X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-169-25134"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-169-25134
 
| Well ID: 34-169-25134
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.95236812, -81.81494129 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.952313070, -81.81508392 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Wayne County, Ohio|Wayne]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Wayne_County,_Ohio|Wayne]]
 +
|-
 +
| Municipality: [[Milton_Township,_Wayne_County,_Ohio|Milton Township]]
 
|-
 
|-
 
| Operator Name: [[MORTON SALT INC]]
 
| Operator Name: [[MORTON SALT INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: MORTON SALT {SMP # 4}
 
|-
 
|-
| First Permit Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2013-03-22
 
|-
 
|-
 
| Spud Date: 2009-10-13
 
| Spud Date: 2009-10-13
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[IPSCO]]
 +
|-
 +
| Final Drill Date: 1996-12-10
 +
|-
 +
| Well Total Depth: 5451 ft
 +
|-
 +
| Configuration: Horizontal
 +
|-
 +
| Latitude: 40.952313070
 +
|-
 +
| Longitude: -81.81508392
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| CO
 +
| 1996-10-09
 +
| 3509  MORTON SALT/MORTON INTL  GeoDate  10/9/96
 +
|-
 +
| Solution Mining
 +
| 1996-10-09
 +
| Issued Date 10/9/96 Expired Date 10/9/97 Acres 0000000 Tool Type RTAF Proposed Formation SALINA Proposed Depth 02580 Proposed Drill Depth 02580
 +
|-
 +
| Original Spud
 +
| 1996-11-20
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| Completed
 +
| 1996-12-10
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| Reached Total Depth
 +
| 1996-12-10
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| Annulus Pressure Monitoring Approved
 +
| 1997-01-07
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| Completion Report Received
 +
| 1997-01-09
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| Last Compliance Report
 +
| 2002-07-02
 +
| CHG LOC/XY/ELEV 1-25-97
 +
|-
 +
| APP
 +
| 2008-06-16
 +
| Proposed Formations:SALINA, Issued Date:6/16/2008, Expired Date:6/16/2009 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 +
|-
 +
| APP
 +
| 2009-09-09
 +
| Proposed Formations:SALINA, Issued Date:9/9/2009, Expired Date:9/9/2010 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 +
|-
 +
| Plugged/Abandoned
 +
| 2009-10-14
 +
| CHG LOC/XY/ELEV 1-25-97
 
|-
 
|-
| Configuration: Vertical
+
| Construction Permit Expires
 +
| 2010-09-09
 +
| CHG LOC/XY/ELEV 1-25-97
 
|-
 
|-
| Well Status: Final Restoration
+
| Change of Owner
 +
| 2010-11-29
 +
| Operator changed from 3509, MORTON SALT INC to 8736, MORTON SALT INC
 
|-
 
|-
| Violations: 0
+
| Record Last Modified
 +
| 2017-02-15
 +
| CHG LOC/XY/ELEV 1-25-97
 
|-
 
|-
| Latitude: 40.95236812
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Longitude: -81.81494129
+
| 1999-09-13
 +
| style="text-align: right;" | 2475
 +
| style="text-align: right;" | 2545
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | VIOLATION CODE
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | VIOLATION COMMENT
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| -1006248498
 
| 2013-03-22
 
|
 
| Appears to be in compliance.
 
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|  
 
|  
 +
| NONE
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0029376108
 +
| 2002-05-23
 +
| Solution Mining Project
 +
| No Violations
 +
| Test M.I.T. for 5 year review for U.I.C.  Test passed.
 +
|-
 +
| 0065313807
 +
| 2007-09-12
 +
| Solution Mining Project
 +
| No Violations
 +
| Arrive for MIT and test has failed and is to be retested soon.
 +
|-
 +
| 0260570545
 +
| 2007-09-26
 +
| Solution Mining Project
 +
| No Violations
 +
| Arrive today for M.I.T and found that they had forgot to call me to tell me the test will be Wednesday.
 +
|-
 +
| 0268370907
 +
| 2007-09-28
 +
| Solution Mining Project
 +
| No Violations
 +
| Arrive for M.I.T. and after 6 hrs test was cancelled due to mechanical problems with equipment.
 +
|-
 +
| 0458436064
 +
| 2009-10-13
 +
| Plug / Plug Back
 +
| No Violations
 +
| Whipstock Service company had Superior Wire line set 9 5/8 bridgeplug at 2332 on 10/12/2009 which was a Holiday for us so I did not witness .The 5 1/2 tubing has been pulled from 2350 ft and the last joint was bent and smashed which could be from cave in at that depth.Next load 9 5/8 casing and try and pressure test bridgeplug.3 tests failed .Then had Halliburton set cement plug on top of bridge and shut in for the night.Set 500 ft plug c/w 165 sks from 2332 to 1832 ft.
 +
|-
 +
| 0565827411
 +
| 2010-12-10
 +
| Final Restoration
 +
| No Violations
 +
| Check this well for Erica Freeman and found that it was plugged but needs marker plate with the correct info valves removed before final can be approved. Met with operator and advised that the well be capped with proper permit info and valves be removed.
 +
|-
 +
| 0784562530
 +
| 2009-10-19
 +
| Solution Mining Project
 +
| No Violations
 +
| Check on top of cement and found that it is down 3 ft and there are no leaks at this time.
 
