X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25271"

m
m
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2002-08-21
+
| License Date: 2002-05-28
 
|-
 
|-
 
| Spud Date: 2002-06-13
 
| Spud Date: 2002-06-13

Revision as of 04:07, 26 July 2019

Well Details

Well ID: 34-151-25271
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Perry Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: CLIMO UNIT
License Status: Producing
License Date: 2002-05-28
Spud Date: 2002-06-13
Spud Drilling Contractor: LANDOGS DRILLING
Final Drill Date: 2002-06-20
Well Total Depth: 5006 ft
Configuration: Directional
Latitude: 40.803357534
Longitude: -81.47308680

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2002-05-28 Proposed Formations:CLINTON, Issued Date:5/28/2002, Expired Date:5/28/2003 6:00:00 AM, Drilling unit acres:119.87, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2002-06-13 RBDMS Rec
Completed 2002-06-20 RBDMS Rec
Reached Total Depth 2002-06-20 RBDMS Rec
Completion Report Received 2002-07-17 RBDMS Rec
Correction to Well 2002-08-02 CHANGE IN TARGET INFORMATION: 303'SL & 1239'EL OF SEC. 3; X= 2,285,400
Construction Permit Expires 2003-05-28 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-08-21 4726 4787 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 2905 Bbl 80000 1000 GALLONS HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2002 EVERFLOW EASTERN PTNS L P 2442 777 91
2003 EVERFLOW EASTERN PTNS L P 13784 2285 365
2004 EVERFLOW EASTERN PTNS L P 11808 1715 365
2005 EVERFLOW EASTERN PTNS L P 11069 1307 365
2006 EVERFLOW EASTERN PTNS L P 8230 1091 365
2007 EVERFLOW EASTERN PTNS L P 3446 342 365
2008 EVERFLOW EASTERN PTNS L P 7054 809 365
2009 EVERFLOW EASTERN PTNS L P 4668 501 365
2010 EVERFLOW EASTERN PTNS L P 5707 695 365
2011 EVERFLOW EASTERN PTNS L P 5171 592 365
2012 EVERFLOW EASTERN PTNS L P 6081 566 366
2013 EVERFLOW EASTERN PTNS L P 5680 590 365
2014 EVERFLOW EASTERN PTNS L P 5437 520 365
2015 EVERFLOW EASTERN PTNS L P 3512 358 365
2016 EVERFLOW EASTERN PTNS L P 195 23 365
2017 EVERFLOW EASTERN PTNS L P 2474 557 365
2018 EVERFLOW EASTERN PTNS L P 3236 527 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2002 EVERFLOW EASTERN PTNS L P Brine 240 91
2003 EVERFLOW EASTERN PTNS L P Brine 178 365
2004 EVERFLOW EASTERN PTNS L P Brine 36 365
2005 EVERFLOW EASTERN PTNS L P Brine 12 365
2006 EVERFLOW EASTERN PTNS L P Brine 8 365
2007 EVERFLOW EASTERN PTNS L P Brine 5 365
2008 EVERFLOW EASTERN PTNS L P Brine 23 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 33 365
2011 EVERFLOW EASTERN PTNS L P Brine 9 365
2012 EVERFLOW EASTERN PTNS L P Brine 18 366
2013 EVERFLOW EASTERN PTNS L P Brine 20 365
2014 EVERFLOW EASTERN PTNS L P Brine 10 365
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 18 365
2017 EVERFLOW EASTERN PTNS L P Brine 21 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

References