X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-083-56717"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-083-56717
 
| Well ID: 37-083-56717
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.946597, -78.782533 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.946597, -78.782533 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 05/28/2015
+
| Spud Date: 2015-05-28
 
|-
 
|-
| Permit Date: 2/2/2015
+
| Permit Date: 2015-02-02
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 97
 
| style="text-align: right;" | 97
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 76: Line 101:
 
| style="text-align: right;" | 69
 
| style="text-align: right;" | 69
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 85: Line 110:
 
| style="text-align: right;" | 294
 
| style="text-align: right;" | 294
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 116: Line 141:
 
| 2376424
 
| 2376424
 
| Primary Facility
 
| Primary Facility
| 06/02/2015
+
| 2015-06-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 123: Line 148:
 
| 2381311
 
| 2381311
 
| Primary Facility
 
| Primary Facility
| 06/18/2015
+
| 2015-06-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 130: Line 155:
 
| 2385698
 
| 2385698
 
| Primary Facility
 
| Primary Facility
| 06/03/2015
+
| 2015-06-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 137: Line 162:
 
| 2386327
 
| 2386327
 
| Primary Facility
 
| Primary Facility
| 07/09/2015
+
| 2015-07-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 144: Line 169:
 
| 2390032
 
| 2390032
 
| Primary Facility
 
| Primary Facility
| 07/14/2015
+
| 2015-07-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 151: Line 176:
 
| 2392877
 
| 2392877
 
| Primary Facility
 
| Primary Facility
| 07/23/2015
+
| 2015-07-23
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 158: Line 183:
 
| 2403355
 
| 2403355
 
| Primary Facility
 
| Primary Facility
| 08/26/2015
+
| 2015-08-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 165: Line 190:
 
| 2412908
 
| 2412908
 
| Primary Facility
 
| Primary Facility
| 09/24/2015
+
| 2015-09-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 172: Line 197:
 
| 2413370
 
| 2413370
 
| Primary Facility
 
| Primary Facility
| 09/01/2015
+
| 2015-09-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 179: Line 204:
 
| 2438557
 
| 2438557
 
| Primary Facility
 
| Primary Facility
| 10/28/2015
+
| 2015-10-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 219: Line 244:
 
| 729697
 
| 729697
 
| 07/14/2015
 
| 07/14/2015
| 07/23/2015
+
| 2015-07-14
 
| CSL 401 - PROHIBITION AGAINST OTHER POLLUTIONS - Discharged substance of any kind or character resulting in pollution of Waters of the Commonwealth.
 
| CSL 401 - PROHIBITION AGAINST OTHER POLLUTIONS - Discharged substance of any kind or character resulting in pollution of Waters of the Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 227: Line 252:
 
| 729698
 
| 729698
 
| 07/14/2015
 
| 07/14/2015
| 07/23/2015
+
| 2015-07-14
 
| 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 235: Line 260:
 
| 729699
 
| 729699
 
| 07/14/2015
 
| 07/14/2015
| 07/23/2015
+
| 2015-07-14
 
| 102.22(b)1 - SITE STABILIZATION – TEMPORARY STABILIZATION – Permitee failed to temporarily stabilize the site to protect it from accelerated erosion and sedimentation where cessation of earth disturbance activities exceeded 4 days.
 
| 102.22(b)1 - SITE STABILIZATION – TEMPORARY STABILIZATION – Permitee failed to temporarily stabilize the site to protect it from accelerated erosion and sedimentation where cessation of earth disturbance activities exceeded 4 days.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 243: Line 268:
 
| 729700
 
| 729700
 
| 07/14/2015
 
| 07/14/2015
| 07/23/2015
+
| 2015-07-14
 
| 78.53 - EROSION AND SEDIMENT CONTROL - Operator failed to design, implement and maintain best management practices and an erosion and sediment control plan in accordance with 25 Pa. Code Chapter 102, during and after earthmoving or soil disturbing ac
 
| 78.53 - EROSION AND SEDIMENT CONTROL - Operator failed to design, implement and maintain best management practices and an erosion and sediment control plan in accordance with 25 Pa. Code Chapter 102, during and after earthmoving or soil disturbing ac
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 265: Line 290:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/23/2015
+
| 2015-07-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 274: Line 299:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/23/2015
+
| 2015-07-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 283: Line 308:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/23/2015
+
| 2015-07-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 292: Line 317:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 07/23/2015
+
| 2015-07-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 303: Line 328:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 14:59, 26 July 2019

Well Details

Well ID: 37-083-56717
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Corydon Township
Operator Name: COASTAL PETRO CORP
Well Pad ID:
Farm/Lease Name: WARRANT 4874 13
License Status: Active
Spud Date: 2015-05-28
Permit Date: 2015-02-02
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.946597
Longitude: -78.782533

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 COASTAL PETRO CORP 2,022.30 107 766.16 97 0.00 0
2016 COASTAL PETRO CORP 1,850.00 364 448.06 69 0.00 0
2017 COASTAL PETRO CORP 561.20 364 119.14 294 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2376424 Primary Facility 2015-06-02 Routine/Complete Inspection No Violations Noted
2381311 Primary Facility 2015-06-18 Routine/Complete Inspection No Violations Noted
2385698 Primary Facility 2015-06-03 Drilling/Alteration No Violations Noted
2386327 Primary Facility 2015-07-09 Routine/Complete Inspection No Violations Noted
2390032 Primary Facility 2015-07-14 Routine/Complete Inspection Violation(s) Noted
2392877 Primary Facility 2015-07-23 Compliance Evaluation No Violations Noted
2403355 Primary Facility 2015-08-26 Routine/Complete Inspection No Violations Noted
2412908 Primary Facility 2015-09-24 Routine/Complete Inspection No Violations Noted
2413370 Primary Facility 2015-09-01 Drilling/Alteration No Violations Noted
2438557 Primary Facility 2015-10-28 Routine/Complete Inspection No Violations Noted
2508832 Primary Facility 2016-08-08 Routine/Complete Inspection No Violations Noted
2567064 Primary Facility 2017-03-02 Routine/Complete Inspection No Violations Noted
2629849 Primary Facility 2017-08-28 Site Restoration No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2390032 729697 07/14/2015 2015-07-14 CSL 401 - PROHIBITION AGAINST OTHER POLLUTIONS - Discharged substance of any kind or character resulting in pollution of Waters of the Commonwealth. Environmental Health & Safety
2390032 729698 07/14/2015 2015-07-14 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. Environmental Health & Safety
2390032 729699 07/14/2015 2015-07-14 102.22(b)1 - SITE STABILIZATION – TEMPORARY STABILIZATION – Permitee failed to temporarily stabilize the site to protect it from accelerated erosion and sedimentation where cessation of earth disturbance activities exceeded 4 days. Environmental Health & Safety
2390032 729700 07/14/2015 2015-07-14 78.53 - EROSION AND SEDIMENT CONTROL - Operator failed to design, implement and maintain best management practices and an erosion and sediment control plan in accordance with 25 Pa. Code Chapter 102, during and after earthmoving or soil disturbing ac Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
729697 327478 NOV - Notice of Violation Comply/Closed 2015-07-23
729698 327478 NOV - Notice of Violation Comply/Closed 2015-07-23
729699 327478 NOV - Notice of Violation Comply/Closed 2015-07-23
729700 327478 NOV - Notice of Violation Comply/Closed 2015-07-23

For data sources see[5]

References