If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-115-24683 | | Well ID: 34-115-24683 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.609207413, -81.66710738 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | | + | | County: [[Morgan_County,_Ohio|Morgan]] |
|- | |- | ||
− | | | + | | Municipality: [[Center,_Morgan_County,_Ohio|Center]] |
|- | |- | ||
− | | | + | | Operator Name: [[UTICA RESOURCE OPERATING LLC]] |
|- | |- | ||
− | | | + | | Well Pad ID: [[823]] |
|- | |- | ||
− | | | + | | Farm/Lease Name: PALMER |
+ | |- | ||
+ | | License Status: Producing | ||
+ | |- | ||
+ | | License Date: 2014-11-17 | ||
|- | |- | ||
| Spud Date: 2013-11-27 | | Spud Date: 2013-11-27 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[H&P DRILLING]] |
|- | |- | ||
− | | | + | | Final Drill Date: 2014-04-29 |
|- | |- | ||
− | | Well | + | | Well Total Depth: 14987 ft |
|- | |- | ||
− | | | + | | Configuration: Horizontal |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.609207413 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.66710738 |
+ | |} | ||
+ | For data sources see<ref name=RBDMS>{{cite web | ||
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | |} | + | |}--> |
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | + | !scope="col" style="text-align: center"| Production Days | |
− | !scope="col" | ||
− | |||
|- | |- | ||
− | | 2014 | + | | 2014 |
− | | | + | | [[PDC ENERGY INC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 78620 |
− | + | | style="text-align: right;" | 23164 | |
− | + | | style="text-align: right;" | 120 | |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
+ | | 2015 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | style="text-align: right;" | 208179 | ||
+ | | style="text-align: right;" | 22964 | ||
+ | | style="text-align: right;" | 363 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | | + | | [[PDC ENERGY INC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 151999 |
− | + | | style="text-align: right;" | 9962 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
|- | |- | ||
+ | | 2017 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | style="text-align: right;" | 108850 | ||
+ | | style="text-align: right;" | 5978 | ||
+ | | style="text-align: right;" | 358 | ||
|- | |- | ||
− | | | + | | 2018 |
− | | style="text-align:right;" | | + | | [[UTICA RESOURCE OPERATING LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 101429 |
− | | | + | | style="text-align: right;" | 3534 |
− | | | + | | style="text-align: right;" | 364 |
− | | style="text-align:right;" | | + | |- |
− | | style="text-align:right;" | | + | | 2019 |
+ | | [[UTICA RESOURCE OPERATING LLC]] | ||
+ | | style="text-align: right;" | 22719 | ||
+ | | style="text-align: right;" | 966 | ||
+ | | style="text-align: right;" | 90 | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref>{{cite web | + | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web |
− | | title = Ohio | + | | title = Ohio Combined Annual Production Data |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/ | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = 2015- | + | | accessdate = 2019-05-21 }}</ref> |
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 16491 | ||
+ | | style="text-align: right;" | 120 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 11886 | ||
+ | | style="text-align: right;" | 363 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 3855 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[PDC ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 2005 | ||
+ | | style="text-align: right;" | 358 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[UTICA RESOURCE OPERATING LLC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1472 | ||
+ | | style="text-align: right;" | 273 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[UTICA RESOURCE OPERATING LLC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 405 | ||
+ | | style="text-align: right;" | 90 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0397999313 | |
+ | | 2017-01-23 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site and informed me that they had put a new plunger in this well to help with production. There are no issues to report at this time and this well is in production at the time of inspection. | ||
+ | |- | ||
+ | | 0583419501 | ||
+ | | 2018-04-09 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2014. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time. | ||
+ | |- | ||
+ | | 0775787808 | ||
