If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 1999- | + | | License Date: 1999-02-01 |
|- | |- | ||
| Spud Date: 1999-02-03 | | Spud Date: 1999-02-03 |
Well ID: 34-151-25129 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.802838461,"lon":-81.47305871,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Perry Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: CLIMO | |
License Status: Producing | |
License Date: 1999-02-01 | |
Spud Date: 1999-02-03 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 1999-02-10 | |
Well Total Depth: 4794 ft | |
Configuration: Directional | |
Latitude: 40.802838461 | |
Longitude: -81.47305871 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-02-01 | Proposed Formations:CLINTON, Issued Date:2/1/99, Expired Date:2/1/00 6:00:00 AM, Drilling unit acres:57.02, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1999-02-03 | RBDMS Rec |
Completed | 1999-02-10 | RBDMS Rec |
Reached Total Depth | 1999-02-10 | RBDMS Rec |
Completion Report Received | 1999-03-12 | RBDMS Rec |
Construction Permit Expires | 2000-02-01 | RBDMS Rec |
Correction to Well | 2000-05-05 | CHANGE IN TARGET INFORMATION: FOOTAGE--800'NL & 356.62'EL OF NW 1/4,SEC.10; X= 2,283,427 AND Y= 415,653. CHANGE IN SURFACE FOOTAGE-- 853'NL & 515.87'WL OF NE 1/4,SEC. 10 |
Correction to Well | 2002-04-05 | CHANGE IN SURFACE & TARGET FOOTAGES: SURFACE -- 853'NL & 510'WL OF NW QTR.,SEC. 10 AND TARGET--800'NL & 355'EL OF NW QTR.,SEC. 10. DRILL UNIT REDUCED TO 52.38 ACRES. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1999-06-07 | 4552 | 4607 | 70 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 120000 Gal | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | EVERFLOW EASTERN PTNS L P | 5676 | 1174 | 152 |
2001 | EVERFLOW EASTERN PTNS L P | 11616 | 1871 | 365 |
2002 | EVERFLOW EASTERN PTNS L P | 6522 | 1394 | 365 |
2003 | EVERFLOW EASTERN PTNS L P | 8182 | 1527 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | 8210 | 1225 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | 6852 | 940 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | 2201 | 598 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | 2027 | 426 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | 1124 | 635 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 2449 | 645 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 2208 | 564 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 1641 | 453 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 1977 | 468 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | 2105 | 419 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 2182 | 372 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | 2456 | 340 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 224 | 129 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 1867 | 395 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 1997 | 326 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | EVERFLOW EASTERN PTNS L P | Brine | 330 | 152 |
2001 | EVERFLOW EASTERN PTNS L P | Brine | 90 | 365 |
2002 | EVERFLOW EASTERN PTNS L P | Brine | 180 | 365 |
2003 | EVERFLOW EASTERN PTNS L P | Brine | 167 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | Brine | 46 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | Brine | 23 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | Brine | 10 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 28 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 8 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 10 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 21 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 10 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 19 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 22 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
001288i303 | 2002-02-28 | Production Wells | No Violations | Routine inspection revealed no violations at this time . |
iDIAN00401 | 2000-05-09 | Preliminary Restoration | No Violations |
For data sources see[9]