|-
 
|-
 +
| 1006248498
 +
| 2013-03-22
 +
| Final Restoration
 +
| No Violations
 +
| Appears to be in compliance.
 
|-
 
|-
 
| 1193313116
 
| 1193313116
 
| 2007-09-10
 
| 2007-09-10
|  
+
| Solution Mining Project
 +
| No Violations
 
| Arrive for M.I.T. and found that it has been cancelled until Weds.
 
| Arrive for M.I.T. and found that it has been cancelled until Weds.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1226151984
 
| 1226151984
 
| 2007-09-12
 
| 2007-09-12
|  
+
| Solution Mining Project
 +
| No Violations
 
| Test M.I.T today and in the 7 hour the test failed and was stopped by operator. Use well # 41 as reference well.
 
| Test M.I.T today and in the 7 hour the test failed and was stopped by operator. Use well # 41 as reference well.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1309840519
| -1309840519
 
 
| 2007-09-05
 
| 2007-09-05
|  
+
| Solution Mining Project
 +
| No Violations
 
| Check this well to see if operator is pumping interface for M.I.T and did not find anybody in the well field to find out if the test is going to be soon.
 
| Check this well to see if operator is pumping interface for M.I.T and did not find anybody in the well field to find out if the test is going to be soon.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1378343061
 
| 1378343061
 
| 2007-09-10
 
| 2007-09-10
|  
+
| Solution Mining Project
 +
| No Violations
 
| Arrive for M.I.T. today and found they had forgot to call and reshcedule for this Weds.
 
| Arrive for M.I.T. today and found they had forgot to call and reshcedule for this Weds.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1401406901
 
| 1401406901
 
| 2007-10-11
 
| 2007-10-11
|  
+
| Solution Mining Project
 +
| No Violations
 
| Check well today and found no work done to get wells ready to test for M.I.T.
 
| Check well today and found no work done to get wells ready to test for M.I.T.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1451889015
 
| 1451889015
 
| 2009-10-14
 
| 2009-10-14
|  
+
| Plug / Plug Back
 +
| No Violations
 
| Arrive for test after setting cement plug and tests # 1 & 2 failed because swedge was leaking. Make repairs and 3 rd test passed.Tag top of cement at 1812 ft . Halliburton set 2 plug from 1800 to 1500 then continue from 1500 to 1000 - 1000 to 500 and 500 to 0 ft. Need to top off as we ran out just as cement circulated to top and fell back several feet.
 
| Arrive for test after setting cement plug and tests # 1 & 2 failed because swedge was leaking. Make repairs and 3 rd test passed.Tag top of cement at 1812 ft . Halliburton set 2 plug from 1800 to 1500 then continue from 1500 to 1000 - 1000 to 500 and 500 to 0 ft. Need to top off as we ran out just as cement circulated to top and fell back several feet.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1645316472
 
| 1645316472
 
| 2007-10-10
 
| 2007-10-10
|  
+
| Solution Mining Project
 +
| No Violations
 
| Check to see if wells are being worked on today and found that nothing has been done.
 
| Check to see if wells are being worked on today and found that nothing has been done.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1669574741
 
| 1669574741
 
| 2010-04-06
 
| 2010-04-06
|  
+
| Final Restoration
 +
| No Violations
 
| Final Restoration has not been done.
 
| Final Restoration has not been done.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1756215711
| -1756215711
 
 
| 2010-03-09
 
| 2010-03-09
|  
+
| Solution Mining Project
 +
| No Violations
 
| Pits are closed and area needs graded and seeded .Final not ready
 
| Pits are closed and area needs graded and seeded .Final not ready
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2004812552
 
| 2004812552
 
| 2010-06-16
 
| 2010-06-16
|  
+
| Final Restoration
 +
| No Violations
 
| Check on restoration final and found that it is not ready. The plate for top of the well does not have the correct info and there are production valves which need removed.
 