+ | | 2014-01-05 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | I was on location to witness Allied Oilfield Services cement 378 of 20 the surface casing. PDC is using the H & P Flex rig 385. PDC used 4 centralizers. Plug was down at 9:15pm with good cement returns. | ||
|- | |- | ||
| 1050357990 | | 1050357990 | ||
| 2013-11-27 | | 2013-11-27 | ||
− | | | + | | Casing String Witnessed |
− | | I am on site to witness the cementing of the conductor casing. Express Energy Services drilled 36 hole to a depth of 100 | + | | No Violations |
− | + | | I am on site to witness the cementing of the conductor casing. Express Energy Services drilled 36 hole to a depth of 100. Express then cemented 100 of 30 casing in place with 315 sks of class A cement with 2% CaCl. 18 bbl of cement returns to surface. | |
− | |||
− | |||
|- | |- | ||
− | | | + | | 1193968809 |
− | |||
| 2014-07-21 | | 2014-07-21 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| PDC is currently in on Stage 10 of their completion operation. The average treating pressure has been around 6800 psi at 78-80 bbls/min. They are no longer completing both wells (2H and 3H) at the same time but will finish the 3H first before completing the 2H. | | PDC is currently in on Stage 10 of their completion operation. The average treating pressure has been around 6800 psi at 78-80 bbls/min. They are no longer completing both wells (2H and 3H) at the same time but will finish the 3H first before completing the 2H. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1385566018 | | 1385566018 | ||
| 2013-11-27 | | 2013-11-27 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I arrived on location to witness PDC set their conductor casing, however they were having hard time getting the casing into the hole. They have pushed the cement job to the early evening. | | I arrived on location to witness PDC set their conductor casing, however they were having hard time getting the casing into the hole. They have pushed the cement job to the early evening. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1389962172 | | 1389962172 | ||
| 2014-01-17 | | 2014-01-17 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I arrived on location to witness Halliburton cement 5786 | + | | No Violations |
− | + | | I arrived on location to witness Halliburton cement 5786 of 9 5/8 intermediate casing with 1340 sacks of cement. PDC is using the H & P 385 Flex Rig. Upon arrival, operator was circulating the hole and Halliburton was still trying to get their equipment rigged up and running properly at the wellhead. PDC used 21 centralizers. Plug was down at 10:20am and landed at 12:15pm, however the pressure gradually backed off possibly indicating a leak in the plug or loss of cement to formation. There were spacer returns but no cement returns at the surface. The decision was made to leave the head on and wait 8 hours for the cement to set then run a temperature log, collar locator, and gyro in order to determine the condition of the cement. 1/18/2014: Temperature log showed top of cement at 410. They ran a gyro and then skid the rig to begin drilling the 2H. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1396440683 | | 1396440683 | ||
| 2014-04-02 | | 2014-04-02 | ||
− | | | + | | Administrative Inspection |
− | | PDC skid the H & P rig to the 3H and ran cement bond log. The top of cement on the 9 5/8 was actually at 2610 | + | | No Violations |
− | + | | PDC skid the H & P rig to the 3H and ran cement bond log. The top of cement on the 9 5/8 was actually at 2610. They are currently waiting on perf and cement trucks in order to perf at 2580 and set a retainer at 2270. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1397821335 | | 1397821335 | ||
| 2014-04-18 | | 2014-04-18 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Day Gray called and stated they were unable to get their build rates great enough to land so they pulled back and set a kick plug down to 6200 | + | | No Violations |
− | + | | Day Gray called and stated they were unable to get their build rates great enough to land so they pulled back and set a kick plug down to 6200. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1399463346 | | 1399463346 | ||
