X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20194"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20194
 
| Well ID: 37-131-20194
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.597705, -75.985938 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.597706, -75.985939 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wyoming County, Pennsylvania|Wyoming]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Washington Township, Wyoming County, Pennsylvania|Washington Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Wyoming_County,_Pennsylvania|Wyoming]]
 +
|-
 +
| Municipality: [[Washington Township,_Wyoming_County,_Pennsylvania|Washington Township]]
 
|-
 
|-
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
| Operator Name: [[CARRIZO (MARCELLUS) LLC]]
 
|-
 
|-
| Well Pad ID: [[145304|145304]]
+
| Well Pad ID: [[145304]]
 
|-
 
|-
 
| Farm/Lease Name: YARASAVAGE 5H
 
| Farm/Lease Name: YARASAVAGE 5H
 
|-
 
|-
| First Permit Date: 2011-07-13
+
| License Status: Active
|-
 
| Last Permit Date: 2011-07-13
 
|-
 
| Spud Date: 2011-08-05
 
|-
 
| Unconventional: Yes
 
 
|-
 
|-
| Horizontal: Yes
+
| Spud Date: 08/05/2011
 
|-
 
|-
| Well Status: ACTIVE
+
| Permit Date: 7/13/2011
 
|-
 
|-
| Violations: 0
+
| Unconventional Well: Y
 
|-
 
|-
| Latitude: 41.597705
+
| Configuration: Horizontal Well
 
|-
 
|-
| Longitude: -75.985938
+
| Latitude: 41.597706
 
|-
 
|-
 +
| Longitude: -75.985939
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2011-2
+
| 2011
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 215,452.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 126
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 1,721,874.32
 +
| style="text-align: right;" | 341
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 468,761.31
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 111
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 72,632.07
 +
| style="text-align: right;" | 19
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2017
| style="text-align:right;" | 4907.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 717,778.31
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 186
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2018
 +
| [[CARRIZO (MARCELLUS) LLC]]
 +
| style="text-align: right;" | 879,614.95
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 2019
| style="text-align:right;" | 210545.0
+
| [[CARRIZO (MARCELLUS) LLC]]
| style="text-align:right;" | 123.0
+
| style="text-align: right;" | 146,223.27
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 90
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2014-1
+
| 2012-S01
| style="text-align:right;" | 833203.0
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 171.0
+
| style="text-align: right;" | 1,099.00 Tons
| style="text-align:right;" | 0.0
+
| LANDFILL
| style="text-align:right;" | 0.0
+
| THR029
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 4,028.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2013-S02
| style="text-align:right;" | 890670.0
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 170.0
+
| style="text-align: right;" | 2,798.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123NE003
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 57.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2015-02
+
| 2014-S02
| style="text-align:right;" | 6183.32
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 212.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR119
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 6,025.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 
|-
 
|-
| 2015-01
+
| 2014-S02
| style="text-align:right;" | 4148.87
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 6,025.00 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123NC010
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 194.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2015-03
+
| 2015-M01
| style="text-align:right;" | 14500.11
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 5.0
+
| style="text-align: right;" | 1.07 Bbl
| style="text-align:right;" | 0.0
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| style="text-align:right;" | 0.0
+
| WMGR123
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2015-M02
For data sources see<ref>{{cite web
+
| Produced Fluid (in Barrels)
| title = Oil and Gas Historical Production Report
+
| style="text-align: right;" | 3.21 Bbl
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| date = 2015-05-26
+
| WMGR123NE003
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-1
+
| 2015-M03
| DRILL CUTTINGS
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1.02 Bbl
| Tons
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| LANDFILL
+
| WMGR123NE003
| THR029
 
| TUNNELL HILL RECLAMATION LANDFILL
 
| NEWLEXINGTON
 
| OH
 
 
|-
 
|-
 +
| 2015-M03
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 6.06 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2013-1
+
| 2015-M04
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 109.30 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR HYDRAULIC FRACTURING
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2015-M05
 +
| Basic Sediment (in Barrels)
 +
| style="text-align: right;" | 50.00 Bbl
 +
| LANDFILL
 +
| THR029
 
|-
 
|-
| 2013-2
+
| 2015-M05
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 2.0
+
| style="text-align: right;" | 22.92 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NE003
 
| WMGR123NE003
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2015-M05
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 56.28 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-1
+
| 2015-M06
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 57.0
+
| style="text-align: right;" | 24.45 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123NE003
+
| WMGR123NC010
| SHASKAS SOUTH PAD
 
| MONTROSE
 
| PA
 
 
|-
 
|-
 +
| 2015-M06
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 45.22 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2015-M07
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 212.0
+
| style="text-align: right;" | 27.77 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123
| EUREKA RESOURCES LLC WILLIAMSPORT WATER TREATMENT
 
