X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-039-23327"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-039-23327
 
| Well ID: 37-039-23327
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.767249, -79.758550 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.767249, -79.758550 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 1/1/1800
+
| Spud Date: 1800-01-01
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 173: Line 198:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 182: Line 207:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 191: Line 216:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 234:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 243:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 252:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 261:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 270:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 254: Line 279:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 263: Line 288:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 272: Line 297:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 428: Line 453:
 
| 378618
 
| 378618
 
| Primary Facility
 
| Primary Facility
| 07/13/1995
+
| 1995-07-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 435: Line 460:
 
| 379378
 
| 379378
 
| Primary Facility
 
| Primary Facility
| 08/02/1995
+
| 1995-08-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 442: Line 467:
 
| 380347
 
| 380347
 
| Primary Facility
 
| Primary Facility
| 07/25/1995
+
| 1995-07-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 449: Line 474:
 
| 380361
 
| 380361
 
| Primary Facility
 
| Primary Facility
| 04/01/1996
+
| 1996-04-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 456: Line 481:
 
| 380362
 
| 380362
 
| Primary Facility
 
| Primary Facility
| 04/04/1996
+
| 1996-04-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 463: Line 488:
 
| 380364
 
| 380364
 
| Primary Facility
 
| Primary Facility
| 04/01/1996
+
| 1996-04-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 470: Line 495:
 
| 380605
 
| 380605
 
| Primary Facility
 
| Primary Facility
| 06/13/1996
+
| 1996-06-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 489: Line 514:
 
| 98847
 
| 98847
 
| 01/13/1993
 
| 01/13/1993
| 08/24/1995
+
| 1993-01-13
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 497: Line 522:
 
| 98848
 
| 98848
 
| 01/13/1993
 
| 01/13/1993
| 09/13/1999
+
| 1993-01-13
 
| 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table
 
| 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table
 
| Administrative
 
| Administrative
Line 505: Line 530:
 
| 100866
 
| 100866
 
| 07/01/1993
 
| 07/01/1993
| 08/24/1995
+
| 1993-07-01
 
| 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan
 
| 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan
 
| Administrative
 
| Administrative
Line 529: Line 554:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:39, 26 July 2019

Well Details

Well ID: 37-039-23327
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: Rome Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: JACK M PRESTON 3
License Status: Active
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.767249
Longitude: -79.758550

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1993 RANGE OPR CO 22,748.00 334 0.00 0 0.00 0
1996 RANGE OPR CO 4,816.00 365 0.00 0 0.00 0
1997 RANGE OPR CO 3,499.00 365 0.00 0 0.00 0
1998 RANGE OPR CO 2,061.00 365 0.00 0 0.00 0
1999 RANGE OPR CO 1,947.00 365 0.00 0 0.00 0
2000 RANGE RESOURCES APPALACHIA LLC 1,988.00 365 0.00 0 0.00 0
2001 RANGE RESOURCES APPALACHIA LLC 1,956.00 365 0.00 0 0.00 0
2002 RANGE RESOURCES APPALACHIA LLC 1,757.00 365 0.00 0 0.00 0
2003 RANGE RESOURCES APPALACHIA LLC 2,294.97 365 0.00 0 0.00 0
2004 RANGE RESOURCES APPALACHIA LLC 2,406.68 365 0.00 0 0.00 0
2005 RANGE RESOURCES APPALACHIA LLC 1,814.68 365 0.00 0 0.00 0
2006 RANGE RESOURCES APPALACHIA LLC 1,901.44 365 0.00 0 0.00 0
2007 RANGE RESOURCES APPALACHIA LLC 1,752.00 365 0.00 0 0.00 0
2008 RANGE RESOURCES APPALACHIA LLC 1,534.74 365 0.00 0 0.00 0
2009 RANGE RESOURCES APPALACHIA LLC 1,016.12 365 0.00 0 0.00 0
2010 RANGE RESOURCES APPALACHIA LLC 1,733.96 365 0.00 0 0.00 0
2011 RANGE RESOURCES APPALACHIA LLC 1,828.23 365 0.00 0 0.00 0
2012 RANGE RESOURCES APPALACHIA LLC 1,595.87 366 0.00 0 0.00 0
2013 RANGE RESOURCES APPALACHIA LLC 1,866.00 365 0.00 0 0.00 0
2014 RANGE RESOURCES APPALACHIA LLC 2,031.00 365 0.00 0 0.00 0
2015 RANGE RESOURCES APPALACHIA LLC 1,888.00 365 0.00 0 0.00 0
2016 RANGE RESOURCES APPALACHIA LLC 1,731.00 365 0.00 0 0.00 0
2017 RANGE RESOURCES APPALACHIA LLC 1,532.00 365 0.00 0 0.00 0
2018 RANGE RESOURCES APPALACHIA LLC 1,268.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
1993-A00 Brine 180.00 Bbl

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
372954 Primary Facility 1992-12-23 Drilling/Alteration No Violations Noted
373026 Primary Facility 1993-01-13 Drilling/Alteration Violation(s) Noted
373027 Primary Facility 1993-02-02 Routine/Complete Inspection No Violations Noted
373085 Primary Facility 1993-01-14 Drilling/Alteration No Violations Noted
373100 Primary Facility 1993-01-13 Drilling/Alteration No Violations Noted
373113 Primary Facility 1993-01-28 Drilling/Alteration No Violations Noted
373128 Primary Facility 1993-01-28 Routine/Complete Inspection No Violations Noted
373181 Primary Facility 1993-01-28 Drilling/Alteration No Violations Noted
373277 Primary Facility 1993-01-18 Routine/Complete Inspection No Violations Noted
373278 Primary Facility 1993-02-05 Drilling/Alteration No Violations Noted
373388 Primary Facility 1993-03-19 Routine/Complete Inspection No Violations Noted
373577 Primary Facility 1993-04-06 Routine/Complete Inspection No Violations Noted
373734 Primary Facility 1993-05-12 Routine/Complete Inspection No Violations Noted
374119 Primary Facility 1993-07-01 Routine/Complete Inspection Violation(s) Noted
375469 Primary Facility 1994-01-31 Routine/Complete Inspection No Violations Noted
375665 Primary Facility 1994-03-09 Routine/Complete Inspection No Violations Noted
378618 Primary Facility 1995-07-13 Routine/Complete Inspection No Violations Noted
379378 Primary Facility 1995-08-02 Routine/Complete Inspection No Violations Noted
380347 Primary Facility 1995-07-25 Routine/Complete Inspection No Violations Noted
380361 Primary Facility 1996-04-01 Routine/Complete Inspection No Violations Noted
380362 Primary Facility 1996-04-04 Routine/Complete Inspection No Violations Noted
380364 Primary Facility 1996-04-01 Routine/Complete Inspection No Violations Noted
380605 Primary Facility 1996-06-13 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
373026 98847 01/13/1993 1993-01-13 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
373026 98848 01/13/1993 1993-01-13 78.56.9101.4 - Impoundment not; permitted or approved, structurally sound, impermeable, third party protected, 2 ft freeboard, inadequate liner, subbase, slopes, capacity, surface water not diverted, w/in 20 inches of high ground water table Administrative
374119 100866 07/01/1993 1993-07-01 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan Administrative

For data sources see[6]

References