| Check on restoration final and found that it is not ready. The plate for top of the well does not have the correct info and there are production valves which need removed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -2062499377
+
| 2062499377
 
| 2007-09-05
 
| 2007-09-05
|  
+
| Solution Mining Project
 +
| No Violations
 
| Morton Salt is pumping interface for MIT on Thurs or Fri
 
| Morton Salt is pumping interface for MIT on Thurs or Fri
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 2069936020
| -2069936020
 
 
| 2003-12-09
 
| 2003-12-09
|  
+
| Solution Mining Project
 +
| No Violations
 
| CHECKED ID - OK
 
| CHECKED ID - OK
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2079472919
 
| 2079472919
 
| 2007-09-28
 
| 2007-09-28
|  
+
| Solution Mining Project
 +
| No Violations
 
| Arrive to test M.I.T. and after 7 hours test was stopped.Had leak between tubing and valve.
 
| Arrive to test M.I.T. and after 7 hours test was stopped.Had leak between tubing and valve.
|
 
|
 
|
 
|-
 
|-
 
| -260570545
 
| 2007-09-26
 
|
 
| Arrive today for M.I.T and found that they had forgot to call me to tell me the test will be Wednesday.
 
|
 
|
 
|
 
|-
 
|-
 
| 268370907
 
| 2007-09-28
 
|
 
| Arrive for M.I.T. and after 6 hrs test was cancelled due to mechanical problems with equipment.
 
|
 
|
 
|
 
 
|-
 
|-
|-
+
| iANGE00015
| 29376108
 
| 2002-05-23
 
|
 
| Test M.I.T. for 5 year review for U.I.C.  Test passed.
 
|
 
|
 
|
 
|-
 
|-
 
| 458436064
 
| 2009-10-13
 
|
 
| Whipstock Service company had Superior Wire line set 9 5/8 bridgeplug at 2332 on 10/12/2009 which was a Holiday for us so I did not witness .The 5 1/2 tubing has been pulled from 2350 ft and the last joint was bent and smashed which could be from cave in at that depth.Next load 9 5/8 casing and try and pressure test bridgeplug.3 tests failed .Then had Halliburton set cement plug on top of bridge and shut in for the night.Set 500 ft plug c/w 165 sks from 2332 to 1832 ft.
 
|
 
|
 
|
 
|-
 
|-
 
| 565827411
 
| 2010-12-10
 
|
 
| Check this well for Erica Freeman and found that it was plugged but needs marker plate with the correct info valves removed before final can be approved. Met with operator and advised that the well be capped with proper permit info and valves be removed.
 
|
 
|
 
|
 
|-
 
|-
 
| -65313807
 
| 2007-09-12
 
|
 
| Arrive for MIT and test has failed and is to be retested soon.
 
|
 
|
 
|
 
|-
 
|-
 
| 784562530
 
| 2009-10-19
 
|
 
| Check on top of cement and found that it is down 3 ft and there are no leaks at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| iANGE000153
 
 
| 1997-08-01
 
| 1997-08-01
|  
+
| Preliminary Restoration
|  
+
| No Violations
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 15:27, 24 July 2019

Well Details

Well ID: 34-169-25134
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Milton Township
Operator Name: MORTON SALT INC
Well Pad ID:
Farm/Lease Name: MORTON SALT {SMP # 4}
License Status: Final Restoration
License Date: 2013-03-22
Spud Date: 2009-10-13
Spud Drilling Contractor: IPSCO
Final Drill Date: 1996-12-10
Well Total Depth: 5451 ft
Configuration: Horizontal
Latitude: 40.952313070
Longitude: -81.81508392

