X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-031-23692"

m
m
Line 21: Line 21:
 
| License Status: Final Restoration
 
| License Status: Final Restoration
 
|-
 
|-
| License Date: 1998-07-02
+
| License Date: 1997-05-29
 
|-
 
|-
 
| Spud Date: 1980-06-16
 
| Spud Date: 1980-06-16

Revision as of 11:57, 26 July 2019

Well Details

Well ID: 34-031-23692
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Clark Township
Operator Name: ROYALTY ENTERPRISES INC
Well Pad ID:
Farm/Lease Name: CATLIN WH
License Status: Final Restoration
License Date: 1997-05-29
Spud Date: 1980-06-16
Spud Drilling Contractor:
Final Drill Date: 1980-07-22
Well Total Depth: 3830 ft
Configuration: Vertical
Latitude: 40.387275210
Longitude: -81.91740615

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1980-06-16 R.I. 7-17-80 IP.A.F. & TR. WR.
CO 1980-07-17 627 KENOIL GeoDate 7/17/80
Completed 1980-07-22 R.I. 7-17-80 IP.A.F. & TR. WR.
Reached Total Depth 1980-07-22 R.I. 7-17-80 IP.A.F. & TR. WR.
CO 1997-05-29 627 KENOIL GeoDt 5/29/97
Unknown 1997-05-29 Issued Date 5/29/97 Expired Date 5/29/98 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date
Plugged/Abandoned 1997-06-30 R.I. 7-17-80 IP.A.F. & TR. WR.
Change of Owner 2002-07-22 Operator changed from 627, KENOIL to 4484, ROYALTY ENTERPRISES INC
Record Last Modified 2013-03-14 R.I. 7-17-80 IP.A.F. & TR. WR.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3742 3815 84

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1100 Bbl 25000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 JADOIL INC D VERNAU 710 300 0
1985 JADOIL INC D VERNAU 1748 147 365
1986 JADOIL INC D VERNAU 2685 105 365
1987 JADOIL INC D VERNAU 454 40 250
1988 JADOIL INC D VERNAU 187 0 250
1989 JADOIL INC D VERNAU 145 0 200
1990 RUFFNER PETROLEUM CORP 0 0 0
1991 KENOIL LLC 0 0 365
1992 RUFFNER PETROLEUM CORP 0 12 61
1993 KENOIL LLC 95 70 365
1994 KENOIL LLC 103 0 0
1995 KENOIL LLC 91 0 0
1996 KENOIL LLC 101 0 0
1997 KENOIL LLC 26 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 JADOIL INC D VERNAU Brine 95 0
1985 JADOIL INC D VERNAU Brine 190 365
1986 JADOIL INC D VERNAU Brine 478 365
1987 JADOIL INC D VERNAU Brine 285 250
1988 JADOIL INC D VERNAU Brine 605 250
1989 JADOIL INC D VERNAU Brine 0 200
1990 RUFFNER PETROLEUM CORP Brine 0 0
1991 KENOIL LLC Brine 205 365
1992 RUFFNER PETROLEUM CORP Brine 0 61
1993 KENOIL LLC Brine 0 365
1994 KENOIL LLC Brine 80 0
1995 KENOIL LLC Brine 0 0
1996 KENOIL LLC Brine 0 0
1997 KENOIL LLC Brine 105 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0551406038 2016-09-13 Final Restoration No Violations On the day of my inspection I found that the 100 barrel steel tank was still in place. I called Clayton King, and he gave me more excuses as to why he hasnt completed the restoration. I told Clayton that he must get it done, no more excuses, no more promises. I warned him that if he did not make this a top priority and get it finished very soon, I would peruse a chiefs order. He said that he would be out today.
iANGE00149 1998-07-02 Final Restoration No Violations

For data sources see[9]

References