| WILLIAMSPORT
 
| PA
 
 
|-
 
|-
 +
| 2016-M04
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 9.29 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NE003
 
|-
 
|-
| 2014-2
+
| 2016-M05
| PRODUCED FLUID
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 9.29 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC018
 +
|-
 +
| 2016-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 8.04 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2017-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 85.27 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
| HYDRO RECOVERY LP ANTRIM FACILITY
 
| WELLSBORO
 
| PA
 
 
|-
 
|-
 +
| 2017-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 35.19 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 2014-2
+
| 2017-M03
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 33.52 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| WMGR123NC018
| WMGR0123
+
|-
| HYDRO RECOVERY LP BLOSSBURG FACILITY
+
| 2017-M05
| BLOSSBURG
+
| Produced Fluid (in Barrels) RWC 802
| PA
+
| style="text-align: right;" | 34.97 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2017-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 52.38 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
 +
| 2017-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1.84 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 2014-2
+
| 2017-M07
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 194.0
+
| style="text-align: right;" | 1.79 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| REUSE OTHER THAN ROAD SPREADING
+
| WMGR123NE003
|  
+
|-
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
| 2017-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 50.04 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 +
|-
 +
| 2018-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 52.09 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.08 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M05
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M06
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2018-M08
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2018-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 17.14 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 +
|-
 +
| 2019-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 45.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
| 2019-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 
|-
 
|-
| 15-Jan
+
| 2019-M03
| PRODUCED FLUID
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 0.83
+
| style="text-align: right;" | 30.00 Bbl
| Bbl
+
| RESIDUAL WASTE PROCESSING FACILITY
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| WMGR123NC018
| WMGR0123
 
| HYDRO RECOVERY LP BLOSSBURG FACILITY
 
| BLOSSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2004551
 
| 2004551
| 2011-09-22
+
| Primary Facility
 +
| 09/22/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Getting ready to move in rig.  Putting down containment, moving in tanks,etc.  Will drill the 7H first.
 
| Getting ready to move in rig.  Putting down containment, moving in tanks,etc.  Will drill the 7H first.
20" conductor pipe set.  Have permits.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2014158
 
| 2014158
| 2011-10-25
+
| Primary Facility
 +
| 10/25/2011
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Northeast Ener. Rig 10  Comp. Man - Don Hackford
 
| Northeast Ener. Rig 10  Comp. Man - Don Hackford
Checked drillers log, at 912'  will be cementing tonight, probably.
 
Checked cellar - pumped down.
 
20" cond. set at 30' w/ 4.16 yds (8/7/2011)    dry hole.
 
13 3/8" @ 820' w/ 820 sx Cl A, 15.6 ppg, 30 bbls to surf.  O-TEX  10/24/2011
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2036977
 
| 2036977
| 2012-01-25
+
| Primary Facility
 +
| 01/25/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2049576
 
| 2049576
| 2012-02-27
+
| Primary Facility
 +
| 02/27/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| NE Energy Rig 10,  Comp. Man - Wayne Simon,  drilling at 5458'
 
| NE Energy Rig 10,  Comp. Man - Wayne Simon,  drilling at 5458'
BOP test - 2/19/2012
 
Rig started drilling at 1200' and will try to get to about 7000'.
 
Drilling with air, when quit will load hole with OBM.
 
Checked cellar.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2064963
 
| 2064963
| 2012-04-27
+
| Primary Facility
 +
| 04/27/2012
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Nabors M 61  Comp.Man - Skip McClelland,  checked drillers log, @ 9390'
 
| Nabors M 61  Comp.Man - Skip McClelland,  checked drillers log, @ 9390'
20: @ 30'
 
13 3/8" @ 728' w/ 680 sx
 
9 5/8" @ 1686' w/ 630 sx
 
BOP test - 4/22/12
 
checked cellar - no bubbles
 
area of OBM spill as reported earlier in week, was all on containment.
 
