation Comments
The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.
+
|-
 
+
| 1873366
 +
| 584177
 +
| 03/25/2010
 +
| 03/30/2010
 +
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 +
| Administrative
 
|  
 
|  
 +
|-
 +
| 1884554
 +
| 587052
 +
| 05/12/2010
 +
| 08/31/2010
 +
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 +
| Administrative
 
|  
 
|  
 +
|-
 +
| 1884554
 +
| 587053
 +
| 05/12/2010
 +
| 08/31/2010
 +
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 +
| Administrative
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2311107
+
| 584177
| 2014-10-08
+
| 256440
| No Violations Noted
+
| NOV - Notice of Violation
| Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
+
| Comply/Closed
 
|  
 
|  
 +
| 03/30/2010
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 584177
 +
| 260784
 +
| CACP - Consent Assessment of Civil Penalty
 +
| Comply/Closed
 +
| 07/30/2010
 +
| 07/30/2010
 +
| style="text-align: right;" | $2,000.00
 +
| style="text-align: right;" | $2,000.00
 +
|-
 +
| 587052
 +
| 257711
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 09/02/2010
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 587052
 +
| 266666
 +
| CACP - Consent Assessment of Civil Penalty
 +
| Comply/Closed
 +
| 01/10/2011
 +
| 01/10/2011
 +
| style="text-align: right;" | $7,500.00
 +
| style="text-align: right;" | $7,500.00
 +
|-
 +
| 587053
 +
| 257711
 +
| NOV - Notice of Violation
 +
| Comply/Closed
 
|  
 
|  
 +
| 09/02/2010
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 587053
 +
| 266666
 +
| CACP - Consent Assessment of Civil Penalty
 +
| Comply/Closed
 +
| 01/10/2011
 +
| 01/10/2011
 +
| style="text-align: right;" | $7,500.00
 +
| style="text-align: right;" | $7,500.00
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 02:43, 15 July 2019

Well Details

Well ID: 37-111-20296
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 1H
License Status: Active
Spud Date: 03/24/2010
Permit Date: 2/25/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.743583
Longitude: -79.357611