| 2014-05-07 | | 2014-05-07 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I arrived on location for the operation and safety meetings. At this time the well is producing very little gas. If it is bridged off they will know once the pull on the drill pipe by drag weight. During the operation meeting, it was discussed that PDC personnel will attempt to kill the well followed by the cutting and tripping out the drill pipe. They will then install a packer to control the well. They plan on using a radial cutting tool. Wild Well Control will be at the wellhead to determine the area of mechanical integrity failure. | | I arrived on location for the operation and safety meetings. At this time the well is producing very little gas. If it is bridged off they will know once the pull on the drill pipe by drag weight. During the operation meeting, it was discussed that PDC personnel will attempt to kill the well followed by the cutting and tripping out the drill pipe. They will then install a packer to control the well. They plan on using a radial cutting tool. Wild Well Control will be at the wellhead to determine the area of mechanical integrity failure. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1399563777 | | 1399563777 | ||
| 2014-05-08 | | 2014-05-08 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I was notified en route this morning that the RCT (radial cutting torch) did not succeed in cutting the drill pipe so they set a back off charge and were able to free the drill pipe. They then POOH, installed the packer and TIH. When they were attempting to set the packer, the setting tool failed for unknown reasons, and it fell down hole and is currently on top of the drill pipe (fish). It is currently stuck somewhere around 700 | + | | No Violations |
− | + | | I was notified en route this morning that the RCT (radial cutting torch) did not succeed in cutting the drill pipe so they set a back off charge and were able to free the drill pipe. They then POOH, installed the packer and TIH. When they were attempting to set the packer, the setting tool failed for unknown reasons, and it fell down hole and is currently on top of the drill pipe (fish). It is currently stuck somewhere around 700- | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1405542737 | | 1405542737 | ||
| 2014-07-16 | | 2014-07-16 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I was on location to witness PDC and CalFrac undergo stimulation operations. For the first stage they hydraulically fractured the formation with a breakdown of 5678 psi. The average treating pressure was around 6160 psi with an average rate of 20bbls/minute. | | I was on location to witness PDC and CalFrac undergo stimulation operations. For the first stage they hydraulically fractured the formation with a breakdown of 5678 psi. The average treating pressure was around 6160 psi with an average rate of 20bbls/minute. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1411672530 | | 1411672530 | ||
| 2014-09-25 | | 2014-09-25 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| PDC is currently producing the Palmer 2H and 3H. They were on location hooking up a new separator in order to produce out of the Palmer 44-20 vertical well. | | PDC is currently producing the Palmer 2H and 3H. They were on location hooking up a new separator in order to produce out of the Palmer 44-20 vertical well. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1550587840 | ||
+ | | 2019-02-19 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | I was on location today to do a field inspection on this well. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it. | ||
|- | |- | ||
| 1880710286 | | 1880710286 | ||
| 2014-04-24 | | 2014-04-24 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I stopped by for a rig check. Everything looks good and the H & P flex rig was currently drilling the lateral at a depth of 8795 | + | | No Violations |
− | | | + | | I stopped by for a rig check. Everything looks good and the H & P flex rig was currently drilling the lateral at a depth of 8795. |
− | | | + | |- |
− | | | + | | 2142061850 |
+ | | 2018-04-04 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. | ||
+ | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
− | | | + | | 2014-08-06 |
− | | 2014- | + | | H2O |
− | | | + | | style="text-align: right;" | 15 |
− | | | + | | style="text-align: right;" | 1993 Bbl |
− | | | + | | style="text-align: right;" | 99750 |
− | | | + | | [[CalFrac]] |
− | | | + | | STAGE 39B/39B |
+ | 30 SHOTS | ||
+ | |- | ||
+ | | 2020-07-16 | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 6096 Bbl | ||
+ | | style="text-align: right;" | 237711 | ||
+ | | [[CalFrac]] | ||
+ | | STAGE 1/39B | ||
+ | 30 SHOTS | ||
+ | STAGES 2-39A SEE IMAGES | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2013-11-15 | ||
+ | | Proposed Formations:POINT PLEASANT, Issued Date:11/15/2013, Expired Date:11/15/2015 12:00:00 PM, Drilling unit acres:627, Proposed Well Type:OG, Proposed Well Class:EDPW | ||
