If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Well Drilled | | License Status: Well Drilled | ||
|- | |- | ||
− | | License Date: 2018- | + | | License Date: 2018-03-16 |
|- | |- | ||
| Spud Date: 2018-05-17 | | Spud Date: 2018-05-17 |
Well ID: 34-153-23179 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.017801965,"lon":-81.55864082,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON (SMP #4) | |
License Status: Well Drilled | |
License Date: 2018-03-16 | |
Spud Date: 2018-05-17 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2018-06-20 | |
Well Total Depth: 4355 ft | |
Configuration: Directional | |
Latitude: 41.017801965 | |
Longitude: -81.55864082 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-16 | Proposed Formations:SALINA, Issued Date:3/16/2018, Expired Date:3/16/2019, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2018-06-20 | |
Record Last Modified | 2018-08-15 | |
Construction Permit Expires | 2019-03-16 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0422203246 | 2019-01-04 | Solution Mining Project | No Violations | |
0586649358 | 2018-04-24 | Not Drilled | No Violations | I found Cargill has begun clearing the site for the well pad. Trees have been cut down and stockpiled. |
0861550703 | 2018-05-01 | Not Drilled | No Violations | I found HAD Drilling constructing the well pad for Cargill, Inc. A steel cellar has been installed. I instructed HAD to dig a trench along the entire south side of the well pad and install a filter sock between the well pad and wetland area. There are no violations at this time. |
1045582777 | 2018-05-16 | Not Drilled | No Violations | I found HAD Drilling moving the rig and equipment from City of Akron #80 to this location. There are no violations at this time. |
1525873083 | 2018-05-09 | Not Drilled | No Violations | I found the well pad completed and the steel cellar in place. A filter sock still needs to be put in place between the well pad and wetlands. |
1528141147 | 2018-06-04 | Solution Mining Project | No Violations | H A D Drilling Rig # 247 was standing by waiting for three (3) inch drill pipe. The lateral section was to be drilled with 2.875 tubing, after the rate of penetration slowed the Operator decided additional weight was required to drill the lateral. |
1528469772 | 2018-05-30 | Drill / Deepen / Reopen | No Violations | HADD Rig 249 drilled a 9-7/8 well bore to a total depth of 3060 and ran a total of 78 joints 3051.12 of 7 23lb/ft of K-55 LTC casing with float shoe and a float collar and ten (10) centralizers. Schlumberger pumped 1300 sacks ( 292 bbls ) of class A 1%SOO1 / 3%DO44 / 0.25 lb D130 16.3 lb/gal cement . Droped plug and displaced with 118.5 bbl of salt water. There was 43 bbls of 16.3 cement returned to surface. Plug landed increased pressure to 1700 psi held for 5 minutes with 1 bbl returned to the tub after bleed off. Good circulation through out the job. |
1528813069 | 2018-06-12 | Drill / Deepen / Reopen | No Violations
-up the watermelon bit. According to Roy Reppond from Longuist and companyman for Cargill:
| |
1529067528 | 2018-06-15 | Drill / Deepen / Reopen | No Violations | I found HAD Rig 249 tripping out of the borehole to pick-up a new mud motor to begin building the curve. There are no violations at this time. |
1529327687 | 2018-06-18 | Drill / Deepen / Reopen | No Violations | |
1844779553 | 2018-05-18 | Drill / Deepen / Reopen | No Violations | |
1869945964 | 2018-06-27 | Drill / Deepen / Reopen | No Violations | I found HAD Rig 249 has complete moved off location. The wellhead is currently shut-in. |
2138755817 | 2018-05-22 | Solution Mining Project | No Violations | I was on location to witness the 10.75 casing string pressure test prior to drilling the float shoe out. H A D Drilling Rig # 249 was the drilling contractor for Cargill Inc. The 10.75 was set at approximately 592 K B. H A D drilling pressured the casing up to 577 psi ( 0520 hrs.) to initiate the test. The duration of the test was thirty ( 30 ) minutes. The final recorded pressure was 568 psi. The loss of nine (9) psi represented a 1.5% decline, well within the test parameters. I passed the test and approved drilling ahead. |
For data sources see[3]