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 64,882.00 24 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 209,382.00 182 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 359,927.00 275 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 243,036.26 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 172,572.00 343 0.00 0 0.00 0
2018 LPR ENERGY LLC 147,029.00 362 0.00 0 0.00 0
2019 LPR ENERGY LLC 56,072.00 88 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
16APRU Produced Fluid (in Barrels) RWC 802 104.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16AUGU Produced Fluid (in Barrels) RWC 802 262.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16DECU Produced Fluid (in Barrels) RWC 802 615.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
16JULU Produced Fluid (in Barrels) RWC 802 538.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16JUNU Produced Fluid (in Barrels) RWC 802 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16MAYU Produced Fluid (in Barrels) RWC 802 217.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16NOVU Produced Fluid (in Barrels) RWC 802 524.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16OCTU Produced Fluid (in Barrels) RWC 802 228.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
16SEPU Produced Fluid (in Barrels) RWC 802 183.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2010-2 Fracing Fluid Waste (in Barrels) 3,730.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2010-2 Fracing Fluid Waste (in Barrels) 7,760.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-2 Fracing Fluid Waste (in Barrels) 365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-2 Fracing Fluid Waste (in Barrels) 12,439.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2010-2 Fracing Fluid Waste (in Barrels) 495.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-2 Fracing Fluid Waste (in Barrels) 240.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2010-2 Produced Fluid (in Barrels) 4,729.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-3 Drilling Fluid Waste (in Barrels) 700.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-2 Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-2 Produced Fluid (in Barrels) 15,378.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011-2 Produced Fluid (in Barrels) 946.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Drilling Fluid Waste (in Barrels) 1,940.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-1 Fracing Fluid Waste (in Barrels) 6,059.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 6,755.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012-2 Drill Cuttings (in Tons) 296.16 Tons LANDFILL 100419
2012-2 Drilling Fluid Waste (in Barrels) 1,803.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-2 Produced Fluid (in Barrels) 56.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-1 Drill Cuttings (in Tons) 492.74 Tons LANDFILL 100419
2013-1 Drilling Fluid Waste (in Barrels) 355.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013-2 Fracing Fluid Waste (in Barrels) 95.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 11.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Fracing Fluid Waste (in Barrels) 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-2 Fracing Fluid Waste (in Barrels) 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Fracturing Fluid Waste (in Tons) 58.23 Tons LANDFILL 76-00-08
2014-2 Produced Fluid (in Barrels) 70.83 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Fracing Fluid Waste (in Barrels) 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-1 Fracing Fluid Waste (in Barrels) 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Fracturing Fluid Waste (in Tons) 23.48 Tons LANDFILL 100592
2015-1 Fracturing Fluid Waste (in Tons) 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2015-1 Produced Fluid (in Barrels) 16.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-1 Produced Fluid (in Barrels) 5,986.17 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 13.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-2 Produced Fluid (in Barrels) 4,930.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-04 Produced Fluid (in Barrels) RWC 802 104.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-05 Produced Fluid (in Barrels) RWC 802 217.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-06 Produced Fluid (in Barrels) RWC 802 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-07 Produced Fluid (in Barrels) RWC 802 538.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-08 Produced Fluid (in Barrels) RWC 802 262.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-09 Produced Fluid (in Barrels) RWC 802 183.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-1 Produced Fluid (in Barrels) RWC 802 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-10 Produced Fluid (in Barrels) RWC 802 228.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-11 Produced Fluid (in Barrels) RWC 802 524.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-12 Produced Fluid (in Barrels) RWC 802 615.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-01 Produced Fluid (in Barrels) RWC 802 744.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-02 Produced Fluid (in Barrels) RWC 802 570.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-03 Produced Fluid (in Barrels) RWC 802 282.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-03 Produced Fluid (in Barrels) RWC 802 442.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-04 Produced Fluid (in Barrels) RWC 802 523.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-04 Produced Fluid (in Barrels) RWC 802 41.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-05 Produced Fluid (in Barrels) RWC 802 320.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-06 Produced Fluid (in Barrels) RWC 802 528.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-07 Produced Fluid (in Barrels) RWC 802 284.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-08 Produced Fluid (in Barrels) RWC 802 202.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-08 Produced Fluid (in Barrels) RWC 802 244.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-08 Produced Fluid (in Barrels) RWC 802 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-09 Produced Fluid (in Barrels) RWC 802 387.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-10 Produced Fluid (in Barrels) RWC 802 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-12 Produced Fluid (in Barrels) RWC 802 281.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-12 Produced Fluid (in Barrels) RWC 802 41.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-01 Produced Fluid (in Barrels) RWC 802 529.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-01 Produced Fluid (in Barrels) RWC 802 162.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-02 Produced Fluid (in Barrels) RWC 802 122.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-03 Produced Fluid (in Barrels) RWC 802 611.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-04 Produced Fluid (in Barrels) RWC 802 326.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-05 Produced Fluid (in Barrels) RWC 802 245.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-06 Produced Fluid (in Barrels) RWC 802 136.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-07 Produced Fluid (in Barrels) RWC 802 45.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-07 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-07 Produced Fluid (in Barrels) RWC 802 196.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-08 Produced Fluid (in Barrels) RWC 802 76.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-08 Produced Fluid (in Barrels) RWC 802 791.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-09 Produced Fluid (in Barrels) RWC 802 491.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-10 Produced Fluid (in Barrels) RWC 802 264.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-10 Produced Fluid (in Barrels) RWC 802 533.00 Bbl REUSE (AT WELL PAD)
2018-11 Produced Fluid (in Barrels) RWC 802 151.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-11 Produced Fluid (in Barrels) RWC 802 152.00 Bbl REUSE (AT WELL PAD)
2018-12 Produced Fluid (in Barrels) RWC 802 513.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-12 Produced Fluid (in Barrels) RWC 802 27.00 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 620.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-02 Produced Fluid (in Barrels) RWC 802 579.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-03 Produced Fluid (in Barrels) RWC 802 487.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1873366 Primary Facility 03/25/2010 Drilling/Alteration Violation(s) Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour¿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release