+ | |- | ||
+ | | Reached Total Depth | ||
+ | | 2014-04-29 | ||
+ | | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2014-12-12 | ||
+ | | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. | ||
+ | |- | ||
+ | | Correction to Well | ||
+ | | 2015-02-20 | ||
+ | | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED. | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2015-11-15 | ||
+ | | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. | ||
+ | |- | ||
+ | | Change of Owner | ||
+ | | 2018-05-04 | ||
+ | | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2019-01-22 | ||
+ | | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-115-24683 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.609207413,"lon":-81.66710738,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Center | |
Operator Name: UTICA RESOURCE OPERATING LLC | |
Well Pad ID: 823 | |
Farm/Lease Name: PALMER | |
License Status: Producing | |
License Date: 2014-11-17 | |
Spud Date: 2013-11-27 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-04-29 | |
Well Total Depth: 14987 ft | |
Configuration: Horizontal | |
Latitude: 39.609207413 | |
Longitude: -81.66710738 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | 78620 | 23164 | 120 |
2015 | PDC ENERGY INC | 208179 | 22964 | 363 |
2016 | PDC ENERGY INC | 151999 | 9962 | 365 |
2017 | PDC ENERGY INC | 108850 | 5978 | 358 |
2018 | UTICA RESOURCE OPERATING LLC | 101429 | 3534 | 364 |
2019 | UTICA RESOURCE OPERATING LLC | 22719 | 966 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | Brine | 16491 | 120 |
2015 | PDC ENERGY INC | Brine | 11886 | 363 |
2016 | PDC ENERGY INC | Brine | 3855 | 365 |
2017 | PDC ENERGY INC | Brine | 2005 | 358 |
2018 | UTICA RESOURCE OPERATING LLC | Brine | 1472 | 273 |
2019 | UTICA RESOURCE OPERATING LLC | Brine | 405 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0397999313 | 2017-01-23 | Production Wells | No Violations | The inspection this day revealed that this well is equipped with a plunger lift system, a 4 1/2 inch diameter wellhead, 2 inch diameter steel production lines, and 1 1/2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery consist of six (6) 500 barrel steel tanks in a containment dike. Identification for the wells and tanks are posted and in proper order. The well tender for PDC was on site and informed me that they had put a new plunger in this well to help with production. There are no issues to report at this time and this well is in production at the time of inspection. |
0583419501 | 2018-04-09 | Preliminary Restoration | No Violations | I was on location today to do a preliminary restoration on this well. The well has been reporting production since 2014. All of the drilling equipment has been removed and the drilling pits have been filled in. The well is in-compliance at this time. |
0775787808 | 2014-01-05 | Drill / Deepen / Reopen | No Violations | I was on location to witness Allied Oilfield Services cement 378 of 20 the surface casing. PDC is using the H & P Flex rig 385. PDC used 4 centralizers. Plug was down at 9:15pm with good cement returns. |
1050357990 | 2013-11-27 | Casing String Witnessed | No Violations | I am on site to witness the cementing of the conductor casing. Express Energy Services drilled 36 hole to a depth of 100. Express then cemented 100 of 30 casing in place with 315 sks of class A cement with 2% CaCl. 18 bbl of cement returns to surface. |
1193968809 | 2014-07-21 | Drill / Deepen / Reopen | No Violations | PDC is currently in on Stage 10 of their completion operation. The average treating pressure has been around 6800 psi at 78-80 bbls/min. They are no longer completing both wells (2H and 3H) at the same time but will finish the 3H first before completing the 2H. |
1385566018 | 2013-11-27 | Drill / Deepen / Reopen | No Violations | I arrived on location to witness PDC set their conductor casing, however they were having hard time getting the casing into the hole. They have pushed the cement job to the early evening. |
1389962172 | 2014-01-17 | Drill / Deepen / Reopen | No Violations | I arrived on location to witness Halliburton cement 5786 of 9 5/8 intermediate casing with 1340 sacks of cement. PDC is using the H & P 385 Flex Rig. Upon arrival, operator was circulating the hole and Halliburton was still trying to get their equipment rigged up and running properly at the wellhead. PDC used 21 centralizers. Plug was down at 10:20am and landed at 12:15pm, however the pressure gradually backed off possibly indicating a leak in the plug or loss of cement to formation. There were spacer returns but no cement returns at the surface. The decision was made to leave the head on and wait 8 hours for the cement to set then run a temperature log, collar locator, and gyro in order to determine the condition of the cement. 1/18/2014: Temperature log showed top of cement at 410. They ran a gyro and then skid the rig to begin drilling the 2H. |