Discussed need to clean up small area of OBM at pipe to hose conection.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2155781
 
| 2155781
| 2013-04-08
+
| Primary Facility
 +
| 04/08/2013
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Rigged up wellhead for fracing, but decided to use a different head.  Set 2 BP's at 5000+ and 6000+'.
 
| Rigged up wellhead for fracing, but decided to use a different head.  Set 2 BP's at 5000+ and 6000+'.
 +
|-
 +
| 2256570
 +
| Primary Facility
 +
| 03/20/2014
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| Test on 5H began this morning at 1015 hours  (72 hour shut-in unless 150 psi comes first)
 +
|-
 +
| 2256577
 +
| Primary Facility
 +
| 03/21/2014
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| 72 hour shut in test:  annuli were shut in at 1015 hours on 3/20/2014
 +
|-
 +
| 2382841
 +
| Primary Facility
 +
| 06/24/2015
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2490764
 +
| Primary Facility
 +
| 2016-06-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2545127
 +
| Primary Facility
 +
| 2016-12-15
 +
| Site Restoration
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 01:25, 18 July 2019

Well Details

Well ID: 37-131-20194
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145304
Farm/Lease Name: YARASAVAGE 5H
License Status: Active
Spud Date: 08/05/2011
Permit Date: 7/13/2011
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.597706
Longitude: -75.985939

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 215,452.00 126 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 1,721,874.32 341 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 468,761.31 111 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 72,632.07 19 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 717,778.31 186 0.00 0 0.00 0
2018 CARRIZO (MARCELLUS) LLC 879,614.95 365 0.00 0 0.00 0
2019 CARRIZO (MARCELLUS) LLC 146,223.27 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Drill Cuttings (in Tons) 1,099.00 Tons LANDFILL THR029
2013-S01 Produced Fluid (in Barrels) 4,028.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 2,798.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014-S01 Produced Fluid (in Barrels) 57.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014-S02 Produced Fluid (in Barrels) 212.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S02 Produced Fluid (in Barrels) 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S02 Produced Fluid (in Barrels) 6,025.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S02 Produced Fluid (in Barrels) 194.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M01 Produced Fluid (in Barrels) 1.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-M02 Produced Fluid (in Barrels) 3.21 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015-M03 Produced Fluid (in Barrels) 1.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015-M03 Produced Fluid (in Barrels) 6.06 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M04 Produced Fluid (in Barrels) 109.30 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M05 Basic Sediment (in Barrels) 50.00 Bbl LANDFILL THR029
2015-M05 Produced Fluid (in Barrels) 22.92 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015-M05 Produced Fluid (in Barrels) 56.28 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M06 Produced Fluid (in Barrels) 24.45 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-M06 Produced Fluid (in Barrels) 45.22 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M07 Produced Fluid (in Barrels) 27.77 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 9.29 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-M12 Produced Fluid (in Barrels) RWC 802 8.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M01 Produced Fluid (in Barrels) RWC 802 85.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M02 Produced Fluid (in Barrels) RWC 802 35.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M03 Produced Fluid (in Barrels) RWC 802 33.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M05 Produced Fluid (in Barrels) RWC 802 34.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M06 Produced Fluid (in Barrels) RWC 802 52.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M07 Produced Fluid (in Barrels) RWC 802 1.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M07 Produced Fluid (in Barrels) RWC 802 1.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017-M12 Produced Fluid (in Barrels) RWC 802 50.04 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 52.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M03 Produced Fluid (in Barrels) RWC 802 17.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M04 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M06 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M10 Produced Fluid (in Barrels) RWC 802 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M11 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M12 Produced Fluid (in Barrels) RWC 802 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019-M01 Produced Fluid (in Barrels) RWC 802 45.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M02 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Produced Fluid (in Barrels) RWC 802 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004551 Primary Facility 09/22/2011 Routine/Complete Inspection No Violations Noted Getting ready to move in rig. Putting down containment, moving in tanks,etc. Will drill the 7H first.
2014158 Primary Facility 10/25/2011 Drilling/Alteration No Violations Noted Northeast Ener. Rig 10 Comp. Man - Don Hackford
2036977 Primary Facility 01/25/2012 Routine/Complete Inspection No Violations Noted
2049576 Primary Facility 02/27/2012 Drilling/Alteration No Violations Noted NE Energy Rig 10, Comp. Man - Wayne Simon, drilling at 5458'
2064963 Primary Facility 04/27/2012 Drilling/Alteration No Violations Noted Nabors M 61 Comp.Man - Skip McClelland, checked drillers log, @ 9390'
2155781 Primary Facility 04/08/2013 Follow-up Inspection No Violations Noted Rigged up wellhead for fracing, but decided to use a different head. Set 2 BP's at 5000+ and 6000+'.
2256570 Primary Facility 03/20/2014 Follow-up Inspection No Violations Noted Test on 5H began this morning at 1015 hours (72 hour shut-in unless 150 psi comes first)
2256577 Primary Facility 03/21/2014 Follow-up Inspection No Violations Noted 72 hour shut in test: annuli were shut in at 1015 hours on 3/20/2014
2382841 Primary Facility 06/24/2015 Routine/Partial Inspection No Violations Noted
2490764 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted
2545127 Primary Facility 2016-12-15 Site Restoration No Violations Noted

For data sources see[6]

References