1877308 Primary Facility 04/08/2010 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control BMP¿s appeared to have been implemented properly. Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time.
1880296 Primary Facility 04/23/2010 Drilling/Alteration No Violations Noted At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits.
1884554 Primary Facility 05/12/2010 Routine/Complete Inspection Violation(s) Noted At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp¿s were installed filter sox¿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
1918459 Primary Facility 10/06/2010 Complaint Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ¿fire retardation suites¿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station. Based on visual view of the site, the flame was showing no smoke or air quality problems. The site showed no signs of stress vegetation or air quality problems. DEP called Chief (JD Slater ¿ Compliance Manager). He reviewed the log for Sunday and showed no reports of site air quality concerns.
1922566 Primary Facility 10/13/2010 Complaint Inspection No Violations Noted Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ¿minor¿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared). Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer.
1922591 Primary Facility 10/14/2010 Routine/Complete Inspection No Violations Noted Operator should correct API # on sign, Frac pit w/ adequate free board
1969535 Primary Facility 04/29/2011 Routine/Complete Inspection No Violations Noted At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp¿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp¿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed.
1975389 Primary Facility 04/26/2011 Routine/Complete Inspection No Violations Noted well inactive. process of connecting pipeline
1986075 Primary Facility 06/14/2011 Administrative/File Review No Violations Noted review of inactive status. apporved
1997389 Primary Facility 08/04/2011 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ¿ 100 bbls brine tanks. Both units located in a containment area. DEP representatives present were Paul Wyrwas and Marc Maestra. Marc inspected the site pad and perimeter of the site pad and found no issues.
1997539 Primary Facility 08/04/2011 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Paul Wyrwas was present during inspection.
2016289 Primary Facility 11/03/2011 Routine/Complete Inspection No Violations Noted During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection.
2051538 Primary Facility 03/14/2012 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2067339 Primary Facility 05/04/2012 Routine/Complete Inspection No Violations Noted
2069244 Primary Facility 05/18/2012 Routine/Complete Inspection No Violations Noted At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained.
2070173 Primary Facility 05/10/2012 Routine/Complete Inspection No Violations Noted At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.
2076225 Primary Facility 06/13/2012 Routine/Complete Inspection No Violations Noted At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed
2078166 Primary Facility 06/20/2012 Routine/Complete Inspection No Violations Noted Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit.
2088107 Primary Facility 08/01/2012 Routine/Complete Inspection No Violations Noted Routine inspection. The site was without issues.
2092836 Primary Facility 05/24/2012 Routine/Complete Inspection No Violations Noted Gas well was in production. No E&S issues were present during the inspection.
2093088 Primary Facility 06/21/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2094698 Primary Facility 08/06/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2094798 Primary Facility 08/14/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2095561 Primary Facility 08/28/2012 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2107615 Primary Facility 10/09/2012 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2120846 Primary Facility 11/30/2012 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2121603 Primary Facility 11/28/2012 Routine/Complete Inspection No Violations Noted Inspection result of spud notification. Multi-well pad.
2123089 Primary Facility 11/12/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2128475 Primary Facility 12/17/2012 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2128645 Primary Facility 01/08/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2130307 Primary Facility 01/14/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
2136131 Primary Facility 01/31/2013 Incident- Response to Accident or Event In Compliance with Policy Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2143461 Primary Facility 02/11/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2143507 Primary Facility 02/22/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H.
2144627 Primary Facility 02/25/2013 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road. Department recommends that Operator remove debris from rock-lined ditches.
2151599 Primary Facility 03/13/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2168502 Primary Facility 05/22/2013 Routine/Complete Inspection No Violations Noted Met with Curtis Small with Chevron and inspected the site. No issues were noted.
2169711 Primary Facility 05/22/2013 Routine/Complete Inspection No Violations Noted
2173629 Primary Facility 06/10/2013 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2228147 Primary Facility 11/26/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
2228305 Primary Facility 10/31/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2228693 Primary Facility 10/09/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H
2229875 Primary Facility 09/26/2013 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H.
2235790 Primary Facility 01/13/2014 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244496 Primary Facility 02/10/2014 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary.
2250957 Primary Facility 03/05/2013 Routine/Complete Inspection No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
2252437 Primary Facility 03/10/2014 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2298104 Primary Facility 08/20/2014 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2311107 Primary Facility 10/08/2014 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408947 Primary Facility 09/18/2015 Routine/Complete Inspection No Violations Noted At time of inspection, well tag present and legible.
2486256 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted system running. no issues
2532203 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted no issues. gas wells productions
2549713 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.

2594467 Primary Facility 2017-04-15 Routine/Complete Inspection No Violations Noted system running,. no issues
2594580 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2626051 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues.
2656126 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running no,issues
2672028 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running
2672068 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685362 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700747 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700825 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719552 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766909 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1873366 584177 03/25/2010 03/30/2010 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative
1884554 587052 05/12/2010 08/31/2010 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1884554 587053 05/12/2010 08/31/2010 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
584177 256440 NOV - Notice of Violation Comply/Closed 03/30/2010
584177 260784 CACP - Consent Assessment of Civil Penalty Comply/Closed 07/30/2010 07/30/2010 $2,000.00 $2,000.00
587052 257711 NOV - Notice of Violation Comply/Closed 09/02/2010
587052 266666 CACP - Consent Assessment of Civil Penalty Comply/Closed 01/10/2011 01/10/2011 $7,500.00 $7,500.00
587053 257711 NOV - Notice of Violation Comply/Closed 09/02/2010
587053 266666 CACP - Consent Assessment of Civil Penalty Comply/Closed 01/10/2011 01/10/2011 $7,500.00 $7,500.00

For data sources see[6]

References