1396440683 | 2014-04-02 | Administrative Inspection | No Violations | PDC skid the H & P rig to the 3H and ran cement bond log. The top of cement on the 9 5/8 was actually at 2610. They are currently waiting on perf and cement trucks in order to perf at 2580 and set a retainer at 2270. |
1397821335 | 2014-04-18 | Drill / Deepen / Reopen | No Violations | Day Gray called and stated they were unable to get their build rates great enough to land so they pulled back and set a kick plug down to 6200. |
1399463346 | 2014-05-07 | Drill / Deepen / Reopen | No Violations | I arrived on location for the operation and safety meetings. At this time the well is producing very little gas. If it is bridged off they will know once the pull on the drill pipe by drag weight. During the operation meeting, it was discussed that PDC personnel will attempt to kill the well followed by the cutting and tripping out the drill pipe. They will then install a packer to control the well. They plan on using a radial cutting tool. Wild Well Control will be at the wellhead to determine the area of mechanical integrity failure. |
1399563777 | 2014-05-08 | Drill / Deepen / Reopen | No Violations | I was notified en route this morning that the RCT (radial cutting torch) did not succeed in cutting the drill pipe so they set a back off charge and were able to free the drill pipe. They then POOH, installed the packer and TIH. When they were attempting to set the packer, the setting tool failed for unknown reasons, and it fell down hole and is currently on top of the drill pipe (fish). It is currently stuck somewhere around 700- |
1405542737 | 2014-07-16 | Drill / Deepen / Reopen | No Violations | I was on location to witness PDC and CalFrac undergo stimulation operations. For the first stage they hydraulically fractured the formation with a breakdown of 5678 psi. The average treating pressure was around 6160 psi with an average rate of 20bbls/minute. |
1411672530 | 2014-09-25 | Production Wells | No Violations | PDC is currently producing the Palmer 2H and 3H. They were on location hooking up a new separator in order to produce out of the Palmer 44-20 vertical well. |
1550587840 | 2019-02-19 | Production Wells | No Violations | I was on location today to do a field inspection on this well. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. The well did not have any identification on it and is required to because there is multiple wells producing into the same production tanks. The pumper was on location during my inspection so let him know that the well needed legible identification on it. |
1880710286 | 2014-04-24 | Drill / Deepen / Reopen | No Violations | I stopped by for a rig check. Everything looks good and the H & P flex rig was currently drilling the lateral at a depth of 8795. |
2142061850 | 2018-04-04 | Production Wells | No Violations | I am accompanied by Supervisor Dan Goins. We inspected the site for annular pressure monitoring equipment. The well was equipped with gauges for monitoring pressure on the 9.625 and 13.375 casing strings. |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-08-06 | H2O | 15 | 1993 Bbl | 99750 | CalFrac | STAGE 39B/39B
30 SHOTS |
2020-07-16 | H2O | 15 | 6096 Bbl | 237711 | CalFrac | STAGE 1/39B
30 SHOTS STAGES 2-39A SEE IMAGES |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-15 | Proposed Formations:POINT PLEASANT, Issued Date:11/15/2013, Expired Date:11/15/2015 12:00:00 PM, Drilling unit acres:627, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-04-29 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Completion Report Received | 2014-12-12 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Correction to Well | 2015-02-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED. |
Construction Permit Expires | 2015-11-15 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
Change of Owner | 2018-05-04 | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC |
Record Last Modified | 2019-01-22 | FORM 8A N/A, COMPLIANCE NOTICE ISSUED TO UTICA RESOURCE OPERATING (Cert#9489009000276059844967), WELLS DRILLED UNDER PDC ENERGY, INFORMATION WAS NOT TRANSFERRED TO NEW OPERATOR/NEW OPERATOR UNABLE TO OBTAIN SURFACE HOLE ADDITIVES-1/22/19 ALE. |
For data sources see[1]