If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2009-06-26 |
|- | |- | ||
| Spud Date: 2009-07-21 | | Spud Date: 2009-07-21 |
Well ID: 34-153-23085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.105391981,"lon":-81.58850116,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Copley Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: AKRON-ZAZO | |
License Status: Producing | |
License Date: 2009-06-26 | |
Spud Date: 2009-07-21 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2009-07-26 | |
Well Total Depth: 3993 ft | |
Configuration: Directional | |
Latitude: 41.105391981 | |
Longitude: -81.58850116 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-06-26 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:6/26/2009, Expired Date:6/26/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-07-26 | |
Correction to Well | 2009-10-09 | CORRECTION TO TARGET FOOTAGE--NEW FOOTAGE: 125'NL & 285'WL OF LOT 9, PORTAGE TOWNSHIP; X= 2,251,585; Y= 525,935; ELEV= 965 (AS DRILLED SURVEY). |
Completion Report Received | 2009-10-20 | |
Construction Permit Expires | 2010-06-26 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-01-08 | 3747 | 3809 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 90995 Gal | 80000 | 250M SCF NITROGEN ASSIST |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | GONZOIL INC | 24994 | 706 | 365 |
2011 | GONZOIL INC | 23157 | 426 | 365 |
2012 | GONZOIL INC | 19560 | 320 | 366 |
2013 | GONZOIL INC | 16486 | 319 | 365 |
2014 | GONZOIL INC | 12195 | 210 | 365 |
2015 | GONZOIL INC | 11170 | 214 | 365 |
2016 | GONZOIL INC | 9171 | 238 | 365 |
2017 | GONZOIL INC | 10128 | 115 | 365 |
2018 | GONZOIL INC | 7558 | 157 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | GONZOIL INC | Brine | 418 | 365 |
2011 | GONZOIL INC | Brine | 177 | 365 |
2012 | GONZOIL INC | Brine | 71 | 366 |
2013 | GONZOIL INC | Brine | 55 | 365 |
2014 | GONZOIL INC | Brine | 67 | 365 |
2015 | GONZOIL INC | Brine | 36 | 365 |
2016 | GONZOIL INC | Brine | 35 | 365 |
2017 | GONZOIL INC | Brine | 49 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0142856789 | 2009-07-15 | Drill / Deepen / Reopen | No Violations | The location is built and waiting for Wildcat Drilling. The rig is scheduled to move on 7/20. |
0723516391 | 2009-07-22 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The drilling pits are fenced, lined and in good condition. No violations at this time. |
0801815174 | 2010-04-20 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
0908930517 | 2009-08-13 | Drill / Deepen / Reopen | No Violations | The well has been fraced and the site has been rough graded. Tank battery equipment is being delivered. |
1177193682 | 2009-07-30 | Drill / Deepen / Reopen | No Violations | Dailey Exavating and ChemTech were on site to solidify the drilling pits. |
1248890429 | 2009-07-21 | Drill / Deepen / Reopen | No Violations | Wildcat will be drilling later this morning and should be ready to set surface casing later tonight. The shale pit liner has been cut by demolition debris in the pit and will be replaced before drilling begins. |
1249394434 | 2009-07-28 | Drill / Deepen / Reopen | No Violations | The drilling pits are fenced, lined and in good condition. They are also being pumped down prior to solidification which is scheduled for 7/30. |
1259080617 | 2009-11-17 | Production Wells | No Violations | The well is in production and the affected areas have been seeded andmulched and are growing. Preliminary restoration should be approved by early spring at the latest. |
1526497695 | 2018-05-16 | UrbanProduction Wells | No Violations | Access was gained on a gravel road to the wellhead and tank battery. The well was operated as a plunger lift well. The wellhead was fenced, screened and locked. Urbanized I. D. signage was posted. The 8.625 annular manifold was tied into the flow line and had a motor valve inline. The tank battery was fenced, screened and locked. It was surrounded with an earthen dike. Urbanized I. D. signage was posted on the fence. The tank battery equipment included one (1) 100 barrel stock tank, one (1) 30 barrel poly brine tank and one (1) 2408 horizontal separator. The 100 barrel stock had had a pressure relief valve, lightning arrestor and carbon filter. Proper spacing was observed between the equipment. The load lines were plugged and locked. I did not identify any leaks or contamination during this inspection. No violations found. |
For data sources see[9]