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1996-10-09 3509 MORTON SALT/MORTON INTL GeoDate 10/9/96
Solution Mining 1996-10-09 Issued Date 10/9/96 Expired Date 10/9/97 Acres 0000000 Tool Type RTAF Proposed Formation SALINA Proposed Depth 02580 Proposed Drill Depth 02580
Original Spud 1996-11-20 CHG LOC/XY/ELEV 1-25-97
Completed 1996-12-10 CHG LOC/XY/ELEV 1-25-97
Reached Total Depth 1996-12-10 CHG LOC/XY/ELEV 1-25-97
Annulus Pressure Monitoring Approved 1997-01-07 CHG LOC/XY/ELEV 1-25-97
Completion Report Received 1997-01-09 CHG LOC/XY/ELEV 1-25-97
Last Compliance Report 2002-07-02 CHG LOC/XY/ELEV 1-25-97
APP 2008-06-16 Proposed Formations:SALINA, Issued Date:6/16/2008, Expired Date:6/16/2009 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
APP 2009-09-09 Proposed Formations:SALINA, Issued Date:9/9/2009, Expired Date:9/9/2010 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Plugged/Abandoned 2009-10-14 CHG LOC/XY/ELEV 1-25-97
Construction Permit Expires 2010-09-09 CHG LOC/XY/ELEV 1-25-97
Change of Owner 2010-11-29 Operator changed from 3509, MORTON SALT INC to 8736, MORTON SALT INC
Record Last Modified 2017-02-15 CHG LOC/XY/ELEV 1-25-97

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-09-13 2475 2545 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 NONE

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0029376108 2002-05-23 Solution Mining Project No Violations Test M.I.T. for 5 year review for U.I.C. Test passed.
0065313807 2007-09-12 Solution Mining Project No Violations Arrive for MIT and test has failed and is to be retested soon.
0260570545 2007-09-26 Solution Mining Project No Violations Arrive today for M.I.T and found that they had forgot to call me to tell me the test will be Wednesday.
0268370907 2007-09-28 Solution Mining Project No Violations Arrive for M.I.T. and after 6 hrs test was cancelled due to mechanical problems with equipment.
0458436064 2009-10-13 Plug / Plug Back No Violations Whipstock Service company had Superior Wire line set 9 5/8 bridgeplug at 2332 on 10/12/2009 which was a Holiday for us so I did not witness .The 5 1/2 tubing has been pulled from 2350 ft and the last joint was bent and smashed which could be from cave in at that depth.Next load 9 5/8 casing and try and pressure test bridgeplug.3 tests failed .Then had Halliburton set cement plug on top of bridge and shut in for the night.Set 500 ft plug c/w 165 sks from 2332 to 1832 ft.
0565827411 2010-12-10 Final Restoration No Violations Check this well for Erica Freeman and found that it was plugged but needs marker plate with the correct info valves removed before final can be approved. Met with operator and advised that the well be capped with proper permit info and valves be removed.
0784562530 2009-10-19 Solution Mining Project No Violations Check on top of cement and found that it is down 3 ft and there are no leaks at this time.
1006248498 2013-03-22 Final Restoration No Violations Appears to be in compliance.
1193313116 2007-09-10 Solution Mining Project No Violations Arrive for M.I.T. and found that it has been cancelled until Weds.
1226151984 2007-09-12 Solution Mining Project No Violations Test M.I.T today and in the 7 hour the test failed and was stopped by operator. Use well # 41 as reference well.
1309840519 2007-09-05 Solution Mining Project No Violations Check this well to see if operator is pumping interface for M.I.T and did not find anybody in the well field to find out if the test is going to be soon.
1378343061 2007-09-10 Solution Mining Project No Violations Arrive for M.I.T. today and found they had forgot to call and reshcedule for this Weds.
1401406901 2007-10-11 Solution Mining Project No Violations Check well today and found no work done to get wells ready to test for M.I.T.
1451889015 2009-10-14 Plug / Plug Back No Violations Arrive for test after setting cement plug and tests # 1 & 2 failed because swedge was leaking. Make repairs and 3 rd test passed.Tag top of cement at 1812 ft . Halliburton set 2 plug from 1800 to 1500 then continue from 1500 to 1000 - 1000 to 500 and 500 to 0 ft. Need to top off as we ran out just as cement circulated to top and fell back several feet.
1645316472 2007-10-10 Solution Mining Project No Violations Check to see if wells are being worked on today and found that nothing has been done.
1669574741 2010-04-06 Final Restoration No Violations Final Restoration has not been done.
1756215711 2010-03-09 Solution Mining Project No Violations Pits are closed and area needs graded and seeded .Final not ready
2004812552 2010-06-16 Final Restoration No Violations Check on restoration final and found that it is not ready. The plate for top of the well does not have the correct info and there are production valves which need removed.
2062499377 2007-09-05 Solution Mining Project No Violations Morton Salt is pumping interface for MIT on Thurs or Fri
2069936020 2003-12-09 Solution Mining Project No Violations CHECKED ID - OK
2079472919 2007-09-28 Solution Mining Project No Violations Arrive to test M.I.T. and after 7 hours test was stopped.Had leak between tubing and valve.
iANGE00015 1997-08-01 Preliminary Restoration No Violations

For data sources see[5]

References